← Back
Two stories - detached, small or mid-size
7 NOEL AVENUE
BROOKLYN · BIN 3423892
💬 Discuss this project
2016Year Built
1.75Stories
A1Building Class
R4-1Zoning
2,557 sfGross Floor Area
1Units
6 Open Violations 5 unresolved · 1 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: GERRITSEN BEACH DEVELOPMENT LLC · 1,800 sf lot · 1.42 FAR built
Locations of Work
ArchitectureFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 20 docs
CellarUnder Construction2p · 1 filing · 20 docs
1 job · most recent 02/18/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/18/2026Permit IssuedSAVION CONSTRUCTION INCHeating and Air Conditioning Systems
Heat / Cool
Fujitsu A0U18RLXFZ 22,000 BTU · Condensing Unit ×1
1 job · most recent 02/18/2026
FiledStatusContractorScope
02/18/2026——14 heads
1 job · most recent 02/18/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/18/2026——Storm, Water/Sanitary
1 job · most recent 02/18/2026
Masonry Wood
FiledStatusContractorScope
02/18/2026Permit IssuedSAVION CONSTRUCTION INCMasonry, Wood
1 job · most recent 02/18/2026
Fence
FiledStatusContractorScope
02/18/2026Permit IssuedSAVION CONSTRUCTION INCFence
Building Lifecycle
All (114)Filed (7)Permit Issued (2)Violation (10)Objection (65)Special Inspection (30)
05/05/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/30/2026
Permit issued — Construction Fence
B01186282-S1-FN
03/12/2026
Objection raised — Scope
03/12/2026
Objection raised — Mechanical
03/12/2026
Objection raised — Structural
03/12/2026
Objection raised — Structural
03/12/2026
Objection raised — Structural
03/12/2026
Objection raised — Structural
03/12/2026
Objection raised — Structural
03/12/2026
Objection raised — Admin
03/12/2026
Objection raised — Inspections
03/12/2026
Objection raised — Structural
02/18/2026
Filed — New Building
PROPOSED NEW THREE STORY RESIDENTIAL DWELLING
B01186282-S5
01/28/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
01/21/2026
Objection resolved — Addressed
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Scope
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Scope
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Scope
12/23/2025
Objection raised — Scope
12/23/2025
Objection raised — Scope
12/23/2025
Objection raised — Zoning
12/23/2025
Objection raised — Zoning
12/22/2025
Objection resolved — Addressed
12/11/2025
Violation issued (ECB, closed)
Construction
10/30/2025
Objection resolved — Addressed
06/23/2025
Objection resolved — Addressed
06/23/2025
Objection resolved — Addressed
06/23/2025
Objection resolved — Addressed
06/12/2025
Objection resolved — Resolved
06/12/2025
Objection resolved — Resolved
06/11/2025
Objection resolved — Addressed
06/10/2025
Objection raised — Scope
06/10/2025
Objection raised — Scope
06/10/2025
Objection raised — Scope
06/10/2025
Objection resolved — Addressed
06/10/2025
Objection resolved — Addressed
06/06/2025
Objection raised — Energy
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Inspections
06/06/2025
Objection raised — Fire_Protection
05/27/2025
Filed — New Building
PROPOSED NEW THREE STORY RESIDENTIAL DWELLING
B01186282-S4
05/27/2025
Filed — New Building
PROPOSED NEW THREE STORY RESIDENTIAL DWELLING
B01186282-S3
05/23/2025
Objection raised — Scope
05/19/2025
Objection resolved — Addressed
05/19/2025
Objection resolved — Addressed
05/19/2025
Special inspection requirement — Interior lighting power
05/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
05/15/2025
Objection resolved — Addressed
Latest 60 of 114 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAVION CONSTRUCTION1704/09/2026
GERRITSEN BEACH DEVELOPME103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BRICOLAGE DESIGNS602/18/2026
BGM ENGINEERING110/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
4444 PPPP CORP103/21/2026
BRICOLAGE DESIGNS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SAVION CONSTRUCTION INCGeneral Contractor204/09/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedSAVION CONSTRUCTION INC03/30/2026
DOB NOWFull DemolitionPermit IssuedSAVION CONSTRUCTION INC12/04/2024
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
05/19/2025Interior lighting power—energy_progress
05/19/2025Electric vehicle service equipment requirements—energy_progress
02/27/2025HVAC-R and service water piping design and insulation—energy_progress
02/27/2025HVAC-R and service water heating system controls—energy_progress
02/27/2025HVAC-R and service water heating equipment—energy_progress
02/27/2025Metering—energy_progress
02/27/2025Maintenance information—energy_progress
02/27/2025Permanent certificate—energy_progress
02/27/2025Fire-Resistant Penetrations and Joints—special
02/25/2025Fire-Resistance Rated Construction—progress
02/25/2025Final—progress
02/25/2025Lowest Floor Elevation—progress
02/25/2025Footing and Foundation—progress
02/25/2025Maintenance information—energy_progress
02/25/2025Fenestration air leakage—energy_progress
02/25/2025Air barrier — testing —energy_progress
02/25/2025Fenestration and door U-factor and product ratings—energy_progress
02/25/2025Metering—energy_progress
02/25/2025Insulation placement and R values—energy_progress
02/25/2025Air barrier - visual inspection—energy_progress
02/25/2025Permanent certificate—energy_progress
02/25/2025Fenestration areas—energy_progress
02/25/2025Exterior Insulation and Finish Systems (EIFS)—special
02/25/2025Structural Steel - Details—special
02/25/2025Masonry—special
Latest 25 of 31.
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/15/2026B01119315-I1Request digital key ↗
08/15/2026B01186282-S5Request digital key ↗
08/15/2026B01186282-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01186282-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01186282-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01186282-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026B01186282-S1Open ↗
08/21/2026B01186282-I1Open ↗
08/21/2026B01186282-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01119315-I1Open ↗
▸Trade Schedules & Equipment3
▸DOB NOWElectric Cut-Off1
08/13/2026B01119315-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01119315-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01186282-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/14/2026B01186282-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWRodent Control1
08/13/2026B01119315-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026B01186282-I1Open ↗
▸Other Documents6
▸DOB NOWProperty Ownership Certification2
08/14/2026B01186282-I1Open ↗
08/13/2026B01119315-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01186282-I1Open ↗
▸DOB NOWGeotechnical Peer Review Report (BC 1818)1
08/13/2026B01186282-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01119315-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01186282-I1Open ↗