← Back
BROOKLYN
105 DINSMORE PLACE
BROOKLYN · BIN 3430379
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Roof3p · 1 filing · 16 docs
Bulkhead1p · 1 filing · 16 docs
Floor 112p · 1 filing · 16 docs
Floor 101p · 1 filing · 16 docs
Floor 92p · 1 filing · 16 docs
Floor 81p · 1 filing · 16 docs
Floor 71p · 1 filing · 16 docs
Floor 61p · 1 filing · 16 docs
Floor 51p · 1 filing · 16 docs
Floor 4
Floor 3
Floor 2
Floor 1
Cellar3p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PHIPPS HOUSES309/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
RODNEY D. GIBBLE CONSULTING ENGINEE207/14/2026
SKYLINE ENGINEERING, LLC303/27/2026
DATTNER ARCHITECTS103/25/2026
Building Lifecycle
All (42)Filed (6)Objection (6)Special Inspection (30)
08/18/2026
Objection raised — Other
08/18/2026
Objection raised — Other
07/14/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-S3
07/14/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-S2
04/27/2026
Objection raised — Other
04/20/2026
Objection raised — Other
04/20/2026
Objection raised — Energy
04/20/2026
Objection raised — Energy
03/31/2026
Special inspection requirement — Masonry
03/31/2026
Special inspection requirement — Structural Steel - Details
03/31/2026
Special inspection requirement — Structural Steel - High Strength Bolting
03/31/2026
Special inspection requirement — Structural Steel - Welding
03/27/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-S4
03/27/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-S5
03/27/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-S6
03/27/2026
Special inspection requirement — Post-installed anchors in masonry
03/27/2026
Special inspection requirement — Sprayed fire-resistant materials
03/27/2026
Special inspection requirement — Concrete - Cast-In-Place
03/27/2026
Special inspection requirement — Concrete - Precast
03/27/2026
Special inspection requirement — Concrete – Prestressed
03/27/2026
Special inspection requirement — Post-installed Anchors
03/25/2026
Filed — New Building
Mechanical work as per plans filed
B01332121-I1
03/10/2026
Special inspection requirement — Post-installed Anchors
03/10/2026
Special inspection requirement — Concrete - Cast-In-Place
03/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/10/2026
Special inspection requirement — Subgrade Inspections
03/06/2026
Special inspection requirement — Heating Systems
03/06/2026
Special inspection requirement — Energy Code Compliance Inspections
03/06/2026
Special inspection requirement — Duct leakage testing, insulation and design
03/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
03/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
03/06/2026
Special inspection requirement — Maintenance information
03/06/2026
Special inspection requirement — Shutoff dampers
03/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
03/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/06/2026
Special inspection requirement — Post-installed Anchors
03/02/2026
Special inspection requirement — Air barrier - visual inspection
03/02/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
03/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
03/02/2026
Special inspection requirement — Masonry
03/02/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
03/02/2026
Special inspection requirement — Energy Code Compliance Inspections
Nothing on file for this building.
1 project · most recent 07/14/2026
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/14/2026——Air Conditioning Systems, Ventilation Systems
Cooling
Lg LSU180HSV5 21,600 BTU · Condensing Unit ×1
Ventilation
Swegon GOLD F RX 025 138,000 BTU · Erv ×3
GOLD F RX 011 64,100 BTU · Erv ×2
GOLD F RX 014 109,000 BTU · Erv ×2
GOLD F RX 005 54,600 BTU · Erv ×1
GOLD F RX 012 47,500 BTU · Erv ×1
1 project · most recent 07/14/2026
Sprinkler System
FiledStatusContractorScope
07/14/2026——Sprinkler System
1 project · most recent 07/14/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/14/2026——Storm, Water/Sanitary
1 project · most recent 07/14/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/14/2026——Steel, Concrete, Masonry
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/31/2026Masonry—special
03/31/2026Structural Steel - Details—special
03/31/2026Structural Steel - High Strength Bolting—special
03/31/2026Structural Steel - Welding—special
03/27/2026Post-installed anchors in masonry—special
03/27/2026Sprayed fire-resistant materials—special
03/27/2026Concrete - Cast-In-Place—special
03/27/2026Concrete - Precast—special
03/27/2026Concrete – Prestressed—special
03/27/2026Post-installed Anchors—special
03/10/2026Post-installed Anchors—special
03/10/2026Concrete - Cast-In-Place—special
03/10/2026Subsurface Investigations (Borings/Test Pits)—special
03/10/2026Subgrade Inspections—special
03/06/2026Heating Systems—special
03/06/2026Energy Code Compliance Inspections—progress
03/06/2026Duct leakage testing, insulation and design—energy_progress
03/06/2026HVAC-R and service water piping design and insulation—energy_progress
03/06/2026HVAC-R and service water heating equipment—energy_progress
03/06/2026Maintenance information—energy_progress
03/06/2026Shutoff dampers—energy_progress
03/06/2026HVAC-R and service water heating system controls—energy_progress
03/06/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Post-installed Anchors—special
03/02/2026Air barrier - visual inspection—energy_progress
Latest 25 of 45.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026B01332121-S6Request digital key ↗
08/17/2026B01332121-S8Request digital key ↗
08/17/2026B01332121-S5Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01332121-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01332121-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/17/2026B01332121-S6Open ↗
08/17/2026B01332121-S5Open ↗
08/17/2026B01332121-S8Open ↗
Showing 3 of 8 on file for this type
▸Other Documents2
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01332121-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01332121-I1Open ↗