← Back
Unlicensed parking lot
4318 AVENUE D
BROOKLYN · BIN 3430195
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R4Zoning
0 sfGross Floor Area
0Units
2 Open Violations 0 unresolved · 2 paperwork only ▸FDNY Report ↗
Unlicensed parking lot · Owner of record: AVENUE M26 LLC · 1,901 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 2 filings · 20 docs
Floor 1Under Construction1p · 2 filings · 20 docs
CellarUnder Construction2p · 2 filings · 20 docs
1 job · most recent 04/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/08/2026Permit IssuedJ&J DESIGNS INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM48NAM-U1 48,000 BTU · Split System ×6
Ventilation
Delta Breeze SMT150 150 CFM ×6
Honeywell VE30160 , VE30100 200 CFM · Erv ×6
1 job · most recent 09/23/2025
FiledStatusContractorScope
09/23/2025Permit IssuedRENEW PLUMBING CORP30 heads
2 jobs · most recent 04/08/2026
Storm Water/Sanitary
FiledStatusContractorScope
04/08/2026Permit IssuedRENEW PLUMBING CORPStorm, Water/Sanitary
09/23/2025———
1 job · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 job · most recent 04/08/2026
Steel Masonry Wood
FiledStatusContractorScope
04/08/2026Permit IssuedJ&J DESIGNS INCSteel, Masonry, Wood
1 job · most recent 04/08/2026
Fence
FiledStatusContractorScope
04/08/2026Permit IssuedJ&J DESIGNS INCFence
1 job · most recent 04/08/2026
Earthwork
FiledStatusContractorScope
04/08/2026Permit IssuedJ&J DESIGNS INCEarthwork
Building Lifecycle
All (94)Filed (6)Permit Issued (7)Violation (1)Inspection (6)Objection (44)Special Inspection (30)
09/17/2026
Permit issued — Structural
B01241131-I1-GC-CX
09/17/2026
Permit issued — Construction Fence
B01241131-S2-FN
09/14/2026
Permit issued — Construction Fence
B01241131-S2-FN
07/20/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/30/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
05/20/2026
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
05/20/2026
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
05/20/2026
Special inspection requirement — Fenestration air leakage
sion hourizadeh
05/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
05/20/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
sion hourizadeh
05/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
05/20/2026
Special inspection requirement — Ventilation and air distribution system
sion hourizadeh
05/20/2026
Special inspection requirement — Electric vehicle service equipment requirements
sion hourizadeh
05/20/2026
Special inspection requirement — Insulation placement and R values
sion hourizadeh
05/20/2026
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
05/20/2026
Special inspection requirement — Structural Cold-Formed Steel
sion hourizadeh
05/20/2026
Special inspection requirement — Heating Systems
sion hourizadeh
05/20/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
05/20/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
05/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
05/20/2026
Special inspection requirement — Masonry
sion hourizadeh
05/20/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
05/20/2026
Special inspection requirement — Mechanical Systems
sion hourizadeh
05/20/2026
Special inspection requirement — Subgrade Inspections
sion hourizadeh
05/20/2026
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
05/20/2026
Special inspection requirement — Preliminary
sion hourizadeh
05/20/2026
Special inspection requirement — Footing and Foundation
sion hourizadeh
05/20/2026
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
05/20/2026
Special inspection requirement — Final
sion hourizadeh
05/20/2026
Special inspection requirement — Lighting in dwelling units
sion hourizadeh
05/20/2026
Special inspection requirement — Permanent certificate
sion hourizadeh
05/20/2026
Special inspection requirement — Maintenance information
sion hourizadeh
05/20/2026
Special inspection requirement — Metering
sion hourizadeh
05/20/2026
Special inspection requirement — Fenestration areas
sion hourizadeh
05/08/2026
Objection resolved — Addressed
04/29/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/29/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/27/2026
Permit issued — Sprinklers
B01291699-I1-EW-SP
04/16/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
04/15/2026
Objection raised — Energy
04/14/2026
Permit issued — Plumbing
B01241131-S1-PL
04/08/2026
Filed — New Building
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION NUMBER B01241131-I1 TO ADD NEW FIXTURES
B01241131-P2
04/03/2026
Violation issued (ECB, open)
Construction
12/18/2025
Filed — New Building
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION NUMBER B01241131-I1 TO ADD NEW FIXTURES
B01241131-P1
12/16/2025
Permit issued — Foundation
B01241131-I1-GC-CX
12/10/2025
Permit issued — Construction Fence
B01241131-S2-FN
10/22/2025
Filed — New Building
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION NUMBER B01241131-I1 TO ADD NEW FIXTURES
B01241131-S2
10/07/2025
Objection resolved — Addressed
10/06/2025
Objection raised — Other
09/23/2025
Filed — Alteration
Install fire sprinkler system in conjunction with NB/GC application B01241131. The system is hydraulically calculated. There is no change in use occupancy or egress.
