← Back
Elevator apt, semi-fireproof without stores
Riverway Apartments
230 RIVERDALE AVENUE · BIN 3413856
💬 Discuss this project
2011Year Built
7Stories
D1Building Class
R6Zoning
96,671 sfGross Floor Area
115Units
LL97 CoveredRent Stabilized1 Open Violation ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: RIVERWAY APARTMENTS LLC · 22,000 sf lot · 4.39 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Cellar5p · 2 filings · 14 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BK CONSTRUCTIONDBA SRT CONSTRUCTION807/08/2026
HORRIGAN DEVELOPMENT1303/22/2026
SKA MARIN303/22/2026
RIVERWAY APARTMENTS LLC303/22/2026
SHY ANNE CASUALS INC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP411/17/2025
SUPERSTRUCTURES ENG. + ARCH.109/23/2025
ROBERT ETTINGER, P.E, P.C.405/16/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
SUPERSTRUCTURES ENG + ARCH103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BK CONSTRUCTION SVCS INCGeneral Contractor607/08/2026
MILLER PLBG & HTG INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
360 ENGINEERING P.C.7496109/23/2025
BIG APPLE GROUP NY A RMA9168201/18/2022
Building Lifecycle
All (69)Filed (9)Permit Issued (6)Signed Off (4)Facade (FISP) (6)Violation (31)Inspection (3)Special Inspection (10)
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-I1
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S1
05/19/2026
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S2
11/18/2025
Permit issued — Supported Scaffold
B01278002-S2-SF
11/17/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S2
11/05/2025
Permit issued — Construction Fence
B01278002-S1-FN
11/04/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-S1
10/17/2025
Permit issued — General Construction
B01287337-I1-GC
10/09/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-P1
09/23/2025
Filed — Alteration
B01287337-I1
09/19/2025
Permit issued — Sidewalk Shed
B01278002-I1-SH
09/18/2025
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION
B01278002-I1
07/14/2024
Violation issued (HPD, closed)
C
07/14/2024
Violation issued (HPD, closed)
B
02/22/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/31/2023
Violation issued (HPD, closed)
A
01/10/2023
Cycle 9 facade report signed — SWARMP
01/06/2023
Cycle 9 facade inspection completed
12/05/2022
Cycle 9 facade report submitted
11/07/2022
Violation issued (HPD, closed)
I
10/17/2022
Violation issued (HPD, closed)
C
10/17/2022
Violation issued (HPD, closed)
B
10/17/2022
Violation issued (HPD, closed)
B
05/20/2022
Signed off — Alteration
APPLICATION FILED TO REPLACE EXISTING BOILER AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00580003-I1
05/19/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/16/2022
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH BOILER REPLACEMENT APPLICATION
B00581206-P1
01/24/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
01/19/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/19/2022
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
01/19/2022
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
01/19/2022
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
01/19/2022
Special inspection requirement — Maintenance information
Soorjbally Harilall
01/18/2022
Filed — Alteration
APPLICATION FILED TO REPLACE EXISTING BOILER AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00580003-P1
01/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
01/14/2022
Special inspection requirement — Heating Systems
SOORJBALLY HARILALL
01/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Soorjbally Harilall
01/14/2022
Special inspection requirement — Maintenance information
Soorjbally Harilall
01/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Soorjbally Harilall
01/04/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/30/2021
Permit issued — Boiler Equipment
B00580003-I1-BE
12/28/2021
Permit issued — Plumbing
B00581206-I1-PL
08/25/2021
Filed — Alteration
APPLICATION FILED TO REPLACE EXISTING BOILER AT CELLAR. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B00580003-I1
08/25/2021
Filed — Alteration
PLUMBING WORK FILED IN CONJUNCTION WITH BOILER REPLACEMENT APPLICATION
B00581206-I1
04/20/2021
Violation issued (HPD, closed)
A
01/28/2021
Violation issued (HPD, closed)
A
03/06/2020
Violation issued (HPD, closed)
B
03/06/2020
Violation issued (HPD, closed)
C
11/06/2019
Violation issued (HPD, closed)
I
06/01/2019
Cycle 8 facade report signed — SAFE
04/04/2019
Cycle 8 facade report submitted
03/26/2019
Cycle 8 facade inspection completed
03/09/2018
Violation issued (HPD, closed)
B
03/09/2018
Violation issued (HPD, closed)
A
02/10/2018
Violation issued (FDNY_NOV, closed)
12/11/2017
Violation issued (HPD, closed)
I
11/29/2017
Violation issued (HPD, closed)
B
11/29/2017
Violation issued (HPD, closed)
B
11/29/2017
Violation issued (HPD, closed)
B
05/30/2017
Violation issued (HPD, closed)
A
05/30/2017
Violation issued (HPD, closed)
A
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldSigned-offBK CONSTRUCTION SVCS INC11/18/2025
DOB NOWConstruction FenceSigned-offBK CONSTRUCTION SVCS INC11/05/2025
DOB NOWGeneral ConstructionSigned-offBK CONSTRUCTION SVCS INC10/17/2025
DOB NOWSidewalk ShedSigned-offBK CONSTRUCTION SVCS INC09/19/2025
DOB NOWBoiler EquipmentSigned-offMILLER PLBG & HTG INC12/30/2021
DOB NOWPlumbingSigned-offMILLER PLBG & HTG INC12/28/2021
1 project · most recent 05/16/2022
Gas
FiledStatusContractorScope
05/16/2022Signed-offMILLER PLBG & HTG INCGas
3 projects · most recent 10/09/2025
FiledStatusContractorScope
10/09/2025Permit IssuedHIGH QUALITY ELEC.OF NYC—
07/27/2025CompleteTESLA ELECTRIC CORP—
04/05/2021Permit IssuedABILENE ELECTRIC INC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/19/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/24/2022Pass-Final Boiler Equipment InspectionPassView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/19/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/19/2022Heating SystemsSOORJBALLY HARILALLspecial
01/19/2022HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
01/19/2022HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
01/19/2022Maintenance informationSoorjbally Harilallenergy_progress
01/14/2022Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
01/14/2022Heating SystemsSOORJBALLY HARILALLspecial
01/14/2022HVAC-R and service water heating equipmentSoorjbally Harilallenergy_progress
01/14/2022Maintenance informationSoorjbally Harilallenergy_progress
01/14/2022HVAC-R and service water heating system controlsSoorjbally Harilallenergy_progress
▾Documents — 25 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00580003-I1Request digital key ↗
09/01/2026B00580003-P1Request digital key ↗
09/01/2026B00581206-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/01/2026B00580003-P1Open ↗
09/01/2026B00580003-I1Open ↗
09/01/2026B00581206-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/28/2026B00580003-P1Open ↗
08/25/2026B00580003-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/28/2026B00580003-P1Open ↗
08/25/2026B00580003-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00580003-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00580003-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/20/2026B01287337-I1Open ↗