ECB02/26/2026OBS WORKERS WORKING ON NON-CONFORMING SCAFFOLD @EXPO 2 WORKING DIRECTLY ABOVE WORKERS WERE PERFORMING DEMOLITION OPS@4917 4 AVE,W/OUT ANY SAFETY PROTOCOLS TO MONITOR MULTIPLE OPERATIONS ADJ TO EACH SITE.SSPLAN$5K due
ECB02/26/2026OBSERVED FIRST FLOOR WITH COMBUSTIBLE & CONSTRUCTION MATERIALS & DEBRIS SCATTERED@MULTIPLE LOCATIONS WITH SNOW &ICE NOT CONTAINED OR STORED ON DESIGNATED CONTAINERS TO BE REMOVED, SAME CONDITION OBSERVED @MULTI$2K due
ECB02/26/2026OBSERVED WORKERS WORKING ON THE PIPE SCAFFOLD AT EXPOSURE 2 DIRECTLY ABOVE DEMOLITION OPERATIONS LOCATED AT 4917 4 AVE. UPON REQUEST FOR THE WORKERS' TRAINING CARDS, NONE WERE PROVIDED SINCE THE WORKERS AND SUP$2K due
ECB02/26/2026OBSERVED A 9-STORY BUILDING, W/ NEEDLE BEAMS INSTALLED CONTRARY TO PLANS ON FLOORS 3/5 &7, MULTIPLE MAKESHIFT STEEL ANGLES & CONNECTIONS, NONCONFORMING SPAN/LENGTH DIMENSIONS. INSTALLATION DEVIATED FROM PE DESI$2K due
ECB02/26/2026UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. 9-STORY BUILDING UNDER A PARTIAL STOP WORK ORDER ISSUED ON 01/12/2026 REFERENCE COMPLIANT 3A39928 BY THE BOROUGH COMMISSIONER FOR PERMIT B00750328$10K due
ECB11/17/2025AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED LARGE AMOUNT CONSTRUCTION DEBRIS, GARBAGE AND COMBUSTIBLE MATERIALS AT VARIOUS LOCATIONS APPROXIMATELY 7 FEET IN HEIGHT, FAILURE TO PROVIDE AND$12K due
ECB11/17/2025AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED NEEDLE BEAMS AT EXPOSURE #2 AND3 AT THE 4 AND 5 FLOOR, UPON REVIEW OF THE SITE SAFETY PLAN LOCATION OF NEEDLE BEAMS WAS NOT ON IT. FAILURE TO C$12K due
ECB11/17/2025AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED ON THE 2ND FLOOR A SET BACK WITH MATERIALS STORING ON IT AND THERE WERE NO CONTROL ACCESS TO PREVENT UNAUTHORIZED WORKERS TO ENTER THIS AREA,$10K due
ECB11/17/2025AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED GUARDRAILS AT VARIOUS FLOORS WERE MISSING MID RAILS AND TOE BOARD. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE GUARDRAILS CREATES A HAZARD FOR WOR$25K due
ECB08/22/2025AT THE TIME OF MY INSPECTION, 9 STORY BUILDING APPROXIMATELY 85 FEET IN HEIGHT. ACTIVE JOBSITE UPON REQUEST FOR HYDROSTATIC TEST FOR STANDPIPE TO VERIFY COMPLIANCE WITH CODE AND FIRE SAFETY NONE WAS PROVIDED. F$10K due
ECB08/20/2025AT THE TIME OF INSPECTION ACTIVE JOBSITE, I OBSERVED BUILDING AT THE 9TH FLOOR LEVEL ABOVE 75 FEET IN HEIGHT WAS NOT PROVIDED WITH HORIZONTAL SAFETY NETTING SYSTEM, AT THE 6 FLOOR LEVEL BELOW WORKING DECK TO CA$10K due
ECB08/20/2025AT THE TIME OF INSPECTION ACTIVE SITE, I OBSERVED CONCRETE OPERATIONS AT EXPOSURE#1,4 WITH CONCRETE PUMP AND TRUCK PARKED ADJACENT TO SIDEWALK SHED OPEN TO PUBLIC WAS NOT PROVIDED WITH MESH SCREEN, 4FT WOOD BA$10K due
ECB08/20/2025AT THE TIME OF INSPECTION, I OBSERVED CONCRETE OPERATIONS IN PROGRESS ALONG WITH STREET AND SIDEWALK CLOSURE AT EXPOSURE#1,4 WITH CONCRETE TRUCK AND PUMP OBSTRUCTING STREET UPON REQUEST FOR D.O.T PERMIT FOR CON$10K due