B01291699-I1
09/22/2025
Filed — New Building
THIS PLUMBING APPLICATION IS FILED IN CONJUNCTION WITH NB APPLICATION NUMBER B01241131-I1 TO ADD NEW FIXTURES
B01241131-S1
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
09/19/2025
Objection resolved — Addressed
Latest 60 of 94 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ATOMIC CONTRACTING1809/18/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2025$1.2M—ROMAN CATHOLIC CHURCH OF ST. THERESE OF LISIEUX, → AVENUE M26 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SION CONSULTING ENGINEERING PC504/08/2026
AUTOMATED DESIGN ENGINEERING, PLLC109/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor509/18/2026
RENEW PLUMBING CORPFire Protection107/08/2026
RENEW PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SION CONSULTING ENG. PC1108604/08/2026
AUTOMATED DESIGN CONSULTA895109/23/2025
TRIANGLE INSPECTION & TES7495109/22/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit IssuedJ&J DESIGNS INC09/17/2026
DOB NOWConstruction FencePermit IssuedJ&J DESIGNS INC09/17/2026
DOB NOWConstruction FencePermit IssuedJ&J DESIGNS INC09/14/2026
DOB NOWSprinklersPermit IssuedRENEW PLUMBING CORP04/27/2026
DOB NOWPlumbingPermit IssuedRENEW PLUMBING CORP04/14/2026
DOB NOWFoundationPermit IssuedJ&J DESIGNS INC12/16/2025
DOB NOWConstruction FencePermit IssuedJ&J DESIGNS INC12/10/2025
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/20/2026Pass-Final PL - UndergroundPassView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/29/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/29/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/16/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 73
DateRequirementInspectorRole
05/20/2026Ventilation and air distribution systemsion hourizadehenergy_progress
05/20/2026Air barrier — testing sion hourizadehenergy_progress
05/20/2026Fenestration areassion hourizadehenergy_progress
05/20/2026HVAC-R and service water heating system controlssion hourizadehenergy_progress
05/20/2026Protection of exposed foundation insulationsion hourizadehenergy_progress
05/20/2026Fenestration and door U-factor and product ratingssion hourizadehenergy_progress
05/20/2026HVAC-R and service water heating equipmentsion hourizadehenergy_progress
05/20/2026Fenestration air leakagesion hourizadehenergy_progress
05/20/2026Insulation placement and R valuession hourizadehenergy_progress
05/20/2026Electric vehicle service equipment requirementssion hourizadehenergy_progress
05/20/2026Air barrier - visual inspectionsion hourizadehenergy_progress
05/20/2026Concrete - Cast-In-Placesion hourizadehspecial
05/20/2026Structural Cold-Formed Steelsion hourizadehspecial
05/20/2026Heating Systemssion hourizadehspecial
05/20/2026Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
05/20/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
05/20/2026Fire-Resistant Penetrations and Jointssion hourizadehspecial
05/20/2026Masonrysion hourizadehspecial
05/20/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
05/20/2026Mechanical Systemssion hourizadehspecial
05/20/2026Subgrade Inspectionssion hourizadehspecial
05/20/2026Energy Code Compliance Inspectionssion hourizadehprogress
05/20/2026Preliminarysion hourizadehprogress
05/20/2026Footing and Foundationsion hourizadehprogress
05/20/2026Fire-Resistance Rated Constructionsion hourizadehprogress
Latest 25 of 73.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01291699-I1Contact architect ↗
08/17/2026B01241131-S1Contact architect ↗
08/17/2026B01241131-P1Contact architect ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWSpecial Inspector Seal & Signature8
09/02/2026B01241131-I1Open ↗
09/02/2026B01241131-I1Open ↗
09/02/2026B01241131-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026B01241131-P2Open ↗
08/17/2026B01241131-P1Open ↗
08/17/2026B01241131-S2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01241131-I1Open ↗
09/02/2026B01241131-I1Open ↗
08/26/2026B01241131-S1Open ↗
Showing 3 of 6 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01241131-I1Open ↗
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026B01241131-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026B01241131-I1Open ↗
▸Other Documents10
▸DOB NOWSite Survey: Initial3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/17/2026B01241131-P1Open ↗
08/15/2026B01241131-I1Open ↗
08/14/2026B01241131-P2Open ↗
▸DOB NOWAdjoining Owners Notification1
08/15/2026B01241131-I1Open ↗