← Back
Unlicensed parking lot
2617 HARWAY AVENUE
BROOKLYN · BIN 3430243
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R5Zoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: HARWAY 26, LLC · 7,150 sf lot · 0 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC209/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACER CONSTRUCTION INCGeneral Contractor109/16/2026
Building Lifecycle
All (84)Filed (2)Permit Issued (1)Objection (57)Special Inspection (24)
09/15/2026
Permit issued — Construction Fence
B01459582-I1-FN
09/14/2026
Filed — Alteration
SUBMIT TEMPORARY CONSTRUCTION FENCE AT OPEN SPACE, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01459582-I1
05/18/2026
Objection raised — Scope
05/01/2026
Objection resolved — Open
05/01/2026
Objection resolved — Open
05/01/2026
Objection resolved — Addressed
05/01/2026
Objection resolved — Open
02/20/2026
Objection resolved — Addressed
02/20/2026
Objection resolved — Addressed
02/13/2026
Objection raised — Scope
02/13/2026
Objection raised — Zoning
02/03/2026
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
08/21/2025
Objection resolved — Addressed
08/04/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
07/29/2025
Objection raised — Zoning
07/29/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/10/2025
Objection resolved — Addressed
07/02/2025
Objection raised — Admin
07/02/2025
Objection raised — Zoning
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/22/2025
Objection resolved — Addressed
06/21/2025
Special inspection requirement — Metering
06/06/2025
Objection raised — Zoning
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Energy
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Inspections
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Energy
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Energy
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Fire_Protection
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Scope
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Structural
06/06/2025
Objection raised — Scope
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedACER CONSTRUCTION INC09/15/2026
1 project · most recent 09/14/2026
Fence
FiledStatusContractorScope
09/14/2026Permit IssuedACER CONSTRUCTION INCFence
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/04/2025Subsurface Investigations (Borings/Test Pits)—special
06/21/2025Metering—energy_progress
05/22/2025Exterior Insulation and Finish Systems (EIFS)—special
05/22/2025Fire-Resistant Penetrations and Joints—special
05/22/2025Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
05/22/2025Masonry—special
05/22/2025Subgrade Inspections—special
05/22/2025Lowest Floor Elevation—progress
05/22/2025Energy Code Compliance Inspections—progress
05/22/2025Fire-Resistance Rated Construction—progress
05/22/2025Air barrier — testing —energy_progress
05/22/2025Exterior lighting power—energy_progress
05/22/2025Lighting controls—energy_progress
05/22/2025Air barrier - visual inspection—energy_progress
05/22/2025Lighting in dwelling units—energy_progress
05/22/2025Fenestration air leakage—energy_progress
05/22/2025Fenestration areas—energy_progress
05/22/2025Electrical motors and elevators—energy_progress
05/22/2025Maintenance information—energy_progress
05/22/2025Fenestration and door U-factor and product ratings—energy_progress
05/22/2025Insulation placement and R values—energy_progress
05/22/2025Structural Stability – Alterations of existing buildings—special
05/22/2025Interior lighting power—energy_progress
05/22/2025Concrete - Cast-In-Place—special
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
09/23/2026B01459582-I1Request digital key ↗
08/21/2026B01230373-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/21/2026B01230373-I1Open ↗
08/13/2026B01230373-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01230373-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/21/2026B01230373-I1Open ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/17/2026B01459582-I1Open ↗
08/21/2026B01230373-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01230373-I1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/13/2026B01230373-I1Open ↗
▸Other Documents3
▸DOB NOWSite Survey: Initial1
08/13/2026B01230373-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01230373-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/21/2026B01230373-I1Open ↗