← Back
One family attached or semi-detached
2175 EAST 72ND STREET
BROOKLYN · BIN 3429046
💬 Discuss this project
2023Year Built
—Stories
A5Building Class
R3-1Zoning
2,203 sfGross Floor Area
1Units
3 Open Violations ▸FDNY Report ↗
One family attached or semi-detached · 2,450 sf lot · 0.9 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 232p · 2 filings · 20 docs
Floor 131p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
7201 AVENUE V2407/08/2026
MAZCO CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/17/2025$972K—— → —$441/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DESIGN STUDIO ASSOCIATES810/02/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DESIGN STUDIO ASSOCIATES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAZCO CONSTRUCTION CORPGeneral Contractor507/08/2026
ALL-RITE ELECT CORP OF NY 004437General Contractor403/22/2026
PAR PLUMBING CO., INCPlumbing203/22/2026
J. CAIAZZO PLBG & HTG CORPFire Protection107/08/2026
J. CAIAZZO PLBG & HTG CORPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TRIANGLE INSPECTION & TES7495710/02/2024
Building Lifecycle
All (95)Filed (8)Permit Issued (5)Signed Off (4)Violation (4)Inspection (11)Objection (36)Special Inspection (27)
09/12/2025
Violation issued (ECB, open)
Construction
09/12/2025
Violation issued (ECB, open)
Zoning
09/12/2025
Violation issued (ECB, open)
Construction
07/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/04/2024
Signed off — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-I1
11/04/2024
Signed off — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH NB B00574911
B00844444-I1
10/30/2024
Signed off — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-S1
10/10/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Rajasekhar Sakhamuri
10/02/2024
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH NB B00574911
B00844444-P2
09/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/03/2024
Signed off — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-S2
08/30/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/21/2024
Objection resolved — Addressed
06/20/2024
Objection raised — Scope
06/10/2024
Filed — Alteration
INSTALLATION OF RESIDENTIAL PLUMBING FIXTURES AS PER PLANS FILED HEREWITH IN CONJUNCTION WITH NB B00574911
B00844444-P1
05/17/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/15/2024
Permit issued — Curb Cut
B00574911-S2-CC
04/25/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/28/2024
Filed — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-P2
03/27/2024
Special inspection requirement — Masonry
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Subgrade Inspections
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
ELIAS RASABI
03/27/2024
Special inspection requirement — Energy Code Compliance Inspections
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Fire-Resistance Rated Construction
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Lowest Floor Elevation
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Maintenance information
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Insulation placement and R values
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — HVAC-R and service water heating equipment
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Permanent certificate
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Concrete - Cast-In-Place
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Fenestration air leakage
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Interior lighting power
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Duct leakage testing, insulation and design
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — HVAC-R and service water heating system controls
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Protection of exposed foundation insulation
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Air barrier - visual inspection
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Air barrier — testing
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Electric vehicle service equipment requirements
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Ventilation and air distribution system
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Fenestration areas
Rajasekhar Sakhamuri
03/27/2024
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Rajasekhar Sakhamuri
03/15/2024
Permit issued — Sprinklers
B00574911-S1-EW-SP
11/16/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/12/2023
Objection raised — Zoning
10/12/2023
Objection resolved — Addressed
10/11/2023
Filed — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-S2
06/22/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/15/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2023
Filed — New Building
INSTALLATION OF RESIDENTIAL SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH
B00574911-S1
06/09/2023
Violation issued (ECB, closed)
Construction
05/25/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/14/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/13/2023
