← Back
Elevator apt, semi-fireproof without stores
1733 BERGEN STREET
BROOKLYN · BIN 3430381
💬 Discuss this project
1950Year Built
25Stories
D1Building Class
R6Zoning
129,082 sfGross Floor Area
184Units
LL97 Covered1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: NYC HOUSING AUTHORITY · 63,254 sf lot · 2.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingCivilGeneral
Roof3p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 152p · 1 filing · 20 docs
Floor 142p · 1 filing · 20 docs
Floor 133p · 1 filing · 20 docs
Floor 123p · 1 filing · 20 docs
Floor 112p · 1 filing · 20 docs
Floor 102p · 1 filing · 20 docs
Floor 92p · 1 filing · 20 docs
Floor 82p · 1 filing · 20 docs
Floor 72p · 1 filing · 20 docs
Floor 62p · 1 filing · 20 docs
Floor 52p · 1 filing · 20 docs
Floor 42p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 13p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
1 job · most recent 04/15/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/15/2026——Heating and Air Conditioning Systems
Heat / Cool
Ephoca APP10N3H1 251,000 BTU · Heat Pump Outdoor ×3
1 job · most recent 04/15/2026
Sprinkler System
FiledStatusContractorScope
04/15/2026——Sprinkler System
1 job · most recent 04/15/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/15/2026——Gas, Storm, Water/Sanitary
1 job · most recent 04/15/2026
Steel Concrete
FiledStatusContractorScope
04/15/2026——Steel, Concrete
Building Lifecycle
All (95)Filed (9)Objection (56)Special Inspection (30)
04/15/2026
Filed — New Building
INSTALL TEMPORARY DRY STANDPIPE AS PER PLANS FILED, DURING CONSTRUCTION OF RELATED NEW BUILDING #B01290649-I1.
B01290649-S9
04/14/2026
Special inspection requirement — Standpipe Systems
04/13/2026
Objection raised — Fire_Protection
04/13/2026
Objection raised — Other
04/13/2026
Objection raised — Fire_Protection
04/13/2026
Objection raised — Other
04/13/2026
Objection raised — Fire_Protection
04/13/2026
Objection raised — Fire_Protection
04/13/2026
Objection raised — Fire_Protection
04/13/2026
Objection raised — Fire_Protection
04/02/2026
Filed — New Building
INSTALL TEMPORARY DRY STANDPIPE AS PER PLANS FILED, DURING CONSTRUCTION OF RELATED NEW BUILDING #B01290649-I1.
B01290649-S6
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/26/2026
Objection resolved — Resolved
03/25/2026
Filed — New Building
INSTALL TEMPORARY DRY STANDPIPE AS PER PLANS FILED, DURING CONSTRUCTION OF RELATED NEW BUILDING #B01290649-I1.
B01290649-S7
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/24/2026
Objection resolved — Resolved
03/20/2026
Special inspection requirement — Standpipe Systems
03/20/2026
Special inspection requirement — Sprinkler Systems
02/12/2026
Objection resolved — Resolved
02/12/2026
Objection resolved — Resolved
02/12/2026
Objection resolved — Resolved
02/12/2026
Objection resolved — Resolved
01/08/2026
Objection resolved — Addressed
01/08/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Tony Canale
01/06/2026
Objection resolved — Resolved
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Admin
12/29/2025
Objection raised — Structural
12/29/2025
Objection raised — Admin
12/19/2025
Objection raised — Mechanical
12/19/2025
Objection raised — Energy
12/19/2025
Objection raised — Energy
12/19/2025
Objection raised — Plumbing
12/17/2025
Objection raised — Zoning
12/17/2025
Objection raised — Zoning
12/17/2025
Objection raised — Admin
12/17/2025
Objection raised — Structural
12/17/2025
Objection raised — Admin
12/17/2025
Objection raised — Zoning
12/17/2025
Objection raised — Energy
12/17/2025
Objection raised — Zoning
12/17/2025
Objection raised — Admin
12/17/2025
Objection raised — Admin
12/17/2025
Objection raised — Zoning
Latest 60 of 95 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NEW YORK CITY HOUSING AUTHORITY1009/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC404/15/2026
CHRISTOPHER VITOLANO104/02/2026
TYLIN212/11/2025
MUESER RUTLEDGE CONSULTING ENGINEER112/09/2025
MARVEL ARCHITECTS111/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.603/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 43
DateRequirementInspectorRole
04/14/2026Standpipe Systems—special
03/20/2026Standpipe Systems—special
03/20/2026Sprinkler Systems—special
01/08/2026Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
12/09/2025Structural Steel - Welding—special
12/09/2025Subsurface Conditions – Fill Placement & In-Place Density—special
12/09/2025Excavations - Sheeting, Shoring, and Bracing—special
11/20/2025Post-installed Anchors—special
11/20/2025Concrete - Cast-In-Place—special
11/20/2025Structural Steel - Details—special
11/20/2025Structural Steel - High Strength Bolting—special
11/20/2025Structural Steel - Welding—special
11/20/2025Shutoff dampers—energy_progress
10/29/2025Wall Panels, Curtain Walls, and Veneers—special
10/29/2025Energy Code Compliance Inspections—progress
10/29/2025Fire-Resistance Rated Construction—progress
10/29/2025Protection of exposed foundation insulation—energy_progress
10/29/2025Fenestration areas—energy_progress
10/29/2025Air barrier - visual inspection—energy_progress
10/29/2025Fenestration air leakage—energy_progress
10/29/2025Vestibules—energy_progress
10/29/2025Insulation placement and R values—energy_progress
10/29/2025Air barrier continuity plan testing—energy_progress
10/29/2025Fenestration and door U-factor and product ratings—energy_progress
10/29/2025Masonry—special
Latest 25 of 43.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026B01290649-S9Request digital key ↗
08/17/2026B01290649-S6Request digital key ↗
08/15/2026B01290649-S5Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
02/05/2026340923558Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
02/05/2026340923558Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
02/05/2026340923558Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01290649-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01290649-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026B01290649-S3Open ↗
08/17/2026B01290649-I1Open ↗
08/17/2026B01290649-S2Open ↗
Showing 3 of 9 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
02/05/2026340923558Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
02/05/2026340923558Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWStandpipe Alarms Drawings1
08/15/2026B01290649-I1—
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/15/2026B01290649-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/15/2026B01290649-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01290649-S1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026B01290649-S1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/17/2026B01290649-S9Open ↗
08/17/2026B01290649-S6Open ↗
08/15/2026B01290649-S5Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
02/05/2026340923558Open ↗
▸Other Documents2
▸DOB NOWSite Survey: Initial1
08/15/2026B01290649-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01290649-I1Open ↗