← Back
Elevator apt, fireproof without stores
Howard (NYCHA)
1596 EAST NEW YORK AVENUE · BIN 3424539
💬 Discuss this project
1954Year Built
7Stories
D3Building Class
R6Zoning
771,366 sfGross Floor Area
815Units
LL97 Covered10 Open Violations 4 unresolved · 6 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 658,440 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Roof3p · 1 filing · 12 docs
Bulkhead4p · 1 filing · 12 docs
Cellar2p · 2 filings · 20 docs
3 jobs · most recent 10/29/2021
General Wiring
FiledStatusContractorScope
10/29/2021CompleteCSI SEC & ELECTRIC INCGeneral Wiring
12/27/2018CompleteJEMCO ELECT. CONTRS INCGeneral Wiring
05/22/2018CancelledJEMCO ELECT. CONTRS INCGeneral Wiring
1 job · most recent 03/03/2026
Concrete Masonry
FiledStatusContractorScope
03/03/2026——Concrete, Masonry
1 job · most recent 09/16/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
09/16/2025——Suspended Scaffold (SC)
Building Lifecycle
All (61)Filed (8)Permit Issued (3)Signed Off (3)Violation (20)Inspection (2)Objection (8)Special Inspection (17)
03/25/2026
Violation issued (ECB, open)
Construction
03/24/2026
Special inspection requirement — Post-installed Anchors
Maxim Korngold
03/24/2026
Special inspection requirement — Final
Maxim Korngold
03/24/2026
Special inspection requirement — Masonry
Maxim Korngold
03/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Maxim Korngold
03/24/2026
Special inspection requirement — Tenant Protection Plan Compliance
Maxim Korngold
03/24/2026
Special inspection requirement — Concrete - Cast-In-Place
Maxim Korngold
03/03/2026
Filed — Alteration
The scope of work includes but is not limited to replacing existing metal stairs outside the mechanical room, and concrete and brick repair.
B01088999-P1
01/30/2026
Special inspection requirement — Tenant Protection Plan Compliance
01/30/2026
Special inspection requirement — Concrete - Cast-In-Place
01/30/2026
Special inspection requirement — Masonry
01/30/2026
Special inspection requirement — Post-installed Anchors
01/30/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/30/2026
Special inspection requirement — Final
09/16/2025
Filed — Alteration
INSTALLATION OF SUSPENDED SCAFFOLD AND MATERIAL HOIST FOR EXTERIOR FACADE REPAIRS. SUSPENDED SCAFFOLD AND MATERIAL HOIST SHALL COMPLY WITH CHAPTER 33 OF THE 2022 NYC BUILDING CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01287970-I1
09/16/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Md Istiaque Hasan
09/16/2025
Special inspection requirement — Post-installed Anchors
Md Istiaque Hasan
08/02/2024
Filed — Alteration
The scope of work includes but is not limited to replacing existing metal stairs outside the mechanical room, and concrete and brick repair.
B01088999-I1
02/14/2024
Violation issued (FDNY_NOV, closed)
03/14/2022
Signed off — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. Proposed manholes will convey water into the underground storage systems.
B00233886-I1
03/14/2022
Signed off — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. General construction work to be done as per plans filed.
B00523102-I1
02/22/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00621280-I1
02/22/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
02/18/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/21/2021
Permit issued — General Construction
B00523102-I1-GC
11/18/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. General construction work to be done as per plans filed.
B00523102-P1
11/04/2021
Permit issued — Construction Fence
B00621280-I1-FN
11/03/2021
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00621280-I1
10/28/2021
Special inspection requirement — Final
Michael Lombardo
10/14/2021
Permit issued — Plumbing
B00233886-I1-PL
08/05/2021
Objection raised — Other
08/05/2021
Objection resolved — Addressed
08/04/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
KATHLEEN HAND
08/03/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. General construction work to be done as per plans filed.
B00523102-I1
08/03/2021
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. Proposed manholes will convey water into the underground storage systems.
B00233886-P1
07/28/2021
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
NELSON LOPEZ
06/29/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/24/2020
Violation issued (ECB, closed)
Construction
03/24/2020
Violation issued (ECB, open)
Construction
10/25/2019
Objection raised — Scope
10/25/2019
Objection resolved — Addressed
10/25/2019
Objection raised — Scope
10/25/2019
Objection resolved — Addressed
10/25/2019
Objection raised — Inspections
10/25/2019
Objection resolved — Addressed
10/22/2019
Filed — Alteration
The proposed work will manage stormwater runoff on the property through the use of two separate underground storage systems located in the parking lot. Proposed manholes will convey water into the underground storage systems.
