← Back
Three families
136 FOUNTAIN AVENUE
BROOKLYN · East New York (North) · BIN 3389571
💬 Discuss this project
2005Year Built
3Stories
C0Building Class
R5BZoning
2,940 sfGross Floor Area
3Units
Rent Stabilized6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Three families · 2,000 sf lot · 1.47 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 38p · 1 filing · 8 docs
Floor 29p · 1 filing · 8 docs
Floor 18p · 1 filing · 8 docs
Cellar5p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC HOUSING PRESV DEVEL803/21/2026
APEX BUILDERS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BOLT ARCHITECTURE212/21/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PROPERTY DAMAGE RESTORATIONGeneral Contractor303/21/2026
EWAN PALMERElectrical103/21/2026
WEBB DEVELOPMENT SVC CORPGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
WASOFF PLBG & UTILITY COPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BOLTARCHITECTURE,PLLC6712212/21/2023
Building Lifecycle
All (50)Filed (2)Permit Issued (4)Violation (20)Inspection (5)Objection (16)Special Inspection (3)
06/03/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/08/2026
Violation issued (HPD, closed)
A
03/13/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/24/2026
Violation issued (ECB, open)
Construction
02/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/30/2026
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
01/27/2026
Inspection — Certified Sprinkler (PL) - SP - Roughing
Certified
View inspection ↗
01/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2025
Violation issued (HPD, closed)
A
05/29/2025
Permit issued — General Construction
B00936293-I1-GC
05/21/2025
Permit issued — Plumbing
B00936293-S1-PL
07/26/2024
Permit issued — Plumbing
B00936293-S1-PL
04/17/2024
Violation issued (HPD, closed)
A
01/05/2024
Permit issued — General Construction
B00936293-I1-GC
12/30/2023
Objection resolved — Addressed
12/30/2023
Objection resolved — Addressed
12/27/2023
Objection raised — Cost
12/27/2023
Objection raised — Scope
12/21/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THREE FAMILY HOUSE INCLUDING THE REPLACEMENT OF GYPSUM WALL BOARDS AND PLUMBING FIXTURES. PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00936293-S1
12/12/2023
Objection resolved — Addressed
12/07/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
12/06/2023
Objection resolved — Addressed
11/17/2023
Violation issued (HPD, closed)
I
10/27/2023
Objection resolved — Addressed
10/24/2023
Objection resolved — Addressed
10/20/2023
Objection raised — Cost
10/20/2023
Objection raised — Scope
10/20/2023
Objection raised — Fire_Protection
10/20/2023
Objection raised — Other
10/20/2023
Objection raised — Fire_Protection
10/20/2023
Objection raised — Scope
10/14/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING THREE FAMILY HOUSE INCLUDING THE REPLACEMENT OF GYPSUM WALL BOARDS AND PLUMBING FIXTURES. PLUMBING WORK TO BE FILED UNDER SUBSEQUENT FILING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00936293-I1
10/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ibrahim Greenidge
10/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ibrahim Greenidge
10/14/2023
Special inspection requirement — Fire-Resistance Rated Construction
Withdrawn
07/15/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/11/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/09/2023
Violation issued (FDNY_ORDER, closed)
05/09/2023
Violation issued (ECB, open)
Construction
05/09/2023
Violation issued (FDNY_ORDER, closed)
05/09/2023
Violation issued (FDNY_ORDER, closed)
05/09/2023
Violation issued (FDNY_ORDER, closed)
05/09/2023
Violation issued (FDNY_ORDER, closed)
03/31/2023
Violation issued (HPD, closed)
A
03/09/2022
Violation issued (HPD, closed)
A
04/20/2021
Violation issued (HPD, closed)
A
11/04/2019
Violation issued (HPD, closed)
I
10/26/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedWEBB DEVELOPMENT SVC CORP05/29/2025
DOB NOWPlumbingSigned-offWASOFF PLBG & UTILITY CO05/21/2025
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP07/26/2024
DOB NOWGeneral ConstructionPermit IssuedPROPERTY DAMAGE RESTORATI01/05/2024
BIS—ISSUEDAPEX BUILDING COMPANY INC04/03/2007
BISPLISSUEDJD PL & HTG09/14/2006
BISOTISSUEDAPEX BUILDING COMPANY INC05/11/2006
BIS—ISSUEDAPEX BUILDING COMPANY INC04/12/2006
BIS—ISSUEDAPEX BUILDING COMPANY INC04/13/2005
BIS—ISSUEDAPEX BUILDING COMPANY INC03/17/2005
1 project · most recent 12/21/2023
Sprinkler System
FiledStatusContractorScope
12/21/2023——Sprinkler System
1 project · most recent 12/21/2023
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
12/21/2023Signed-offWASOFF PLBG & UTILITY COGas, Plumbing-Sprinkler, Water/Sanitary
1 project · most recent 05/15/2025
General Wiring
FiledStatusContractorScope
05/15/2025CompletePRINCIPAL ELECTRICAL CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/13/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
01/27/2026Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
01/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
10/14/2023Fire-Resistant Penetrations and JointsIbrahim Greenidgespecial
10/14/2023Fire-Resistant Penetrations and JointsIbrahim Greenidgespecial
10/14/2023Fire-Resistance Rated ConstructionWithdrawnprogress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/26/2026B00936293-I1Request digital key ↗
08/26/2026B00936293-P3Request digital key ↗
08/26/2026B00936293-S1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/26/2026B00936293-I1Open ↗
08/26/2026B00936293-P3Open ↗
08/26/2026B00936293-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B00936293-I1Open ↗
08/23/2026B00936293-S1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/25/2026B00936293-I1Open ↗