← Back
Office only, 1 story
19 STREET
BROOKLYN · BIN 3429906
💬 Discuss this project
1930Year Built
1Stories
O1Building Class
M3-1Zoning
27,270 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Office only, 1 story · Owner of record: SIP HOLDINGS VENTURE, LLC · 435,718 sf lot · 0.06 FAR built · Flood zone X500
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRIDGE DEVELOPMENT PARTNERS704/09/2026
PLATINUM SERVICES NY503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MSM ENGINEERING SERVICES, PLLC103/11/2025
BOHLER ENGINEERING NY PLLC208/27/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GGONZALEZ BOHLERENG COM403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PLATINUM SERVICES NY LLCGeneral Contractor303/21/2026
NORTHEAST SPECIALIST GROUPGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ACE STRUCTURAL ENGINEERIN496108/27/2024
Building Lifecycle
All (8)Filed (3)Permit Issued (3)Signed Off (2)
03/25/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
B01185661-I1
03/05/2026
Signed off — Full Demolition
Filing herewith plans for the demolition of a 1-story building (Verizon Outbuilding).
B01096994-I1
12/16/2025
Permit issued — Full Demolition
B01096994-I1-FD
12/15/2025
Permit issued — Protection and Mechanical Methods
B01096994-S1-PMM
03/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NY BUILDING CODE.
B01185661-I1
03/11/2025
Permit issued — Protection and Mechanical Methods
B01185661-I1-PMM
08/27/2024
Filed — Full Demolition
Filing herewith plans for the demolition of a 1-story building (Verizon Outbuilding).
B01096994-I1
08/27/2024
Filed — Full Demolition
Filing herewith plans for the demolition of a 1-story building (Verizon Outbuilding).
B01096994-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offNORTHEAST SPECIALIST GROUP12/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offNORTHEAST SPECIALIST GROUP12/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offPLATINUM SERVICES NY LLC03/11/2025
Nothing on file for this building.
Nothing on file for this building.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/24/2026B01096994-S1Request digital key ↗
08/24/2026B01096994-I1Request digital key ↗
08/22/2026B01185661-I1Request digital key ↗
▸Applications & Permits2
▸DOB NOWDEP Stormwater Maintenance Permit1
08/24/2026B01096994-I1Open ↗
▸DOB NOWDEP Stormwater Construction Permit1
08/24/2026B01096994-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/24/2026B01096994-S1Open ↗
08/24/2026B01096994-I1Open ↗
08/13/2026B01185661-I1Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWGas Cut-Off1
08/24/2026B01096994-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/24/2026B01096994-I1Open ↗
▸DOB NOWElectric Cut-Off1
08/24/2026B01096994-I1Open ↗
▸DOB NOWWater Cut-Off1
08/24/2026B01096994-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/24/2026B01096994-I1Open ↗
▸DOB NOWRodent Control1
08/24/2026B01096994-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWNew York DEC Notice of Determination1
08/24/2026B01096994-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/24/2026B01096994-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/24/2026B01096994-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/24/2026B01096994-I1Open ↗
▸DOB NOWStructure Photographs1
08/24/2026B01096994-I1Open ↗