← Back
Condo, residential unit in walk-up building
63 STAGG STREET
BROOKLYN · BIN 3387780
💬 Discuss this project
2004Year Built
4Stories
R2Building Class
R6BZoning
25,336 sfGross Floor Area
16Units
LL97 CoveredRent Stabilized5 Open Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: UNAVAILABLE OWNER · 6,000 sf lot · 4.22 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
Nothing on file for this building.
Building Lifecycle
All (31)Filed (2)Permit Issued (2)Signed Off (2)Violation (20)Special Inspection (5)
06/13/2025
Violation issued (HPD, closed)
A
11/26/2024
Violation issued (HPD, closed)
I
09/04/2024
Signed off — Alteration
SBS roof replacement at bulkhead and vent shafts , installation of IRMA roof assembly, Door Saddle Waterproofing and Metal Panel Assembly as per plans filed. No change in use, egress or occupancy.
B00881377-I1
05/25/2024
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00940734-I1
05/03/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/17/2023
Violation issued (HPD, closed)
I
10/16/2023
Permit issued — General Construction
B00881377-I1-GC
10/03/2023
Permit issued — Sidewalk Shed
B00940734-I1-SH
10/02/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00940734-I1
06/13/2023
Filed — Alteration
SBS roof replacement at bulkhead and vent shafts , installation of IRMA roof assembly, Door Saddle Waterproofing and Metal Panel Assembly as per plans filed. No change in use, egress or occupancy.
B00881377-I1
06/12/2023
Special inspection requirement — Tenant Protection Plan Compliance
Craig Jirak
05/26/2023
Special inspection requirement — Masonry
Craig Jirak
05/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BRIAN O'CONNOR
05/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Craig Jirak
05/26/2023
Special inspection requirement — Final
Craig Jirak
03/08/2022
Violation issued (HPD, closed)
A
02/02/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/02/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/19/2021
Violation issued (HPD, closed)
A
04/19/2021
Violation issued (HPD, closed)
I
12/07/2017
Violation issued (HPD, closed)
I
05/18/2017
Violation issued (FDNY_NOV, closed)
01/18/2012
Violation issued (FDNY_NOV, closed)
05/11/2011
Violation issued (FDNY_NOV, closed)
05/11/2011
Violation issued (FDNY_NOV, closed)
05/11/2011
Violation issued (FDNY_NOV, closed)
03/04/2004
Violation issued (ECB, closed)
Construction
10/19/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO407/08/2026
LEITER PROPERTY MANAGEMENT303/22/2026
THE OWNER OF 63 STAGG ST103/22/2026
STAGG PLAZA403/21/2026
STAGG STREET LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASR ENGINEERING PC110/02/2023
RAK DESIGN INC.106/13/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
CSR EXPEDITERS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROBUILDERO CORPGeneral Contractor303/21/2026
JASCO, INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RAK DESIGN INC.7699206/13/2023
ROCK ARCH ENG CORP1760106/13/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offPROBUILDERO CORP10/16/2023
DOB NOWSidewalk ShedSigned-offJASCO, INC10/03/2023
BISEQISSUEDSUPERIOR CONSTRUCTION CORP.01/07/2005
BISEQISSUEDSUPERIOR CONSTRUCTION CONSULT IN01/03/2005
BIS—ISSUEDSUPERIOR CONSTRUCTION CORP.01/03/2005
BIS—ISSUEDSUPERIOR CONSTRUCTION CORP.02/24/2004
BISEQISSUEDSUPERIOR CONSTRUCTION CORP.02/10/2004
BISEQISSUEDSUPERIOR CONSTRUCTION CONSULT IN01/29/2004
BISEQISSUEDSUPERIOR CONSTRUCTION CORP.11/26/2003
BISPLISSUEDMILLENIUM MECHANCIAL CONTR. INC10/23/2003
BIS—ISSUEDSUPERIOR CONSTRUCTION CORP.09/12/2003
BIS—ISSUEDSUPERIOR CONSTRUCTION CORP.07/01/2003
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/12/2023Tenant Protection Plan ComplianceCraig Jirakspecial
05/26/2023MasonryCraig Jirakspecial
05/26/2023Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
05/26/2023Energy Code Compliance InspectionsCraig Jirakprogress
05/26/2023FinalCraig Jirakprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/27/2026B00881377-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWSpecial Inspector Seal & Signature3
08/23/2026B00881377-I1Open ↗
08/23/2026B00881377-I1Open ↗
08/23/2026B00881377-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00881377-I1Open ↗
08/13/2026B00940734-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/23/2026B00881377-I1Open ↗
08/23/2026B00881377-I1Open ↗