← Back
Condo, residential unit in elevator building
The Beekman East Condominium
120 OCEANA DRIVE WEST · BIN 3347499
💬 Discuss this project
2000Year Built
6Stories
R4Building Class
R7-1Zoning
134,228 sfGross Floor Area
124Units
LL97 CoveredRent Stabilized25 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · 54,944 sf lot · 2.44 FAR built · Flood zone AE
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
CellarUnder Construction3p · 2 filings · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BEEKMAN EAST CONDO709/01/2026
OCEANA CONDOMINIUM NO. TWO303/22/2026
BRIGHTON DEVELOPMENT803/22/2026
TAUBE MANAGEMENT REALTY203/21/2026
BIRHTON DEVELOPMENT103/21/2026
OCEANA CONDOMINIUM NUMBER 2103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EDG204/10/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LMS-ACE SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
EVERFOCUS CONTRACTING SERGeneral Contractor409/01/2026
HIGHLAND PLUMBING LLCPlumbing203/22/2026
EDGAR LEVENSTEINElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899204/10/2026
EDG2578204/10/2026
Building Lifecycle
All (64)Filed (2)Permit Issued (2)Facade (FISP) (12)Violation (43)Special Inspection (5)
08/31/2026
Permit issued — General Construction
B01383433-I1-ST
04/10/2026
Filed — Alteration
Temporary shoring and garage repairs on the cellar floor as shown on the drawings filed herewith. No change in use, egress, or occupancy.
B01383433-I1
04/10/2026
Special inspection requirement — Post-installed Anchors
VIVEK SHAH
04/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
ARIEL GOLSHAN
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIVEK SHAH
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
VIVEK SHAH
04/06/2026
Special inspection requirement — Final
Hichem Mohamadi
02/09/2026
Permit issued — Structural
B01338835-I1-ST
01/02/2026
Filed — Alteration
Installation of temporary shoring as shown on the drawings filed herewith. No change in use, egress, or occupancy.
B01338835-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/30/2023
Violation issued (HPD, closed)
A
02/15/2023
Cycle 9 facade report submitted
02/15/2023
Cycle 9 facade report signed — SAFE
02/02/2023
Cycle 9 facade inspection completed
10/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/16/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/05/2019
Violation issued (ECB, closed)
Elevators
08/05/2019
Violation issued (ECB, closed)
Elevators
03/21/2019
Cycle 8 facade report signed — SWARMP
02/18/2019
Cycle 8 facade report submitted
02/05/2019
Cycle 8 facade inspection completed
07/31/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/25/2016
Violation issued (HPD, closed)
I
03/16/2016
Violation issued (HPD, open)
B
12/17/2013
Violation issued (FDNY_ORDER, closed)
09/16/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/21/2012
Cycle 7 facade report submitted
08/16/2012
Cycle 7 facade report signed — SAFE
08/09/2012
Cycle 7 facade inspection completed
01/09/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/09/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/13/2011
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/31/2009
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/20/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/20/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/18/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/18/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/20/2007
Cycle 6 facade report submitted
01/30/2007
Cycle 6 facade report signed — SAFE
01/04/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/04/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/01/2006
Cycle 6 facade inspection completed
12/01/2003
Violation issued (HPD, closed)
B
12/01/2003
Violation issued (HPD, closed)
B
12/01/2003
Violation issued (HPD, closed)
B
05/22/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2001
Violation issued (ECB, closed)
Construction
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedEVERFOCUS CONTRACTING SER08/31/2026
DOB NOWStructuralPermit IssuedEVERFOCUS CONTRACTING SER02/09/2026
BISMHISSUEDPUMA CONSTRUCTION CORP04/06/2018
BISOTISSUEDES DECOR AND DESIGN LLC10/04/2016
BISPLISSUEDHIGHLAND PLUMBING LLC08/29/2016
BISMHISSUEDPUMA CONSTRUCTION CORP08/18/2016
BISOTISSUEDPUMA CONSTRUCTION CORP09/09/2014
BISBLISSUEDSMART PLBG & HTG CORP05/13/2014
BISPLISSUEDSMART PLBG & HTG CORP05/13/2014
BISOTISSUEDRAPID ENTERPRISES, INC10/19/2005
BISOTISSUEDRAPID ENTERPRISES INC07/01/2005
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC05/03/2002
BISPLISSUEDSTARLITE PLBG & HTG05/02/2002
BISOTISSUEDWONDER WORKS CONSTR CORP04/12/2002
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC10/09/2001
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC06/19/2001
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC05/22/2001
