← Back
BROOKLYN
3148 SHORE PARKWAY
BROOKLYN · BIN 3430134
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Flood zone X500
Locations of Work
ArchitectureStructuralElectricalGeneral
Roof4p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
1 job · most recent 03/05/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026——Heating and Air Conditioning Systems
Heat / Cool
Daikin RXSQ36TAVJU 34,200 BTU · Vrf Outdoor ×19
RZQ18TAVJU 18,000 BTU · Heat Pump Outdoor ×10
RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×9
RZQ18TAVJUA 18,000 BTU · Heat Pump Outdoor ×5
RXTA48AAVJU 45,000 BTU · Vrf Outdoor ×4
RX09NMVJU 9,000 BTU · Heat Pump Outdoor ×1
1 job · most recent 03/05/2026
Sprinkler System
FiledStatusContractorScope
03/05/2026——Sprinkler System
1 job · most recent 03/05/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026——Storm, Water/Sanitary
1 job · most recent 10/12/2025
General Wiring
FiledStatusContractorScope
10/12/2025Permit IssuedMAC ELECT'L CONTR. INC.General Wiring
1 job · most recent 03/05/2026
Concrete Masonry
FiledStatusContractorScope
03/05/2026——Concrete, Masonry
Building Lifecycle
All (66)Filed (9)Permit Issued (3)Signed Off (1)Violation (4)Objection (19)Special Inspection (30)
09/08/2026
Objection resolved — Resolved
09/02/2026
Objection resolved — Resolved
08/27/2026
Permit issued — Construction Fence
B01219319-I1-FN
03/21/2026
Objection resolved — Addressed
03/21/2026
Objection resolved — Addressed
03/12/2026
Objection raised — Other
03/12/2026
Objection raised — Energy
03/12/2026
Objection resolved — Addressed
03/05/2026
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S6
02/28/2026
Objection raised — Scope
02/28/2026
Objection resolved — Addressed
02/28/2026
Objection resolved — Addressed
02/27/2026
Objection raised — Admin
01/30/2026
Objection resolved — Addressed
01/28/2026
Objection resolved — Addressed
12/15/2025
Signed off — Full Demolition
Full demolition of the existing building.
B01219506-I1
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/14/2025
Objection raised — Other
10/03/2025
Objection raised — Other
09/22/2025
Permit issued — Full Demolition
B01219506-I1-FD
09/15/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S3
09/15/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S1
09/15/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S2
09/15/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S5
09/15/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-S4
09/15/2025
Special inspection requirement — Deep Foundation Elements
09/15/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/15/2025
Special inspection requirement — Masonry
09/15/2025
Special inspection requirement — Structural Cold-Formed Steel
09/15/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
09/15/2025
Special inspection requirement — Concrete - Cast-In-Place
09/15/2025
Special inspection requirement — Subgrade Inspections
09/10/2025
Permit issued — Construction Fence
B01219319-I1-FN
09/05/2025
Objection raised — Other
07/31/2025
Filed — New Building
STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING
B01216521-I1
07/13/2025
Special inspection requirement — Duct leakage testing, insulation and design
07/13/2025
Special inspection requirement — Maintenance information
07/13/2025
Special inspection requirement — Metering
07/13/2025
Special inspection requirement — Maintenance information
07/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/13/2025
Special inspection requirement — Heating Systems
07/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2025
Special inspection requirement — Shutoff dampers
07/13/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/13/2025
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
07/13/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/13/2025
Special inspection requirement — HVAC-R and service water heating system controls
07/13/2025
Special inspection requirement — HVAC-R and service water heating equipment
07/13/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
07/09/2025
Special inspection requirement — Sprinkler Systems
07/09/2025
Special inspection requirement — Mechanical Systems
07/09/2025
Special inspection requirement — Final
07/09/2025
Special inspection requirement — Final
07/09/2025
Special inspection requirement — Final
07/09/2025
Special inspection requirement — Footing and Foundation
07/09/2025
Special inspection requirement — Standpipe Systems
Latest 60 of 66 events.
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AVALON DESIGNS403/21/2026
RSLN ARCHITECTURE1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILD R US CORPGeneral Contractor308/30/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedBUILD R US CORP08/27/2026
DOB NOWFull DemolitionSigned-offBUILD R US09/22/2025
DOB NOWConstruction FencePermit IssuedBUILD R US09/10/2025
BISOTISSUEDNONE12/30/1993
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
09/15/2025Deep Foundation Elements—special
09/15/2025Excavations - Sheeting, Shoring, and Bracing—special
09/15/2025Masonry—special
09/15/2025Structural Cold-Formed Steel—special
09/15/2025Subsurface Investigations (Borings/Test Pits)—special
09/15/2025Concrete - Cast-In-Place—special
09/15/2025Subgrade Inspections—special
07/13/2025Duct leakage testing, insulation and design—energy_progress
07/13/2025Maintenance information—energy_progress
07/13/2025Metering—energy_progress
07/13/2025Maintenance information—energy_progress
07/13/2025Fire-Resistant Penetrations and Joints—special
07/13/2025Heating Systems—special
07/13/2025HVAC-R and service water piping design and insulation—energy_progress
07/13/2025HVAC-R and service water heating equipment—energy_progress
07/13/2025HVAC-R and service water heating system controls—energy_progress
07/13/2025Shutoff dampers—energy_progress
07/13/2025Fire-Resistant Penetrations and Joints—special
07/13/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
07/13/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/13/2025HVAC-R and service water heating system controls—energy_progress
07/13/2025HVAC-R and service water heating equipment—energy_progress
07/13/2025HVAC-R and service water piping design and insulation—energy_progress
07/09/2025Sprinkler Systems—special
07/09/2025Mechanical Systems—special
Latest 25 of 50.
▾Documents — 44 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026B01219506-I1Request digital key ↗
08/21/2026B01219319-I1Request digital key ↗
08/20/2026B01216521-S2Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWRestrictive Declaration/Easement 14
08/13/2026B01216521-S6Open ↗
08/13/2026B01216521-S5Open ↗
08/13/2026B01216521-S4Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01216521-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01216521-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01216521-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026B01219319-I1Open ↗
08/20/2026B01216521-S2Open ↗
08/20/2026B01216521-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWCONTRACTOR SEAL & SIGNATURE1
08/13/2026B01219506-I1Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWElectric Cut-Off1
08/13/2026B01219506-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B01219506-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B01219506-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B01219506-I1Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01216521-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B01216521-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01216521-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01219506-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B01219506-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026B01216521-S2Open ↗
08/13/2026B01216521-S2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01216521-S2Open ↗
▸Other Documents7
▸DOB NOWProperty Ownership Certification2
08/20/2026B01216521-I1Open ↗
08/13/2026B01219506-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01216521-I1Open ↗
▸DOB NOWCommunity Board Notification1
08/13/2026B01219506-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B01219506-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B01219506-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01216521-I1Open ↗