| Owner | Filings | Most Recent |
|---|---|---|
| JAMES EQUITIES | 14 | 03/21/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 05/09/2023 | $10.8M | — | SISTERS OF MERCY OF THE AMERICAS → CRISTO REY BROOKLYN HIGH SCHOOL | $234/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| ETTINGER ENGINEERING ASSOCIATES | 4 | 01/28/2026 |
| WEXLER ASSOCIATES | 2 | 01/21/2026 |
| EQ ARCHITECTURE PLLC | 1 | 12/05/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| P WOLFE CONSULTANTS | 14 | 03/21/2026 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 01/28/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ZRUM144BTE6 12 tons · Vrf Outdoor ×2 ZRUM096BTE6 8 tons · Vrf Outdoor ×1 ZRUM168BTE6 14 tons · Vrf Outdoor ×1 Ventilation — HE2X 1,690 CFM · Exhaust Fan ×2 BEF500x 2,400 CFM · Exhaust Fan ×1 BSQ-90 585 CFM · Exhaust Fan ×1 CSP-A700-VG 500 CFM · Exhaust Fan ×1 USF-15 2,070 CFM · Exhaust Fan ×1 Greenheck USF-13-B7 1,660 CFM · Exhaust Fan ×3 AX-80-275-0618-A100 15,500 CFM · Exhaust Fan ×2 USF-15-B7 1,980 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/28/2026 | — | — | Concrete |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 12/16/2025 | Standpipe Systems | — | special |
| 12/12/2025 | Concrete - Cast-In-Place | — | special |
| 12/12/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 12/12/2025 | Masonry | — | special |
| 12/12/2025 | Post-installed Anchors | — | special |
| 12/11/2025 | Final | — | progress |
| 12/10/2025 | Metering | — | energy_progress |
| 12/10/2025 | Lighting in dwelling units | — | energy_progress |
| 12/10/2025 | Electrical motors and elevators | — | energy_progress |
| 12/10/2025 | Lighting controls | — | energy_progress |
| 12/10/2025 | Maintenance information | — | energy_progress |
| 12/10/2025 | Interior lighting power | — | energy_progress |
| 12/10/2025 | Exterior lighting power | — | energy_progress |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 12/09/2025 | Sprinkler Systems | — | special |
| 12/09/2025 | Standpipe Systems | — | special |
| 12/09/2025 | Emergency and Standby Power Systems (Generator) | — | special |
| 12/09/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 12/09/2025 | Post-installed Anchors | — | special |
| 12/09/2025 | Mechanical Systems | — | special |
| 12/09/2025 | Final | — | progress |
| 12/09/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 12/09/2025 | Shutoff dampers | — | energy_progress |
| 12/09/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 12/09/2025 | Duct leakage testing, insulation and design | — | energy_progress |