Permit issued — Plumbing
B00844444-I1-PL
03/24/2023
Objection raised — Admin
03/24/2023
Objection resolved — Addressed
Latest 60 of 95 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMAZCO CONSTRUCTION CORP05/15/2024
DOB NOWSprinklersSigned-offANTHONY CAIAZZO03/15/2024
DOB NOWPlumbingSigned-offJ. CAIAZZO PLBG & HTG COR04/13/2023
DOB NOWGeneral ConstructionPermit IssuedMAZCO CONSTRUCTION CORP02/06/2023
DOB NOWGeneral ConstructionPermit IssuedMAZCO CONSTRUCTION CORP09/15/2022
1 project · most recent 03/28/2024
Sprinkler System
FiledStatusContractorScope
03/28/2024Signed-offJ. CAIAZZO PLBG & HTG CORSprinkler System
1 project · most recent 12/12/2022
General Wiring
FiledStatusContractorScope
12/12/2022CompleteALL-RITE ELECT CORP OF NYGeneral Wiring
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
07/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/30/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/17/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/25/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/22/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/25/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/14/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
10/10/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
10/10/2024Fire-Resistant Penetrations and JointsRajasekhar Sakhamurispecial
03/27/2024MasonryRajasekhar Sakhamurispecial
03/27/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRajasekhar Sakhamurispecial
03/27/2024Subgrade InspectionsRajasekhar Sakhamurispecial
03/27/2024Subsurface Investigations (Borings/Test Pits)ELIAS RASABIspecial
03/27/2024Energy Code Compliance InspectionsRajasekhar Sakhamuriprogress
03/27/2024Fire-Resistance Rated ConstructionRajasekhar Sakhamuriprogress
03/27/2024Lowest Floor ElevationRajasekhar Sakhamuriprogress
03/27/2024Maintenance informationRajasekhar Sakhamurienergy_progress
03/27/2024Insulation placement and R valuesRajasekhar Sakhamurienergy_progress
03/27/2024HVAC-R and service water heating equipmentRajasekhar Sakhamurienergy_progress
03/27/2024Permanent certificateRajasekhar Sakhamurienergy_progress
03/27/2024Concrete - Cast-In-PlaceRajasekhar Sakhamurispecial
03/27/2024Fenestration air leakageRajasekhar Sakhamurienergy_progress
03/27/2024Interior lighting powerRajasekhar Sakhamurienergy_progress
03/27/2024Duct leakage testing, insulation and designRajasekhar Sakhamurienergy_progress
03/27/2024HVAC-R and service water heating system controlsRajasekhar Sakhamurienergy_progress
03/27/2024Fenestration and door U-factor and product ratingsRajasekhar Sakhamurienergy_progress
03/27/2024Protection of exposed foundation insulationRajasekhar Sakhamurienergy_progress
03/27/2024Air barrier - visual inspectionRajasekhar Sakhamurienergy_progress
03/27/2024Air barrier — testing Rajasekhar Sakhamurienergy_progress
03/27/2024Electric vehicle service equipment requirementsRajasekhar Sakhamurienergy_progress
03/27/2024HVAC-R and service water piping design and insulationRajasekhar Sakhamurienergy_progress
03/27/2024Ventilation and air distribution systemRajasekhar Sakhamurienergy_progress
Latest 25 of 27.
▾Documents — 72 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/27/2026B00844444-P2Request digital key ↗
08/27/2026B00574911-S1Request digital key ↗
08/27/2026B00574911-P2Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-I1Open ↗
08/13/2026B00574911-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B00574911-P2Open ↗
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00574911-I1Open ↗
▸Seals & Professional Certifications35
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026B00574911-P2Open ↗
09/02/2026B00574911-P2Open ↗
09/02/2026B00574911-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B00574911-P2Open ↗
09/02/2026B00574911-P2Open ↗
09/02/2026B00574911-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/27/2026B00844444-P2Open ↗
08/27/2026B00844444-P1Open ↗
08/27/2026B00844444-I1Open ↗
Showing 3 of 8 on file for this type
▸Trade Schedules & Equipment3
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-P2Open ↗
08/13/2026B00574911-I1Open ↗
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/27/2026B00574911-P2Open ↗
08/15/2026B00574911-P1Open ↗
08/15/2026B00574911-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00574911-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00574911-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00574911-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00574911-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026B00574911-P2Open ↗
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B00574911-I1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial3
08/13/2026B00574911-P2Open ↗
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00574911-P2Open ↗
08/13/2026B00574911-P1Open ↗
08/13/2026B00574911-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00574911-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026B00574911-I1Open ↗