← Back
Elevator cooperative
224 HIGHLAND BOULEVARD
BROOKLYN · BIN 3401466
💬 Discuss this project
1940Year Built
6Stories
D4Building Class
R4Zoning
104,465 sfGross Floor Area
88Units
LL97 CoveredRent Stabilized214 Open Violations 212 unresolved · 2 paperwork only ▸FDNY Report ↗
Elevator cooperative · Owner of record: J.K. MANAGEMENT · 42,700 sf lot · 2.45 FAR built · Flood zone X
Locations of Work
Architecture
Roof19p · 2 filings · 14 docs
Floor 112p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DIAMOND MANAGEMENT707/08/2026
MKA GENERAL CONSTRUCTION INC.707/05/2026
J K MANAGEMENT303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IKRA CONSULTING LLC102/09/2026
ROGER DE ELECTRIC CO.309/30/2025
ASR ENGINEERING PC109/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
SALAMON ENGINEERING PLLC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKA GENERAL CONSTR INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SALAMON ENGINEERING PLLC1264309/30/2025
Building Lifecycle
All (29)Filed (4)Permit Issued (4)Violation (11)Special Inspection (10)
06/26/2026
Violation issued (ECB, open)
Construction
06/12/2026
Special inspection requirement — Final
David Salamon
06/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Salamon
06/12/2026
Special inspection requirement — Masonry
David Salamon
06/12/2026
Special inspection requirement — Post-installed Anchors
06/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
06/12/2026
Special inspection requirement — Tenant Protection Plan Compliance
02/10/2026
Permit issued — Construction Fence
B01356727-I1-FN
02/09/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY FENCE AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01356727-I1
01/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/20/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2025
Permit issued — General Construction
B01135090-I1-GC
10/01/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
David Salamon
10/01/2025
Special inspection requirement — Masonry
David Salamon
10/01/2025
Special inspection requirement — Tenant Protection Plan Compliance
10/01/2025
Special inspection requirement — Final
David Salamon
09/30/2025
Filed — Alteration
Garage repair
B01135090-P1
09/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/18/2025
Violation issued (ECB, closed)
Unknown
09/11/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B01285496-I1
09/11/2025
Permit issued — Sidewalk Shed
B01285496-I1-SH
09/09/2025
Violation issued (ECB, open)
Construction
09/09/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/09/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2025
Permit issued — General Construction
B01135090-I1-GC
02/25/2025
Violation issued (ECB, open)
Construction
11/12/2024
Filed — Alteration
Garage repair
B01135090-I1
12/15/2022
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedMKA GENERAL CONSTR INC02/10/2026
DOB NOWGeneral ConstructionPermit IssuedMKA GENERAL CONSTR INC10/01/2025
DOB NOWSidewalk ShedPermit IssuedMKA GENERAL CONSTR INC09/11/2025
DOB NOWGeneral ConstructionPermit IssuedMKA GENERAL CONSTR INC04/25/2025
1 project · most recent 09/18/2025
FiledStatusContractorScope
09/18/2025Permit IssuedRICHARD NEU—
1 project · most recent 09/11/2025
Sidewalk Shed
FiledStatusContractorScope
09/11/2025Permit IssuedMKA GENERAL CONSTR INCSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/12/2026FinalDavid Salamonprogress
06/12/2026Fire-Resistant Penetrations and JointsDavid Salamonspecial
06/12/2026MasonryDavid Salamonspecial
06/12/2026Post-installed Anchors—special
06/12/2026Structural Stability – Alterations of existing buildings—special
06/12/2026Tenant Protection Plan Compliance—special
10/01/2025Fire-Resistant Penetrations and JointsDavid Salamonspecial
10/01/2025MasonryDavid Salamonspecial
10/01/2025Tenant Protection Plan Compliance—special
10/01/2025FinalDavid Salamonprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
09/03/2026B01416212-I1Request digital key ↗
08/20/2026B01285496-I1Request digital key ↗
08/20/2026B01135090-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature5
09/03/2026B01416212-I1Open ↗
08/20/2026B01135090-P1Open ↗
08/20/2026B01135090-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B01416212-I1Open ↗
08/29/2026B01416212-I1Open ↗
08/24/2026B01135090-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/29/2026B01416212-I1Open ↗
08/24/2026B01135090-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
09/03/2026B01416212-I1Open ↗
08/20/2026B01135090-P1Open ↗
08/20/2026B01135090-I1Open ↗