← Back
Condo, residential unit in 2-10 unit building
Marke Gardens Condominium
240 FRANKLIN AVENUE · BIN 3378338
💬 Discuss this project
2004Year Built
5Stories
R1Building Class
R6AZoning
12,208 sfGross Floor Area
8Units
Rent Stabilized7 Open Violations 6 unresolved · 1 paperwork only ▸FDNY Report ↗
Condo, residential unit in 2-10 unit building · 2,500 sf lot · 4.88 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY407/08/2026
STEEL CONSTRUCTION407/08/2026
MSHADATHLLC303/22/2026
240-242 FRANKLIN AVE1003/22/2026
OWNER OF 240 FRANKLIN AVE103/22/2026
MARKE GARDENS CONDOMINIUM ASSOCIATION203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EMPIRE DESIGN CORP107/31/2024
MJE PROFESSIONAL SERVICES107/26/2024
SYED ENGINEERING, P.C.106/04/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
M. SHADATH CONTRACTING, LGeneral Contractor303/21/2026
TREVOR DUNWELLElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor107/08/2026
STEEL CONSTRUCTION LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
EMPIRE DESIGN CORP5474107/31/2024
Building Lifecycle
All (24)Filed (3)Permit Issued (3)Signed Off (3)Violation (11)Special Inspection (4)
07/10/2025
Signed off — Alteration
B01087008-I1
06/11/2025
Signed off — Alteration
APPLICATION FILE FOR REPLACING EXISTING BALCONY SLAB & RAILING AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01089597-I1
08/15/2024
Permit issued — General Construction
B01089597-I1-GC
07/31/2024
Filed — Alteration
APPLICATION FILE FOR REPLACING EXISTING BALCONY SLAB & RAILING AS PER PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B01089597-I1
07/31/2024
Special inspection requirement — Masonry
Md Rashid
07/31/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Md Rashid
07/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
Md Rashid
07/31/2024
Special inspection requirement — Final
Md Rashid
07/26/2024
Filed — Alteration
B01087008-I1
07/26/2024
Permit issued — Supported Scaffold
B01087008-I1-SF
04/16/2024
Violation issued (HPD, closed)
A
03/08/2022
Violation issued (HPD, closed)
I
03/08/2022
Violation issued (HPD, closed)
A
07/15/2021
Signed off — Alteration
B00528307-I1
06/04/2021
Filed — Alteration
B00528307-I1
06/04/2021
Permit issued — Sidewalk Shed
B00528307-I1-SH
04/19/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
10/25/2018
Violation issued (HPD, closed)
I
10/19/2015
Violation issued (HPD, closed)
I
04/09/2014
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/16/2002
Violation issued (ECB, closed)
Site Safety
04/02/2001
Violation issued (ECB, closed)
Construction
04/02/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offM. SHADATH CONTRACTING, L08/15/2024
DOB NOWSupported ScaffoldSigned-offSTEEL CONSTRUCTION LLC07/26/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/04/2021
BISMHISSUEDROYAL CONST & ROOFING INC05/24/2006
BISEQISSUEDROYAL CONST & ROOFING INC05/24/2006
BIS—ISSUEDROYAL CONSTRUCTION11/05/2003
BISEQISSUEDROYAL CONSTRUCTION10/30/2003
BIS—ISSUEDROYAL CONSTRUCTION07/17/2003
BISPLISSUEDPROGRAM UNLIMITED PLBG & HTG04/28/2003
BISEQISSUEDROYAL CONSTRUCTION02/19/2003
BISSPISSUEDPROGRAM UNLIMITED PLBG & HTG12/02/2002
BIS—ISSUEDROYAL CONSTRUCTION09/23/2002
BIS—ISSUEDROYAL CONSTRUCTION02/11/2002
BIS—ISSUEDROYAL CONSTRUCTION10/03/2001
BIS—ISSUEDROYAL CONSTRUCTION01/23/2001
BISEQISSUEDROYAL CONSTRUCTION01/23/2001
1 project · most recent 01/17/2024
FiledStatusContractorScope
01/17/2024Permit IssuedAPPROVED ELECTRIC CORP.5 meters, 1 new_meters
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/31/2024MasonryMd Rashidspecial
07/31/2024Structural Stability – Alterations of existing buildingsMd Rashidspecial
07/31/2024Tenant Protection Plan ComplianceMd Rashidspecial
07/31/2024FinalMd Rashidprogress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00528307-I1Request digital key ↗
08/24/2026B01087008-I1Request digital key ↗
08/24/2026B01089597-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00528307-I1Open ↗
08/24/2026B01087008-I1Open ↗
08/13/2026B01089597-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026B01089597-I1Open ↗
08/26/2026B01089597-I1Open ↗
08/26/2026B01089597-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026B01089597-I1Open ↗