← Back
Miscellaneous two family
396 BARBEY STREET
BROOKLYN · BIN 3389541
💬 Discuss this project
2005Year Built
2Stories
B9Building Class
R7AZoning
2,200 sfGross Floor Area
2Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Miscellaneous two family · Owner of record: 396 BARBEY BH LLC · 2,000 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 216p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Basement22p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EAST 181 GARDENS1707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/27/2024$999K—— → —$454/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC202/18/2025
VASILIOS ARTEMIOU PE502/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor207/08/2026
CHEN ENGINEERING SERVICESElectrical103/21/2026
SUPERIOR SAFETY CONSULTINElectrical103/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616702/18/2025
Building Lifecycle
All (71)Filed (7)Permit Issued (4)Signed Off (3)Violation (12)Inspection (9)Objection (6)Special Inspection (30)
09/07/2026
Violation issued (HPD, open)
C
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
09/07/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, open)
B
06/04/2026
Violation issued (HPD, open)
B
06/13/2025
Violation issued (HPD, closed)
A
06/09/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/27/2025
Signed off — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S3
05/27/2025
Signed off — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S2
03/03/2025
Signed off — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S1
02/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/24/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
FAHAD FATEH
02/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/24/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/24/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
02/24/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/24/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
02/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
02/24/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
02/24/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
02/24/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
02/24/2025
Special inspection requirement — Metering
FAHAD FATEH
02/24/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
02/18/2025
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-P3
02/13/2025
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-P2
02/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
02/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/13/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
02/13/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
02/05/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/04/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/31/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/31/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/31/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/23/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/23/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
12/12/2024
Permit issued — Plumbing
B01009693-S3-PL
12/10/2024
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-P1
12/05/2024
Permit issued — Mechanical Systems
B01009693-S1-MS
12/05/2024
Permit issued — Sprinklers
B01009693-S2-EW-SP
12/02/2024
Permit issued — General Construction
B01009693-I1-GC
04/12/2024
Objection resolved — Addressed
04/11/2024
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S3
04/11/2024
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S2
04/08/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
04/08/2024
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
04/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/05/2024
Filed — Alteration CO
PROPOSING CONVERSION TO AN EXISTING 2 STORY AND BASEMENT RESIDENTIAL BUILDING. EXISTING 2 UNITS PROPOSING TOTAL OF 10 RESIDENTIAL UNITS. NO CHANGE IN BULK.
B01009693-S1
04/05/2024
Objection raised — Energy
04/04/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
04/04/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
04/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/04/2024
Special inspection requirement — Duct leakage testing, insulation and design
FAHAD FATEH
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN12/12/2024
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP12/05/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC12/05/2024
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP12/02/2024
BISEQISSUEDSHELTER ROCK BUILDER LLC03/27/2006
BIS—ISSUEDSHELTER ROCK BUILDER LLC02/06/2006
BISEQISSUEDSHELTER ROCK BUILDER LLC12/19/2005
BISPLISSUEDPAL-MAR PLBG & HTG INC12/07/2005
BISEQISSUEDSHELTER ROCK BUILDER LLC03/09/2005
BIS—ISSUEDSHELTER ROCK BUILDER LLC03/09/2005
BISEQISSUEDALWAYS FAST INC01/10/2005
BIS—ISSUEDALWAYS FAST INC10/29/2004
BISEQRE-ISSUEDALWAYS FAST INC10/29/2004
BISPLISSUEDZARA PLUMBING CORP11/01/2001
BISBLISSUEDZARA PLUMBING CORP01/12/2001
BISPLRE-ISSUEDZARA PLUMBING CORP01/12/2001
BISPLISSUEDZARA PLUMBING CORP08/26/1999
BIS—ISSUEDTWO SHELLS INTERIORS, INC.07/19/1999
1 project · most recent 02/18/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2025Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin RXF18AXVJU 21,600 BTU · Condensing Unit ×5
RXF12AXVJU 14,400 BTU · Condensing Unit ×4
3MXM24AVJU9 24,000 BTU · Condensing Unit ×1
1 project · most recent 02/18/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/18/2025Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
1 project · most recent 12/08/2024
General Wiring
FiledStatusContractorScope
12/08/2024CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/09/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/05/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/04/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/31/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/31/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/31/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
02/24/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
02/24/2025Exterior Insulation and Finish Systems (EIFS)FAHAD FATEHspecial
02/24/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
02/24/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/24/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/24/2025Fenestration areasFAHAD FATEHenergy_progress
02/24/2025Maintenance informationFAHAD FATEHenergy_progress
02/24/2025Interior lighting powerFAHAD FATEHenergy_progress
02/24/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
02/24/2025Permanent certificateFAHAD FATEHenergy_progress
02/24/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
02/24/2025Fenestration air leakageFAHAD FATEHenergy_progress
02/24/2025MeteringFAHAD FATEHenergy_progress
02/24/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
02/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
02/13/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/13/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/13/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/13/2025Maintenance informationFAHAD FATEHenergy_progress
02/13/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
02/13/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/08/2024Post-installed AnchorsFAHAD FATEHspecial
04/08/2024Sprinkler SystemsFAHAD FATEHspecial
04/08/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/04/2024Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 36.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026B01009693-P1Request digital key ↗
08/25/2026B01009693-S3Request digital key ↗
08/25/2026B01009693-S2Request digital key ↗
Showing 3 of 7 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/13/2026B01009693-P1Open ↗
08/13/2026B01009693-S2Open ↗
08/13/2026B01009693-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01009693-S1Open ↗
09/02/2026B01009693-S1Open ↗
08/30/2026B01009693-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/12/2026B01009693-S2Open ↗
09/02/2026B01009693-S1Open ↗
08/30/2026B01009693-I1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01009693-P3Open ↗
08/13/2026B01009693-I1Open ↗
▸Other Documents2
▸DOB NOWProperty Ownership Certification2
08/13/2026B01009693-P3Open ↗
08/13/2026B01009693-I1Open ↗