610 SACKETT STREET
BROOKLYN · BIN 3430363
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
10 Open Violations 8 unresolved · 2 paperwork only ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof6p · 1 filing · 20 docs
Bulkhead5p · 1 filing · 20 docs
Floor 85p · 1 filing · 20 docs
Floor 75p · 1 filing · 20 docs
Floor 66p · 1 filing · 20 docs
Floor 56p · 1 filing · 20 docs
Floor 45p · 1 filing · 20 docs
Floor 3Under Construction5p · 2 filings · 20 docs
Floor 2Under Construction5p · 2 filings · 20 docs
Floor 12p · 1 filing · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
AVDOO PARTNERS DEVELOPMENT2309/15/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRIME PIPING & HEATING INFire Protection308/20/2026
ON STAR MANAGEMENT LLCGeneral Contractor107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161009/09/2026
Building Lifecycle
All (109)Filed (10)Permit Issued (4)Violation (24)Objection (41)Special Inspection (30)
09/09/2026
Filed — New Building
Construct new 8-story mixed use building as per plans filed, which shall contain 26 Market Rate dwelling units and 13 Mandatory Inclusionary Housing dwelling units, with retail space provided on the first floor.
B01278368-P1
09/08/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
09/08/2026
Special inspection requirement — Energy Code Compliance Inspections
09/08/2026
Special inspection requirement — Luminous Exit Path Markings
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Air barrier continuity plan testing
SHAHRIAR QUAYYUM
09/08/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
08/19/2026
Permit issued — Standpipe
B01278368-S7-EW-SD
08/18/2026
Permit issued — Sprinklers
B01278368-S6-EW-SP
08/18/2026
Permit issued — Standpipe
B01278368-S6-EW-SD
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
07/13/2026
Objection resolved — Resolved
07/10/2026
Objection resolved — Open
07/10/2026
Objection resolved — Resolved
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
07/02/2026
Permit issued — Support of Excavation
B01346432-I1-SE
06/23/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SHAHRIAR QUAYYUM
06/23/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
06/23/2026
Special inspection requirement — Luminous Exit Path Markings
SHAHRIAR QUAYYUM
06/05/2026
Objection resolved — Addressed
05/05/2026
Objection resolved — Addressed
05/05/2026
Objection resolved — Addressed
05/04/2026
Objection raised — Hydronic System Controls
05/04/2026
Objection raised — Other
04/28/2026
Objection resolved — Addressed
04/15/2026
Special inspection requirement — Structural Steel - High Strength Bolting
SHAHRIAR QUAYYUM
04/15/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GEORGE CAMBOURAKIS
04/15/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
04/15/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
04/10/2026
Objection resolved — Addressed
04/09/2026
Filed — New Building
Construct new 8-story mixed use building as per plans filed, which shall contain 26 Market Rate dwelling units and 13 Mandatory Inclusionary Housing dwelling units, with retail space provided on the first floor.
B01278368-S7
04/06/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
SHAHRIAR QUAYYUM
03/19/2026
Objection resolved — Resolved
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
03/13/2026
Objection resolved — Addressed
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
02/11/2026
Objection raised — Structural
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStandpipePermit IssuedPRIME PIPING & HEATING IN08/19/2026
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN08/18/2026
DOB NOWStandpipePermit IssuedPRIME PIPING & HEATING IN08/18/2026
DOB NOWSupport of ExcavationPermit IssuedON STAR MANAGEMENT LLC07/02/2026
1 project · most recent 09/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/09/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NL 36,000 BTU · Condensing Unit ×1
MXZ-SM48NL 48,000 BTU · Condensing Unit ×1
PUZ-AH30NL 30,000 BTU · Condensing Unit ×1
1 project · most recent 09/09/2026
Sprinkler System
FiledStatusContractorScope
09/09/2026Permit IssuedPRIME PIPING & HEATING INSprinkler System
1 project · most recent 09/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/09/2026——Gas, Storm, Water/Sanitary
1 project · most recent 09/09/2026
Concrete
FiledStatusContractorScope
09/09/2026Permit IssuedPRIME PIPING & HEATING INConcrete
1 project · most recent 09/09/2026
Fence
FiledStatusContractorScope
09/09/2026Permit IssuedPRIME PIPING & HEATING INFence
▾Special Inspection Requirements (DOB NOW) — 77
DateRequirementInspectorRole
09/08/2026Air barrier continuity plan testingSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
09/08/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fire-Resistance Rated Construction—progress
09/08/2026Energy Code Compliance Inspections—progress
09/08/2026Luminous Exit Path MarkingsSHAHRIAR QUAYYUMspecial
09/08/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
09/08/2026Wall Panels, Curtain Walls, and VeneersSHAHRIAR QUAYYUMspecial
09/08/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
09/08/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
09/08/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
09/08/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
08/06/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
07/10/2026Energy Code Compliance Inspections—progress
06/23/2026Luminous Exit Path MarkingsSHAHRIAR QUAYYUMspecial
06/23/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
06/23/2026Wall Panels, Curtain Walls, and VeneersSHAHRIAR QUAYYUMspecial
04/15/2026Subsurface Investigations (Borings/Test Pits)GEORGE CAMBOURAKISspecial
04/15/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
04/15/2026Structural Steel - High Strength BoltingSHAHRIAR QUAYYUMspecial
04/15/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
04/06/2026Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
04/06/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/06/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
Latest 25 of 77.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/20/2026B01278368-S1Request digital key ↗
08/20/2026B01278368-I1Request digital key ↗
08/20/2026B01278368-S5Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits2
▸DOB NOWDEP Stormwater Construction Permit2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-S1Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWRestrictive Declaration/Easement 26
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-S1Open ↗
08/20/2026B01278368-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWRestrictive Declaration/Easement 16
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-S1Open ↗
08/20/2026B01278368-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/20/2026B01278368-I1Open ↗
▸Seals & Professional Certifications16
▸DOB NOWDPL-1: Design Professional Seal & Signature11
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
08/20/2026B01278368-S7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/02/2026B01278368-S1Open ↗
09/02/2026B01278368-S1Open ↗
09/01/2026B01346432-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWStandpipe Alarms Drawings1
08/20/2026B01278368-I1—
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/20/2026B01278368-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWOER: Notice to Proceed14
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-S1Open ↗
08/20/2026B01278368-S1Open ↗
Showing 3 of 14 on file for this type
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/20/2026B01278368-S1Open ↗
08/18/2026B01346432-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/20/2026B01278368-S1Open ↗
▸Other Documents8
▸DOB NOWSite Survey: Initial2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗
▸DOB NOWAdjoining Owners Notification2
08/20/2026B01278368-S1Open ↗
08/18/2026B01346432-I1Open ↗
▸DOB NOWProperty Ownership Certification2
09/15/2026B01278368-P1Open ↗
08/20/2026B01278368-I1Open ↗