← Back
Factory, light manufacturing
1037 60 STREET
BROOKLYN · BIN 3411425
💬 Discuss this project
1996Year Built
1Stories
F5Building Class
M1-1Zoning
2,000 sfGross Floor Area
1Units
0 Open Violations
Factory, light manufacturing · Owner of record: 1037 60 ST LLC · 2,003 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Roof6p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
1 job · most recent 08/14/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/14/2026——Ventilation Systems
Ventilation
Broan AE50110DC 50 CFM · Exhaust Fan ×1
1 job · most recent 08/14/2026
Sprinkler System
FiledStatusContractorScope
08/14/2026——Sprinkler System
1 job · most recent 08/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
08/14/2026——Storm, Water/Sanitary
1 job · most recent 08/14/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/14/2026——Steel, Concrete, Masonry
Building Lifecycle
All (73)Filed (7)Violation (3)Objection (33)Special Inspection (30)
09/17/2026
Objection raised — Other
09/16/2026
Objection raised — Other
09/10/2026
Objection raised — Scope
09/10/2026
Objection raised — Zoning
09/10/2026
Objection raised — Structural
09/10/2026
Objection raised — Structural
09/10/2026
Objection raised — Structural
08/25/2026
Objection resolved — Resolved
08/19/2026
Objection raised — Other
08/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S1
08/14/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S7
08/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
08/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S2
08/04/2026
Objection resolved — Resolved
07/31/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S4
07/28/2026
Objection raised — Admin
07/11/2026
Objection resolved — Addressed
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S5
07/08/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
PROPOSED STRUCTURAL WORK IN CONJUCTION WITH DOB NOW JOB#B01396180; AS PER PLAN, NO CHANGE EGRESS, USE OR OCCUPANCY.
B01396180-S6
07/07/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/05/2026
Special inspection requirement — Concrete - Cast-In-Place
07/03/2026
Special inspection requirement — Final
07/03/2026
Special inspection requirement — Post-installed Anchors
07/03/2026
Special inspection requirement — Masonry
07/03/2026
Special inspection requirement — Concrete - Cast-In-Place
07/03/2026
Special inspection requirement — Footing and Foundation
07/03/2026
Special inspection requirement — Final
07/03/2026
Special inspection requirement — Structural Steel - Welding
07/03/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/03/2026
Special inspection requirement — Structural Steel - Details
06/29/2026
Objection resolved — Addressed
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Addressed
06/29/2026
Special inspection requirement — Maintenance information
06/29/2026
Special inspection requirement — Lighting controls
06/29/2026
Special inspection requirement — Air barrier continuity plan testing
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Resolved
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
05/29/2026
Objection raised — Zoning
05/29/2026
Objection raised — Structural
05/29/2026
Objection raised — Structural
05/29/2026
Objection raised — Zoning
05/29/2026
Objection raised — Scope
05/29/2026
Objection raised — Structural
05/29/2026
Objection raised — Zoning
05/29/2026
Objection raised — Cost
05/29/2026
Objection raised — Scope
05/27/2026
Objection raised — Scope
05/27/2026
Objection raised — Energy
05/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/03/2026
Special inspection requirement — Energy Code Compliance Inspections
05/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
05/03/2026
Special inspection requirement — Shutoff dampers
Latest 60 of 73 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HKP INC303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARC CONSULTING ENGINEERS708/14/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 44
DateRequirementInspectorRole
08/13/2026Fire-Resistant Penetrations and Joints—special
07/07/2026Structural Stability – Alterations of existing buildings—special
07/05/2026Structural Stability – Alterations of existing buildings—special
07/05/2026Concrete - Cast-In-Place—special
07/03/2026Final—progress
07/03/2026Post-installed Anchors—special
07/03/2026Masonry—special
07/03/2026Concrete - Cast-In-Place—special
07/03/2026Footing and Foundation—progress
07/03/2026Final—progress
07/03/2026Structural Steel - Welding—special
07/03/2026Structural Steel - High Strength Bolting—special
07/03/2026Structural Steel - Details—special
06/29/2026Maintenance information—energy_progress
06/29/2026Lighting controls—energy_progress
06/29/2026Air barrier continuity plan testing—energy_progress
06/04/2026Structural Stability – Alterations of existing buildings—special
05/03/2026HVAC-R and service water piping design and insulation—energy_progress
05/03/2026Energy Code Compliance Inspections—progress
05/03/2026HVAC-R and service water heating equipment—energy_progress
05/03/2026Shutoff dampers—energy_progress
05/03/2026HVAC-R and service water heating system controls—energy_progress
05/02/2026Final—progress
05/02/2026Mechanical Systems—special
05/02/2026Fire-Resistant Penetrations and Joints—special
Latest 25 of 44.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/03/2026B01396180-S4Request digital key ↗
08/17/2026B01396180-S4Request digital key ↗
08/17/2026B01396180-S5Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/14/2026B01396180-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/14/2026B01396180-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026B01396180-S6Open ↗
08/17/2026B01396180-S5Open ↗
08/17/2026B01396180-S4Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/14/2026B01396180-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01396180-S4Open ↗
08/17/2026B01396180-S2Open ↗
08/17/2026B01396180-S1Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026B01396180-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01396180-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/14/2026B01396180-I1Open ↗