ECB03/02/2026AT THE TIME OF MY INSPECTION OF ACTIVE 5 STORY NEW BUILDING I OBSERVED ONLY 2 FIRE EXTINGUISHERS ON SITE WITH ONE DIAL SHOWED EMPTY AND 2ND ONE TAG SHOWED SERVICE IN 2024 (AS PER TAG FIRE EXT. IS EXPIRED AFTER$625 due
ECB03/02/2026AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP#1/4 NOT MAINTAINED-MULTIPLE LOCATION ADDED PLYWOOD OVER OLD PLYWOOD NOT PAINTED HUNTER GREEN, MULTIPLE BROKEN PLYWOOD'S ,HOLES IN FENCE$1K due
ECB03/02/2026AT THE TIME OF MY INSPECTION OF 5 STORY NEW BUILDING I OBSERVED BIG AMOUNTS OF GARBAGE/MATERIAL/EQUIPMENT SCATTERED ALL OVER THE FLOORS ON ALL FLOORS AND ON THE EXTERIOR OF BUILDING(CRATING TRIPPING/FIRE HAZARD$1K due
ECB03/02/2026AT THE TIME OF MY INSPECTION OBSERVED SIDEWALK SHED INSTALLED AT EXP#1/4 -BIG AMOUNT OF GARBAGE/MATERIAL/EQUIPMENT , MORTAR/DIRT ALL OVER SHED ROOF , BRACES FROM POST TO POST INSTALLED 7' HIGH(SHALL BE 8'),LOOS$2K due
ECB07/08/2025AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FEET HEIGHT. SUPPORTED SCAFFOLD UNSAFE AT 3RD FLOOR LEVEL MISSING SAFETY COMPONENTS GUARDRAILS,$2K due
ECB07/08/2025AT TIME OF MY INSPECTION OBSERVED: SIDEWALK SHE INSTALLED AT EXPO# 1 VERTICAL COMPONENTS PLACED ON GREEN INFRASTRUCTURE, CONTRARY TO BC 3307.6.4.10, BC 3307.9, BC 3307.10, AC28-103.8, 15 RCNY 19-01CREATING A N$10K due
ECB07/08/2025BC 3303.4.8 MACHINERY. MECHANICAL EQUIPMENT AT STORAGE ZONE DOES NOT BARRICADE, SHIELDED TO PREVENT CONTACT BY PUBLIC. AT TIME OF INSPECTION OBSERVED: UNATTENDED TELEHANDLER AT EXPOSURE# 1 MISSING ENCLOSURE, CR$2K due
ECB07/08/2025AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FEET HEIGHT. MISSING NETTING BETWEEN FENCE AND SIDEWALK SHED AT EXPO# 1-4 CONTRARY TO BC 3307.2$2K due
ECB07/08/2025AT TIME OF INSPECTION OBSERVED: PROPOSED 5 STORY NEW BUILDING CMU WORK AT 3RD FL. LEVEL STEEL COLUMN ERECTED AT 50 FEET HEIGHT. INADEQUATE HOUSEKEEPING AT THROUGHOUT JOB SITE. CREATING UNSAFE CONDITION FOR PUBL$1K due
ECB03/19/1999FAILURE TO MAINTAIN. DEFECT IS: 1) INTERIOR FLOOR SLAB COLLAPSED THRU-OUT 1ST FL. 2) MASONRY WALL @ INTERIOR COLLAPSED OUT OF LEVEL APPROX. 6". REMEDY: VACATE PREMISES, MAKE SAFE, MAKE ALL NECESSARY REPAIRS.Nothing owed — awaiting certificate of correction
Zoned residential, not Manhattan · Owner of record: 434 BLAKE LLC · 3,000 sf lot · 0 FAR built · Flood zone X