← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
108 NEPTUNE AVENUE
BROOKLYN · BIN 3428668
💬 Discuss this project
2009Year Built
7Stories
RMBuilding Class
R6Zoning
62,468 sfGross Floor Area
83Units
LL97 CoveredRent Stabilized16 Open Violations ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 18,720 sf lot · 3.34 FAR built · Flood zone AE
Locations of Work
Structural
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KINGS GROUP NY707/08/2026
AMS CONTRACTOR407/08/2026
NEPTUNE AVENUE HOLDINGS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AGILE DESIGN ENGINEERING PC312/02/2025
PVE ENGINEERING109/18/2024
AG ENGINEERING PLLC101/18/2024
SERDAR CEYLAN ARCHITECT, PC206/12/2023
SYED ENGINEERING, P.C.112/18/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES103/21/2026
LC EXPEDITING SERVICES603/21/2026
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
NORTHEAST EXPEDITING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MKNK WASTE REMOVAL INCGeneral Contractor407/08/2026
KINGS GROUP NY CORPGeneral Contractor307/08/2026
SAHARA CONTRACTING CORPGeneral Contractor307/08/2026
AMS CONTRACTOR INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEXUS INSPECTIONS AND TES9686312/02/2025
PARTRIDGE VENTURE ENGINEE7690109/18/2024
ARCHITECTURAL CONCEPT3642206/12/2023
Building Lifecycle
All (141)Filed (8)Permit Issued (9)Signed Off (5)Facade (FISP) (9)Violation (60)Objection (20)Special Inspection (30)
04/01/2026
Violation issued (FDNY_NOV, closed)
01/22/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00989510-I1
01/14/2026
Signed off — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105905-I1
01/07/2026
Permit issued — Sidewalk Shed
B00989510-I1-SH
12/09/2025
Cycle 9 facade report submitted
12/09/2025
Cycle 9 facade report signed — SWARMP
12/04/2025
Special inspection requirement — Tenant Protection Plan Compliance
Junda Qiu
12/04/2025
Special inspection requirement — Structural Steel - Welding
Junda Qiu
12/04/2025
Special inspection requirement — Structural Steel - Details
Junda Qiu
12/04/2025
Special inspection requirement — Post-installed Anchors
Junda Qiu
12/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Junda Qiu
12/04/2025
Special inspection requirement — Final
Junda Qiu
12/03/2025
Objection raised — Structural
12/03/2025
Objection resolved — Addressed
12/02/2025
Filed — Alteration
concrete columns repair and celling concrete slab repair at 1st floor . no change in use or occupancy
B01186147-P2
12/02/2025
Special inspection requirement — Tenant Protection Plan Compliance
Junda Qiu
11/24/2025
Special inspection requirement — Post-installed Anchors
Junda Qiu
11/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Junda Qiu
11/24/2025
Special inspection requirement — Structural Steel - Welding
Junda Qiu
11/24/2025
Special inspection requirement — Final
Junda Qiu
11/24/2025
Special inspection requirement — Structural Steel - Details
Junda Qiu
11/20/2025
Cycle 9 facade inspection completed
11/20/2025
Violation issued (HPD, closed)
I
10/14/2025
Permit issued — General Construction
B01105905-I1-GC
09/23/2025
Permit issued — Structural
B01186147-I1-ST
09/15/2025
Filed — Alteration
concrete columns repair and celling concrete slab repair at 1st floor . no change in use or occupancy
B01186147-P1
09/10/2025
Special inspection requirement — Tenant Protection Plan Compliance
Junda Qiu
09/10/2025
Special inspection requirement — Structural Steel - Details
