← Back
Condo, residential unit in walk-up building
319 GRAND AVENUE
BROOKLYN · BIN 3388474
💬 Discuss this project
1989Year Built
3Stories
R2Building Class
R6BZoning
49,712 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized2 Open Violations ▸FDNY Report ↗
Condo, residential unit in walk-up building · Owner of record: CLINTON HILL CONDOMINUM ASSOC CORP · 43,944 sf lot · 1.13 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 33p · 1 filing · 4 docs
Floor 2
Floor 11p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY BUILDING ASSOCIATES INC406/24/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STATE CONTRACTING INCGeneral Contractor107/08/2026
ROCK E SMALL PLBG&HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616206/10/2025
Building Lifecycle
All (21)Filed (4)Permit Issued (2)Signed Off (2)Inspection (5)Objection (4)Special Inspection (4)
07/25/2025
Signed off — Alteration
Existing gas and plumbing work.
B01135201-S2
07/24/2025
Signed off — Alteration
Existing gas and plumbing work.
B01135201-I1
07/23/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
07/21/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
07/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/24/2025
Filed — Alteration
Existing gas and plumbing work.
B01135201-P2
06/10/2025
Filed — Alteration
Existing gas and plumbing work.
B01135201-P1
06/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
04/17/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/04/2025
Permit issued — Plumbing
B01135201-S2-PL
03/27/2025
Objection resolved — Addressed
03/27/2025
Objection resolved — Addressed
03/26/2025
Objection raised — Admin
03/26/2025
Objection raised — Admin
03/24/2025
Filed — Alteration
Existing gas and plumbing work.
B01135201-S2
01/21/2025
Permit issued — General Construction
B01135201-I1-GC
12/03/2024
Filed — Alteration
Existing gas and plumbing work.
B01135201-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC04/04/2025
DOB NOWGeneral ConstructionSigned-offSTATE CONTRACTING INC01/21/2025
1 project · most recent 02/05/2025
General Wiring
FiledStatusContractorScope
02/05/2025CompleteLENS ELECTRIC, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
07/23/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/21/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/17/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/10/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
07/10/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/06/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
▾Documents — 4 on file (BIS + DOB NOW)
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026B01135201-P1Open ↗
08/13/2026B01135201-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B01135201-I1Open ↗
08/25/2026B01135201-P1Open ↗