← Back
Parochial school, yeshiva
710 EAST 37TH STREET
BROOKLYN · BIN 3430210
💬 Discuss this project
1942Year Built
3Stories
W2Building Class
R4Zoning
45,900 sfGross Floor Area
0Units
LL97 Covered0 Open ViolationsFDNY Report ↗
Parochial school, yeshiva · Owner of record: CRISTO REY BROOKLYN HIGH SCHOOL · 31,793 sf lot · 1.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 92p · 1 filing · 20 docs
Floor 83p · 1 filing · 20 docs
Floor 73p · 1 filing · 20 docs
Floor 64p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 14p · 1 filing · 20 docs
Cellar2p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JAMES EQUITIES1403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/09/2023$10.8M—SISTERS OF MERCY OF THE AMERICAS → CRISTO REY BROOKLYN HIGH SCHOOL$234/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETTINGER ENGINEERING ASSOCIATES401/28/2026
WEXLER ASSOCIATES201/21/2026
EQ ARCHITECTURE PLLC112/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
P WOLFE CONSULTANTS1403/21/2026
Building Lifecycle
All (44)Filed (7)Objection (7)Special Inspection (30)
03/13/2026
Objection resolved — Addressed
03/02/2026
Objection raised — Admin
02/26/2026
Objection raised — Other
02/25/2026
Objection raised — Other
02/19/2026
Objection raised — Other
02/19/2026
Objection raised — Admin
01/28/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S2
01/23/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S1
01/22/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S3
01/22/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S6
01/21/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S5
01/21/2026
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-S4
01/07/2026
Objection raised — Other
12/16/2025
Special inspection requirement — Standpipe Systems
12/12/2025
Special inspection requirement — Concrete - Cast-In-Place
12/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
12/12/2025
Special inspection requirement — Masonry
12/12/2025
Special inspection requirement — Post-installed Anchors
12/11/2025
Special inspection requirement — Final
12/10/2025
Special inspection requirement — Metering
12/10/2025
Special inspection requirement — Lighting in dwelling units
12/10/2025
Special inspection requirement — Electrical motors and elevators
12/10/2025
Special inspection requirement — Lighting controls
12/10/2025
Special inspection requirement — Maintenance information
12/10/2025
Special inspection requirement — Interior lighting power
12/10/2025
Special inspection requirement — Exterior lighting power
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/09/2025
Special inspection requirement — Sprinkler Systems
12/09/2025
Special inspection requirement — Standpipe Systems
12/09/2025
Special inspection requirement — Emergency and Standby Power Systems (Generator)
12/09/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
12/09/2025
Special inspection requirement — Post-installed Anchors
12/09/2025
Special inspection requirement — Mechanical Systems
12/09/2025
Special inspection requirement — Final
12/09/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
12/09/2025
Special inspection requirement — Shutoff dampers
12/09/2025
Special inspection requirement — HVAC-R and service water heating equipment
12/09/2025
Special inspection requirement — Duct leakage testing, insulation and design
12/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
12/05/2025
Filed — New Building
Process Filing for Proposed 9 Story + Cellar as per plans attached. New Certificate of Occupancy will be required.
B01323981-I1
12/03/2025
Special inspection requirement — Lowest Floor Elevation
12/03/2025
Special inspection requirement — Vertical Masonry Foundation Elements
12/03/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
12/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 01/28/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/28/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ice Air RSXC13 12,500 BTU · Ptac ×126
RSXC09 9,200 BTU · Ptac ×49
Lg ZRUM144BTE6 12 tons · Vrf Outdoor ×2
ZRUM096BTE6 8 tons · Vrf Outdoor ×1
ZRUM168BTE6 14 tons · Vrf Outdoor ×1
Ventilation
— HE2X 1,690 CFM · Exhaust Fan ×2
BEF500x 2,400 CFM · Exhaust Fan ×1
BSQ-90 585 CFM · Exhaust Fan ×1
CSP-A700-VG 500 CFM · Exhaust Fan ×1
USF-15 2,070 CFM · Exhaust Fan ×1
Greenheck USF-13-B7 1,660 CFM · Exhaust Fan ×3
AX-80-275-0618-A100 15,500 CFM · Exhaust Fan ×2
USF-15-B7 1,980 CFM · Exhaust Fan ×1
1 project · most recent 01/28/2026
Sprinkler System
FiledStatusContractorScope
01/28/2026——Sprinkler System
1 project · most recent 01/28/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
01/28/2026——Gas, Storm, Water/Sanitary
1 project · most recent 01/28/2026
Concrete
FiledStatusContractorScope
01/28/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 59
DateRequirementInspectorRole
12/16/2025Standpipe Systems—special
12/12/2025Concrete - Cast-In-Place—special
12/12/2025Structural Stability – Alterations of existing buildings—special
12/12/2025Masonry—special
12/12/2025Post-installed Anchors—special
12/11/2025Final—progress
12/10/2025Metering—energy_progress
12/10/2025Lighting in dwelling units—energy_progress
12/10/2025Electrical motors and elevators—energy_progress
12/10/2025Lighting controls—energy_progress
12/10/2025Maintenance information—energy_progress
12/10/2025Interior lighting power—energy_progress
12/10/2025Exterior lighting power—energy_progress
12/09/2025Fire-Resistant Penetrations and Joints—special
12/09/2025Sprinkler Systems—special
12/09/2025Standpipe Systems—special
12/09/2025Emergency and Standby Power Systems (Generator)—special
12/09/2025Fire-Resistant Penetrations and Joints—special
12/09/2025Post-installed Anchors—special
12/09/2025Mechanical Systems—special
12/09/2025Final—progress
12/09/2025HVAC-R and service water piping design and insulation—energy_progress
12/09/2025Shutoff dampers—energy_progress
12/09/2025HVAC-R and service water heating equipment—energy_progress
12/09/2025Duct leakage testing, insulation and design—energy_progress
Latest 25 of 59.
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/19/2026B01323981-S4Request digital key ↗
08/19/2026B01323981-S1Request digital key ↗
08/19/2026B01323981-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records10
▸DOB NOWRestrictive Declaration/Easement 17
08/13/2026B01323981-S2Open ↗
08/13/2026B01323981-S4Open ↗
08/13/2026B01323981-S6Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01323981-I1Open ↗
▸DOB NOWRestrictive Declaration/Easement 21
08/13/2026B01323981-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01323981-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/19/2026B01323981-S6Open ↗
08/19/2026B01323981-I1Open ↗
08/19/2026B01323981-S1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01323981-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01323981-S4Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/14/2026B01323981-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/14/2026B01323981-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01323981-I1Open ↗