B00233886-I1
06/29/2018
Violation issued (ECB, open)
Construction
05/31/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/23/2009
Violation issued (ECB, closed)
Local Law
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/16/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/01/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 61 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYCHA1007/08/2026
TRIUMPH CONSTRUCTION407/08/2026
NYC HA 9 9103/22/2026
NYC HOUSING AUTHORITY703/22/2026
NEW YORK CITY HOUSING AUTHORITY103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NYCHA203/03/2026
THE RBA GROUP411/18/2021
LOMBARDO PROFESSIONAL ENGINEERING111/03/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOMBARDO BUILDING CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRIUMPH CONSTRUCTION CORPGeneral Contractor207/08/2026
CARBONE JOHNElectrical103/21/2026
DENNIS KARAGOUNISElectrical103/21/2026
HALPERN, SElectrical103/21/2026
JOHN CARBONEElectrical103/21/2026
KARAGOUNIS DENNISElectrical103/21/2026
ALVARADO, JUANElectrical103/21/2026
OLYMPIC PLBG & HTG SVC INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
RI CONSULTING SERVICES IN8904109/16/2025
TWIN PEAKS INC.317108/02/2024
UNIVERSAL TESTING AND INS400411/18/2021
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offTRIUMPH CONSTRUCTION CORP12/21/2021
DOB NOWConstruction FenceSigned-offTRIUMPH CONSTRUCTION CORP11/04/2021
DOB NOWPlumbingSigned-offOLYMPIC PLBG & HTG SVC IN10/14/2021
BISPLISSUEDRICHARDS P AND H CO., INC04/12/2011
BISEQISSUEDHI-TECH BRIDGING INC12/15/2000
BISPLISSUEDMASTER PLB AND HTG INC05/20/1997
BISOTISSUEDJIM'S GENERAL CONTRACTING INC05/09/1997
BISPLISSUEDTRATAROS PLUMBING INC.09/06/1995
BISPLISSUEDWARD MECHANICAL08/13/1991
BISBLRE-ISSUEDCENTRAL MECHANICAL SYSTEMS07/23/1991
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/22/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
02/18/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
03/24/2026Post-installed AnchorsMaxim Korngoldspecial
03/24/2026FinalMaxim Korngoldprogress
03/24/2026MasonryMaxim Korngoldspecial
03/24/2026Structural Stability – Alterations of existing buildingsMaxim Korngoldspecial
03/24/2026Tenant Protection Plan ComplianceMaxim Korngoldspecial
03/24/2026Concrete - Cast-In-PlaceMaxim Korngoldspecial
01/30/2026Tenant Protection Plan Compliance—special
01/30/2026Concrete - Cast-In-Place—special
01/30/2026Masonry—special
01/30/2026Post-installed Anchors—special
01/30/2026Structural Stability – Alterations of existing buildings—special
01/30/2026Final—progress
09/16/2025Alternative Materials - OTCR Buildings Bulletin NumberMd Istiaque Hasanspecial
09/16/2025Post-installed AnchorsMd Istiaque Hasanspecial
10/28/2021FinalMichael Lombardoprogress
08/04/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationKATHLEEN HANDspecial
07/28/2021Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationNELSON LOPEZspecial
▾Documents — 67 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch6
09/01/2026B00523102-P1Request digital key ↗
08/31/2026B00621280-I1Request digital key ↗
08/24/2026B01088999-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/01/2026B00233886-I1Request digital key ↗
08/15/2026B00233886-P1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
03/31/2011320281299Open ↗
▸Seals & Professional Certifications22
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B01088999-I1Open ↗
09/01/2026B01088999-I1Open ↗
09/01/2026B01088999-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026B01088999-I1Open ↗
08/24/2026B01088999-P1Open ↗
08/13/2026B00523102-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
07/03/2012320281299Open ↗
03/31/2011320281299Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026B01088999-I1Open ↗
08/23/2026B00621280-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
03/31/2011320281299Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
03/31/2011320281299Open ↗
▸Trade Schedules & Equipment4
▸BISSELF-CERT PLUMBING NOTICE3
06/21/2012320281299Open ↗
06/09/2012320281299Open ↗
12/10/2011320281299Open ↗
▸BISSCHEDULE B - PLUMBING1
03/31/2011320281299Open ↗
▸Environmental & Asbestos3
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
04/14/2011320281299Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP 20-21-5)1
04/14/2011320281299Open ↗
▸BISASBESTOS INSPECTION REPORT1
03/31/2011320281299Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY1
03/31/2011320281299Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
08/02/2012320281299Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
08/02/2012320281299Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/13/2026B00233886-P1Open ↗
08/13/2026B00233886-I1Open ↗
▸Approvals, Objections & Sign-offs17
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
08/24/2026B01088999-I1Open ↗
08/24/2026B01088999-P1Open ↗
08/13/2026B00233886-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)4
08/13/2026B00233886-I1Open ↗
08/13/2026B00523102-I1Open ↗
08/13/2026B00523102-P1Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
08/02/2012320281299Open ↗
07/03/2012320281299Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)2
08/13/2026B00523102-I1Open ↗
08/13/2026B00233886-I1Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
03/31/2011320281299Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/03/2012320281299Open ↗
03/31/2011320281299Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
04/14/2011320281299Open ↗
04/14/2011320281299Open ↗
▸BISEFILING COVER SHEET1
03/31/2011320281299Open ↗
▸Other Documents2
▸DOB NOWManufacturer's Specifications1
08/13/2026B01287970-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01287970-I1Open ↗