← Back
Two family frame
568 CENTRAL AVENUE
BROOKLYN · BIN 3393206
💬 Discuss this project
1997Year Built
2Stories
B2Building Class
R6Zoning
1,918 sfGross Floor Area
2Units
1 Open Violation ▸FDNY Report ↗
Two family frame · 1,566 sf lot · 1.22 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WORLD DESIGN ARCHITECTURE,PLLC109/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EBC CONSULTING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SOLAR PRO INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WORLD DESIGN ARCHITECTURE9323109/25/2024
Building Lifecycle
All (6)Filed (1)Permit Issued (1)Signed Off (1)Violation (1)Objection (2)
01/21/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01113829-I1
10/18/2024
Permit issued — Solar
B01113829-I1-SL
10/09/2024
Objection resolved — Addressed
09/27/2024
Objection raised — Other
09/25/2024
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXSISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
B01113829-I1
12/31/2018
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSOLAR PRO INC10/18/2024
BIS—ISSUEDBEECHWOOD EIGHT BUILDING CORP07/07/1998
BISPLISSUEDBLAU MECHANICAL CORP01/05/1998
BIS—ISSUEDBEECHWOOD EIGHT BUILDING CORP10/03/1997
1 project · most recent 09/11/2024
FiledStatusContractorScope
09/11/2024CompleteFLOW STATE ELECTRIC, LLC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
09/18/2024Fire-Resistant Penetrations and JointsWilliam Aliceaspecial
09/18/2024Structural Stability – Alterations of existing buildingsWilliam Aliceaspecial
09/18/2024Energy Code Compliance InspectionsJEFFREY BELLprogress
09/18/2024FinalRICHARD MUESCH JR.progress
09/18/2024Air barrier - visual inspectionJEFFREY BELLenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/14/2026B01113829-I1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWProgress Inspector Seal & Signature3
08/23/2026B01113829-I1Open ↗
08/23/2026B01113829-I1Open ↗
08/23/2026B01113829-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01113829-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01113829-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01113829-I1Open ↗