Stand-alone food establishment
521 EAST 80TH STREET
BROOKLYN · BIN 3429351
💬 Discuss this project
0Year Built
1Stories
K5Building Class
M1-1Zoning
2,640 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Stand-alone food establishment · Owner of record: 8002 FOSTER PROPERTIES LLC · 20,000 sf lot · 0.13 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Roof11p · 2 filings · 20 docs
Floor 118p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REDFERN REALTY LLC.2103/22/2026
AMC CONTRACTING103/22/2026
8002 FOSTER PROPERTIES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CATAPANO ENGINEERING PC701/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CATAPANO ENGINEERING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCHUMACHER & FARLEY P&H CPlumbing707/08/2026
PRODUCTION CONTRACT. LLCGeneral Contractor603/21/2026
D.B. DEMOLITION, INCGeneral Contractor103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATAPANO ENGINEERING & AR3235601/23/2023
C.M. TESTING LABORATORY,1352201/23/2023
Building Lifecycle
All (49)Filed (7)Permit Issued (3)Signed Off (3)Violation (2)Inspection (4)Special Inspection (30)
03/24/2023
Signed off — Alteration
Proposing install - (1) Gas H.W. Heater,(2)Toilets (2) lavatories. (2) grease interceptor, (8) drains, (1) ice machine, (5) ice bins, (13) non residental sinks. (4) Gas HVAC RTU's (1) dishwasher all w/ associated piping.
B00726251-I1
03/23/2023
Signed off — Alteration
B00727865-I1
02/24/2023
Signed off — Alteration
Proposing for new tenant-work to include remove/install interior partitions, storefront areas, floor & ceiling finishes, rooftop units, concrete curbing,walkway,ramp, concrete pavement/parking layout, footings for new signage, landscaping, trash enclosure
B00726241-I1
01/23/2023
Filed — Alteration
Proposing for new tenant-work to include remove/install interior partitions, storefront areas, floor & ceiling finishes, rooftop units, concrete curbing,walkway,ramp, concrete pavement/parking layout, footings for new signage, landscaping, trash enclosure
B00726241-P1
01/23/2023
Special inspection requirement — Insulation placement and R values
JOHN CATAPANO
01/23/2023
Special inspection requirement — Fenestration areas
JOHN CATAPANO
01/23/2023
Special inspection requirement — Lighting controls
JOHN CATAPANO
01/23/2023
Special inspection requirement — Fenestration air leakage
JOHN CATAPANO
01/23/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
JOHN CATAPANO
01/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
01/23/2023
Special inspection requirement — Exterior lighting power
JOHN CATAPANO
01/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
01/23/2023
Special inspection requirement — Interior lighting power
JOHN CATAPANO
01/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
01/23/2023
Special inspection requirement — Maintenance information
JOHN CATAPANO
01/23/2023
Special inspection requirement — Structural Steel - High Strength Bolting
JOHN SEMIOLI
01/23/2023
Special inspection requirement — Structural Steel - Details
JOHN SEMIOLI
01/23/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
JOHN SEMIOLI
01/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
01/23/2023
Special inspection requirement — Mechanical Systems
JOHN CATAPANO
01/23/2023
Special inspection requirement — Structural Steel - Welding
JOHN SEMIOLI
01/23/2023
Special inspection requirement — Masonry
JOHN SEMIOLI
01/23/2023
Special inspection requirement — Footing and Foundation
JOHN CATAPANO
01/23/2023
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
01/23/2023
Special inspection requirement — Final
JOHN CATAPANO
01/23/2023
Special inspection requirement — Air barrier - visual inspection
JOHN CATAPANO
12/05/2022
Special inspection requirement — HVAC-R and service water heating system controls
JOHN CATAPANO
12/05/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN CATAPANO
12/05/2022
Special inspection requirement — HVAC-R and service water heating equipment
JOHN CATAPANO
12/05/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
12/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
12/05/2022
Special inspection requirement — Maintenance information
JOHN CATAPANO
12/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/01/2022
Filed — Alteration
Proposing install - (1) Gas H.W. Heater,(2)Toilets (2) lavatories. (2) grease interceptor, (8) drains, (1) ice machine, (5) ice bins, (13) non residental sinks. (4) Gas HVAC RTU's (1) dishwasher all w/ associated piping.
B00726251-P3
12/01/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN CATAPANO
12/01/2022
Special inspection requirement — Energy Code Compliance Inspections
JOHN CATAPANO
11/15/2022
Filed — Alteration
Proposing install - (1) Gas H.W. Heater,(2)Toilets (2) lavatories. (2) grease interceptor, (8) drains, (1) ice machine, (5) ice bins, (13) non residental sinks. (4) Gas HVAC RTU's (1) dishwasher all w/ associated piping.
B00726251-P2
11/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/17/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/03/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/07/2022
Permit issued — Plumbing
B00726251-I1-PL
05/31/2022
Filed — Alteration
Proposing install - (1) Gas H.W. Heater,(2)Toilets (2) lavatories. (2) grease interceptor, (8) drains, (1) ice machine, (5) ice bins, (13) non residental sinks. (4) Gas HVAC RTU's (1) dishwasher all w/ associated piping.
B00726251-P1
05/20/2022
Permit issued — Mechanical Systems
B00726241-I1-GC-CX
05/13/2022
Permit issued — Construction Fence
B00727865-I1-FN
05/06/2022
Filed — Alteration
B00727865-I1
05/05/2022
Filed — Alteration
Proposing install - (1) Gas H.W. Heater,(2)Toilets (2) lavatories. (2) grease interceptor, (8) drains, (1) ice machine, (5) ice bins, (13) non residental sinks. (4) Gas HVAC RTU's (1) dishwasher all w/ associated piping.