Junda Qiu
09/10/2025
Special inspection requirement — Structural Steel - Welding
Junda Qiu
09/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Junda Qiu
09/08/2025
Special inspection requirement — Post-installed Anchors
Junda Qiu
09/08/2025
Special inspection requirement — Final
Junda Qiu
06/13/2025
Violation issued (HPD, closed)
A
03/18/2025
Filed — Alteration
concrete columns repair and celling concrete slab repair at 1st floor . no change in use or occupancy
B01186147-I1
02/06/2025
Cycle 9 facade report signed — UNSAFE
01/28/2025
Cycle 9 facade inspection completed
01/13/2025
Permit issued — Sidewalk Shed
B00989510-I1-SH
11/29/2024
Cycle 9 facade report submitted
09/25/2024
Permit issued — General Construction
B01105905-I1-GC
09/18/2024
Filed — Alteration
PROPOSED EXTERIOR FACADE RESTORATION AS PER PLAN HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01105905-I1
09/04/2024
Special inspection requirement — Masonry
ALAN DUDLEY
09/04/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALAN DUDLEY
09/04/2024
Special inspection requirement — Final
ALAN DUDLEY
09/04/2024
Special inspection requirement — Energy Code Compliance Inspections
ALAN DUDLEY
09/04/2024
Special inspection requirement — Air barrier - visual inspection
ALAN DUDLEY
07/12/2024
Violation issued (ECB, closed)
Construction
04/17/2024
Violation issued (HPD, closed)
A
02/07/2024
Cycle 9 facade report submitted
02/07/2024
Cycle 9 facade report signed — UNSAFE
02/07/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2024
Cycle 9 facade inspection completed
01/19/2024
Permit issued — Sidewalk Shed
B00989510-I1-SH
01/18/2024
Filed — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCC.
B00989510-I1
08/21/2023
Signed off — Alteration
MINOR INTERIOR RENOVATION AND EXTENDING THE UPPER LEVEL OF EXISTING DUPLEX APARTMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B08037462-I1
08/21/2023
Signed off — Alteration
STRUCTURAL WORK TYPE IS FILED IN CONJUCTION WITH CONSTRUCTION JOB #B08037462-I1 AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00884297-I1
08/07/2023
Permit issued — Structural
B00884297-I1-ST
08/03/2023
Permit issued — General Construction
B08037462-I1-GC
06/15/2023
Objection raised — Scope
06/15/2023
Objection resolved — Addressed
06/15/2023
Objection raised — Structural
Latest 60 of 141 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/07/2026
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP10/14/2025
DOB NOWStructuralSigned-offSAHARA CONTRACTING CORP09/23/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/13/2025
DOB NOWGeneral ConstructionSigned-offSAHARA CONTRACTING CORP09/25/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP01/19/2024
DOB NOWStructuralSigned-offMKNK WASTE REMOVAL INC08/07/2023
DOB NOWGeneral ConstructionSigned-offMKNK WASTE REMOVAL INC08/03/2023
DOB NOWSidewalk ShedSigned-offAMS CONTRACTOR INC12/19/2019
BIS—ISSUEDRUBIN DEVEL AND CONST INC12/22/2014
BIS—ISSUEDRUBIN DEVEL AND CONST INC09/24/2014
BIS—ISSUEDRUBIN DEVEL AND CONST INC05/05/2014
BISEQISSUEDRUBIN DEVEL AND CONST INC05/05/2014
BISEQISSUEDBTA BUILDING & DEVELOP IN12/06/2013
BIS—ISSUEDBTA BUILDING & DEVELOP IN12/06/2013
BIS—ISSUEDBTA BUILDING & DEVELOP IN12/14/2012
BISEQISSUEDBTA BUILDING & DEVELOP IN12/14/2012
BIS—ISSUEDBTA BUILDING & DEVELOP IN12/09/2011
BISEQISSUEDBTA BUILDING & DEVELOP IN12/09/2011
BIS—ISSUEDBTA BUILDING & DEVELOP*11/22/2010
BIS—ISSUEDBTA BUILDING & DEVELOP11/25/2009