ECB08/20/2025AT THE TIME OF INSPECTION ACTIVE SITE I OBSERVED BUILDING AT THE 9TH FLOOR LEVEL APPROXIMATELY 85FT IN HEIGHT NOT PROVIDED WITH AN ELEVATOR IN READINESS, FAILURE TO PROVIDED ELEVATOR IN READINESS CREATES A HAZA$10K due
ECB07/19/2025PROPOSED 9 STORIES NB WITH A BUILDING FOOTPRINT (SQ. FT.) 17235, WALK JOBSITE PERIMETERS, KNOCK & CALLED OUT, I OBSERVED NO COMPETENT WATCH PERSONNEL AS PER BC 3303.7.7.6 A WATCHPERSON REQUIREMENTS OF SECTION 3$2K due
ECB07/02/20253301.6 MANUFACTURER SPECIFICATIONS, DESIGN, AND CAPACITY. OBSERVED 9 STORY NB WITH SHORING INSTALLED THROUGHOUT JOBSITE. UPON REVIEW OF MANUFACTURE SPECIFICATION AND DESIGNED PLANS PROVIDED ONSITE, DIAGONAL SHO$10K due
ECB07/02/2025OBSERVED ACTIVE JOBSITE ON 4TH FL WORKING DECK WITH INSTALLATION OF SINGLE PHASED WALL FORMS @ EXPO 3 ADJACENT PROPERTY. ADJACENT PROPERTY WINDOW NOT PROTECTED WITHIN 20 FEET FROM CONSTRUCTION OPERATIONS AS PER$12K due
ECB06/07/2025OBSERVED YODOKS INSTALLED AT EXPO#1 AND #4 OF THE SITE, CONTRARY TO MANUFACTURING SPECIFICATIONS. UPON CHECKING DEPARTMENT RECORDS, OBSERVED NO DOT PERMIT WAS ISSUED FOR THIS SITE TO HAVE YODOKS OCCUPYING THE R$10K due
ECB06/07/2025OBSERVED YODOKS INSTALLED AT EXPO#1 #4 OF THE SITE, CONTRARY TO MANUFACTURING SPECIFICATIONS. MIX MATCH COMPONENTS IN USE PREVENTING ALL YODOKS FROM INTERLOCKING TOGETHER, ALSO NOT FILLED WITH WATER AS PER SPEC$6K due
ECB05/15/2025AT THE TIME OF MY INSPECTION OF ACTIVE JOB SITE OBSERVED FOUNDATION WORK IN PROCESS/SUPPORT OF EXCAVATION(APROX. 10-12 FEET DEEP-UPON CHECKING DEPARTMENTS RECORDS -NO NOTIFICATION TO DEPARTMENT MADE PRIOR TO CO$12K due
ECB07/01/2026AT TIME OF INSPECTION OBSERVED AT FIRST FLOOR LARGE ACCUMULATION OF COMBUSTIBLE DEBRIS APPROXIMATELY 7FT HEIGHT. THIS CREATES FIRE HAZARD. STOP ALL WORK ENTIRE SITE ONLY ALLOW TO MAINTAIN HOUSEKEEPING.Hearing held — result not yet published$2K proposed
ECB07/01/2026BC3314.1 AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP# 3 NOT MAINTAINED AS PER CODE SUPPORTED SCAFFOLD NOT FULLY PLANK LOSES NOT TIE DOWN BICYCLES MISSING LOCKING PINS. MISSING NETTING.Hearing held — result not yet published$2K proposed
ECB02/26/2026OBSERVED WORKERS WORKING ON THE PIPE SCAFFOLD AT EXPOSURE 2, MULTIPLE EXPOSURES & LOCATIONS W/ PIPE SCAFFOLDS, PIPE SCAFFOLDS W/ DEVIATIONS FROM PLANS, LACK OF MAINTENANCE. UPON REQUEST FOR DAILY INSPECTIONS BHearing held — result not yet published
ECB02/26/2026OBS MULTIPLE LOCATIONS W/DOORS LEADING/ ACCESS TO BALCONIES, DOORS LEADING INTO PIPE SCAFFOLDS WITH A GAP OF 1 FEET OR MORE BETWEEN THE BUILDING FACADE & WALKING DECK, BYCICLES. DOORS W/OUT CONTROL ACCESS ZONEHearing held — result not yet published
ECB02/26/2026OBSERVED PIPE SCAFFOLDS INSTALLED AT MULTIPLE EXPOSURES & LOCATIONS, PIPE SCAFFOLD W/ LOOSE CONNECTING COMPONENTS, PLANKS, STAIRS LEADING INTO A DEAD END, TEMPORARY PLATFORMS NOT SECURED, LOOSE NETS, AND ACCESSHearing held — result not yet published
ECB02/26/2026OBS SIDEWALK SHED INSTALLED@EXPO1 WITH PIPE SCAFFOLD INSTALLED ON TOP OF THE DECK. ALSO, IT WAS OBSERVED THAT THE DECK OF THE SIDEWALK SHED STILL HAD SNOW & ICE. FAILURE TO MAINTAIN THE SIDEWALK SHED DECK CLEANHearing held — result not yet published