B00726251-I1
05/05/2022
Filed — Alteration
Proposing for new tenant-work to include remove/install interior partitions, storefront areas, floor & ceiling finishes, rooftop units, concrete curbing,walkway,ramp, concrete pavement/parking layout, footings for new signage, landscaping, trash enclosure
B00726241-I1
03/23/2000
Violation issued (ECB, closed)
Site Safety
02/07/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSCHUMACHER & FARLEY P&H C06/07/2022
DOB NOWMechanical SystemsSigned-offPRODUCTION CONTRACT. LLC05/20/2022
DOB NOWConstruction FenceSigned-offPRODUCTION CONTRACT. LLC05/13/2022
BIS—ISSUEDD.B. DEMOLITION, INC03/31/2025
BIS—ISSUEDD.B. DEMOLITION, INC07/01/2022
BIS—ISSUEDD.B. DEMOLITION, INC03/07/2022
BIS—ISSUEDA N C CONST CORP08/08/2000
BISPLISSUEDAGIUS PLUMBING & HTG INC06/09/2000
1 project · most recent 06/09/2022
General Wiring
FiledStatusContractorScope
06/09/2022Permit IssuedJANON ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/17/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
01/23/2023HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
01/23/2023FinalJOHN CATAPANOprogress
01/23/2023Air barrier - visual inspectionJOHN CATAPANOenergy_progress
01/23/2023Fenestration areasJOHN CATAPANOenergy_progress
01/23/2023HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
01/23/2023Fenestration and door U-factor and product ratingsJOHN CATAPANOenergy_progress
01/23/2023Insulation placement and R valuesJOHN CATAPANOenergy_progress
01/23/2023Fenestration air leakageJOHN CATAPANOenergy_progress
01/23/2023Lighting controlsJOHN CATAPANOenergy_progress
01/23/2023Maintenance informationJOHN CATAPANOenergy_progress
01/23/2023Exterior lighting powerJOHN CATAPANOenergy_progress
01/23/2023HVAC-R and service water heating system controlsJOHN CATAPANOenergy_progress
01/23/2023Interior lighting powerJOHN CATAPANOenergy_progress
01/23/2023Structural Steel - High Strength BoltingJOHN SEMIOLIspecial
01/23/2023Structural Steel - DetailsJOHN SEMIOLIspecial
01/23/2023Structural Stability – Alterations of existing buildingsJOHN SEMIOLIspecial
01/23/2023Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
01/23/2023Mechanical SystemsJOHN CATAPANOspecial
01/23/2023Structural Steel - WeldingJOHN SEMIOLIspecial
01/23/2023MasonryJOHN SEMIOLIspecial
01/23/2023Footing and FoundationJOHN CATAPANOprogress
01/23/2023Energy Code Compliance InspectionsJOHN CATAPANOprogress
12/05/2022HVAC-R and service water heating equipmentJOHN CATAPANOenergy_progress
12/05/2022Fire-Resistant Penetrations and JointsJOHN CATAPANOspecial
12/05/2022HVAC-R and service water piping design and insulationJOHN CATAPANOenergy_progress
Latest 25 of 68.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/29/2026B00726241-I1Request digital key ↗
08/29/2026B00726241-P1Request digital key ↗
08/29/2026B00727865-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits33
▸BISPLAN / WORK APPROVAL APPLICATION24
09/11/2025300995216Open ↗
09/09/2025301005329Open ↗
01/30/2025301005329Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION8
04/02/2025300995216Open ↗
03/20/2025300995216Open ↗
07/01/2022300995216Open ↗
Showing 3 of 8 on file for this type
▸BISPLEASE PROVIDE APPLICATION FOR STREET# & PD1 STAMPED BY TOPO PRIOR TO NEXTTCO RENEWAL.1
09/11/2025300995216Open ↗
▸Seals & Professional Certifications34
▸DOB NOWSpecial Inspector Seal & Signature16
09/01/2026B00726251-P1Open ↗
08/28/2026B00726241-I1Open ↗
08/28/2026B00726241-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature11
09/01/2026B00726251-P1Open ↗
08/28/2026B00726241-I1Open ↗
08/28/2026B00726241-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/29/2026B00726241-I1Open ↗
08/29/2026B00727865-I1Open ↗
08/29/2026B00726251-I1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
10/05/2021300995216Open ↗
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis2
08/29/2026B00726251-I1Open ↗
08/13/2026B00726241-I1Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
10/05/2021300995216Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
10/05/2021300995216Open ↗
▸Approvals, Objections & Sign-offs16
▸BISSCHEDULE A - OCCUPANCY / USE8
09/11/2025300995216Open ↗
08/19/2024300995216Open ↗
07/18/2024300995216Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/14/2025301005329Open ↗
10/14/2025301005329Open ↗
10/14/2025301005329Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER3
02/05/2022300995216Open ↗
01/28/2022300995216Open ↗
12/21/2021300995216Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE2
07/01/2022300995216Open ↗
02/05/2022300995216Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
02/05/2022300995216Open ↗
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
04/02/2025300995216Open ↗
▸BISCOST AFFIDAVIT1
10/05/2021300995216Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION6
02/11/2025300995216Open ↗
01/20/2022300995216Open ↗
11/22/2021300995216Open ↗
Showing 3 of 6 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
04/13/2022300995216Open ↗
04/13/2022300995216Open ↗