BISEQISSUEDBTA BUILDING & DEVELOP11/25/2009
BISEQISSUEDBTA BUILDING & DEVELOP12/11/2008
BIS—ISSUEDBTA BUILDING & DEVELOP12/11/2008
BIS—ISSUEDBTA BUILDING & DEVELOP INC06/11/2007
BISEQISSUEDBTA BUILDING & DEVELOP INC11/28/2006
BIS—ISSUEDBTA BUILDING & DEVELOP INC11/28/2006
6 projects · most recent 01/23/2024
General Wiring
FiledStatusContractorScope
01/23/2024CompleteHIGH QUALITY ELECTRIC OF—
12/20/2023CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
09/26/2022Permit IssuedDAVEN ELECTRIC CORPGeneral Wiring
08/30/2022CompleteGALLANT ELEC'L CONST, INCGeneral Wiring
04/23/2021CompleteLENS ELECTRIC, INCGeneral Wiring
12/24/2019Permit IssuedRICHARD NEU—
1 project · most recent 12/02/2025
Steel
FiledStatusContractorScope
12/02/2025Signed-offSAHARA CONTRACTING CORPSteel
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
12/04/2025Tenant Protection Plan ComplianceJunda Qiuspecial
12/04/2025Structural Steel - WeldingJunda Qiuspecial
12/04/2025Structural Steel - DetailsJunda Qiuspecial
12/04/2025Post-installed AnchorsJunda Qiuspecial
12/04/2025Structural Stability – Alterations of existing buildingsJunda Qiuspecial
12/04/2025FinalJunda Qiuprogress
12/02/2025Tenant Protection Plan ComplianceJunda Qiuspecial
11/24/2025Post-installed AnchorsJunda Qiuspecial
11/24/2025Structural Stability – Alterations of existing buildingsJunda Qiuspecial
11/24/2025Structural Steel - WeldingJunda Qiuspecial
11/24/2025FinalJunda Qiuprogress
11/24/2025Structural Steel - DetailsJunda Qiuspecial
09/10/2025Tenant Protection Plan ComplianceJunda Qiuspecial
09/10/2025Structural Steel - DetailsJunda Qiuspecial
09/10/2025Structural Steel - WeldingJunda Qiuspecial
09/08/2025Structural Stability – Alterations of existing buildingsJunda Qiuspecial
09/08/2025Post-installed AnchorsJunda Qiuspecial
09/08/2025FinalJunda Qiuprogress
09/04/2024MasonryALAN DUDLEYspecial
09/04/2024Tenant Protection Plan ComplianceALAN DUDLEYspecial
09/04/2024FinalALAN DUDLEYprogress
09/04/2024Energy Code Compliance InspectionsALAN DUDLEYprogress
09/04/2024Air barrier - visual inspectionALAN DUDLEYenergy_progress
06/09/2023Structural Steel - DetailsMUZAFFAR JAMALspecial
06/09/2023Structural Cold-Formed SteelMUZAFFAR JAMALspecial
Latest 25 of 31.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch7
08/26/2026B00989510-I1Request digital key ↗
08/24/2026B01105905-I1Request digital key ↗
08/20/2026B01186147-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/02/2026B00281766-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/19/2016302188692Open ↗
▸Seals & Professional Certifications39
▸DOB NOWSpecial Inspector Seal & Signature20
09/01/2026B01186147-P1Open ↗
09/01/2026B01186147-P1Open ↗
09/01/2026B01186147-P1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/01/2026B01186147-P1Open ↗
08/31/2026B01186147-I1Open ↗
08/30/2026B08037462-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00884297-I1Open ↗
08/26/2026B00989510-I1Open ↗
08/20/2026B01186147-I1Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/24/2015302188692Open ↗
08/24/2015302188692Open ↗
▸Safety & Tenant Protection1
▸DOB NOWTenant Protection Plan1
08/13/2026B00281766-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
01/19/2016302188692Open ↗
12/23/2015302188692Open ↗
▸Filing & Intake Forms2
▸BISADDITIONAL INFORMATION2
12/23/2015302188692Open ↗
06/30/2015302188692Open ↗
▸Other Documents2
▸BISSITE CONNECTION:DEP2
05/11/2016302188692Open ↗
04/06/2016302188692Open ↗