← Back
Two family brick
1235 EAST 92 STREET
BROOKLYN · BIN 3347489
💬 Discuss this project
2000Year Built
2Stories
B1Building Class
R4-1Zoning
—Gross Floor Area
2Units
18 Open Violations ▸FDNY Report ↗
Two family brick · 0.67 FAR built · Flood zone X500
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SUNRUN309/13/2026
RAZI CONSTRUCTION CO503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC208/28/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MANUEL MEROElectrical403/21/2026
LUNA NYC ELECTRIC CORPElectrical103/22/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/19/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272208/28/2026
Building Lifecycle
All (36)Filed (2)Permit Issued (1)Violation (23)Special Inspection (10)
08/28/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01430575-P1
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/28/2026
Special inspection requirement — Final
Walid Abdulla
08/28/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
08/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
08/28/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
08/28/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
08/28/2026
Special inspection requirement — Final
Walid Abdulla
08/28/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
07/17/2026
Permit issued — Solar
B01430575-I1-SL
07/15/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF-MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01430575-I1
05/08/2026
Violation issued (HPD, open)
A
11/20/2025
Violation issued (HPD, open)
I
06/13/2025
Violation issued (HPD, open)
A
11/29/2024
Violation issued (HPD, open)
I
04/17/2024
Violation issued (HPD, open)
A
11/22/2023
Violation issued (HPD, open)
I
03/31/2023
Violation issued (HPD, open)
A
11/14/2022
Violation issued (HPD, open)
I
03/10/2022
Violation issued (HPD, open)
A
03/10/2022
Violation issued (HPD, open)
I
04/20/2021
Violation issued (HPD, open)
I
04/20/2021
Violation issued (HPD, open)
A
11/06/2019
Violation issued (HPD, open)
I
10/26/2018
Violation issued (HPD, open)
I
12/11/2017
Violation issued (HPD, open)
I
11/29/2016
Violation issued (HPD, open)
I
10/20/2015
Violation issued (HPD, open)
I
03/05/2015
Violation issued (HPD, open)
I
01/30/2001
Violation issued (ECB, closed)
Construction
10/23/2000
Violation issued (ECB, closed)
Construction
08/10/2000
Violation issued (ECB, closed)
Construction
08/10/2000
Violation issued (ECB, closed)
Construction
07/20/2000
Violation issued (ECB, closed)
Site Safety
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC07/17/2026
BIS—ISSUEDOCEAN MANAGEMENT CO02/26/2001
BISPLISSUEDJ R PIPIN DBA BOGART'S PLBG07/13/2000
BIS—ISSUEDRAZI CONSTRUCTION CO05/17/2000
BISEQISSUEDRAZI CONSTRUCTION CO05/17/2000
3 projects · most recent 07/14/2026
HVAC Wiring General Wiring
FiledStatusContractorScope
07/14/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
06/17/2026Permit IssuedALL BALANCED ELECTRICAL INC.HVAC Wiring
07/02/2025CompleteLUNA NYC ELECTRIC CORPGeneral Wiring
1 project · most recent 08/28/2026
FiledStatusContractorScope
08/28/2026Permit IssuedSUNRUN INSTALLATION SVC28 panels, 12.6 kw, 294.32 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
08/28/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/28/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/28/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/28/2026FinalWalid Abdullaprogress
08/28/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
08/28/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
08/28/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
08/28/2026Energy Code Compliance InspectionsWalid Abdullaprogress
08/28/2026FinalWalid Abdullaprogress
08/28/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01430575-I1Request digital key ↗
▸Seals & Professional Certifications12
▸DOB NOWProgress Inspector Seal & Signature6
09/23/2026B01430575-P1Open ↗
09/23/2026B01430575-P1Open ↗
09/23/2026B01430575-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B01430575-P1Open ↗
09/23/2026B01430575-P1Open ↗
09/01/2026B01430575-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/14/2026B01430575-P1Open ↗
08/16/2026B01430575-I1Open ↗