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC03/29/2001
BISPLISSUEDDUO PLUMBING & HTG CORP.06/13/2000
BISPLISSUEDDUO PLUMBING & HTG CORP.06/13/2000
BIS—ISSUEDBRIGHTONDEVELOPMENT LLC05/23/2000
1 project · most recent 10/25/2019
FiledStatusContractorScope
10/25/2019Permit IssuedCONTACT PLUS ELEC'L CORP—
2 projects · most recent 04/10/2026
Concrete
FiledStatusContractorScope
04/10/2026Permit IssuedEVERFOCUS CONTRACTING SERConcrete
01/02/2026Permit IssuedEVERFOCUS CONTRACTING SER2 scope_items
1 project · most recent 01/02/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
01/02/2026Permit IssuedEVERFOCUS CONTRACTING SERTenant Protection Plan 72 Hour
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/10/2026Post-installed AnchorsVIVEK SHAHspecial
04/06/2026Tenant Protection Plan ComplianceARIEL GOLSHANspecial
04/06/2026Structural Stability – Alterations of existing buildingsVIVEK SHAHspecial
04/06/2026Concrete - Cast-In-PlaceVIVEK SHAHspecial
04/06/2026FinalHichem Mohamadiprogress
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
09/03/2026B01383433-I1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION13
07/30/2024340413207Open ↗
07/29/2024340413207Open ↗
07/25/2024340413207Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION4
04/09/2018340413207Open ↗
08/29/2016340413207Open ↗
08/16/2016340413207Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records2
▸BISFLOOD ZONE COMPLIANCE1
08/02/2024340413207Open ↗
▸BISFLOOD ZONE DESIGN CERTIFICATION1
08/16/2016340413207Open ↗
▸Seals & Professional Certifications18
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
10/06/2016321460067Open ↗
08/16/2016340413207Open ↗
09/08/2014340183811Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
08/16/2016340413207Open ↗
09/08/2014340183811Open ↗
05/07/2014340141876Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
08/16/2016340413207Open ↗
09/08/2014340183811Open ↗
05/07/2014340141876Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/05/2017321460067Open ↗
10/06/2016321460067Open ↗
05/21/2015340183811Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/29/2026B01383433-I1Open ↗
08/29/2026B01383433-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/06/2016321460067Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
09/03/2026B01383433-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/29/2026B01383433-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
08/26/2014340141876Open ↗
05/07/2014340141876Open ↗
▸BISSCHEDULE B - PLUMBING2
08/16/2016340413207Open ↗
05/07/2014340141876Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/02/2024340413207Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/02/2024340413207Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
09/11/2014340141876Open ↗
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
10/06/2016321460067Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
08/02/2024340413207Open ↗
08/16/2016340413207Open ↗
05/07/2014340141876Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
09/05/2017321460067Open ↗
10/06/2016321460067Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
08/16/2016340413207Open ↗
05/07/2014340141876Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/02/2024340413207Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/02/2024340413207Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
09/05/2017321460067Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/02/2024340413207Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY6
08/02/2024340413207Open ↗
08/16/2016340413207Open ↗
09/08/2014340183811Open ↗
Showing 3 of 6 on file for this type
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
09/11/2014340141876Open ↗
▸BISMECHANICAL SYSTEMS1
08/02/2024340413207Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/05/2024340413207Open ↗
09/05/2017321460067Open ↗
05/21/2015340183811Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT6
09/05/2017321460067Open ↗
10/06/2016321460067Open ↗
08/16/2016340413207Open ↗
Showing 3 of 6 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
08/02/2024340413207Open ↗
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION6
07/30/2024340413207Open ↗
07/25/2024340413207Open ↗
04/19/2018340413207Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
08/16/2016340413207Open ↗
09/08/2014340183811Open ↗
05/07/2014340141876Open ↗
▸BISBOROUGH INTAKE FORM1
09/05/2017321460067Open ↗
▸BISEFILING COVER SHEET1
10/05/2016321460067Open ↗
▸Other Documents5
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
08/05/2024340413207Open ↗
09/08/2014340183811Open ↗
▸BISOP-4 - Special Report1
05/21/2015340183811Open ↗
▸BISSUBSTANTIAL IMPROVEMENT CALCULATIONS1
08/16/2016340413207Open ↗
▸BISMAINTENANCE INFORMATION1
08/02/2024340413207Open ↗