| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/06/2026 | — | — | Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems | Cooling Heat / Cool Climatemaster SE006 8,100 BTU · Heat Pump Outdoor ×3 SE024 25,300 BTU · Heat Pump Outdoor ×2 SE036 37,500 BTU · Heat Pump Outdoor ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/06/2026 | — | — | Steel, Concrete |
| Firm | Filings | Most Recent |
|---|---|---|
| GEODESIGN INC. PC | 1 | 05/06/2026 |
| DE NARDIS ENGINEERING, LLC | 2 | 09/05/2025 |
| EP ENGINEERING LLC | 3 | 08/22/2025 |
| MARVEL ARCHITECTS | 1 | 08/06/2025 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/04/2026 | Exterior Insulation and Finish Systems (EIFS) | — | special |
| 05/01/2026 | Air barrier continuity plan testing | — | energy_progress |
| 05/01/2026 | Electrical motors and elevators | — | energy_progress |
| 05/01/2026 | Metering | — | energy_progress |
| 05/01/2026 | Combustible Exterior Wall Coverings | — | special |
| 08/13/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/13/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 08/13/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 08/13/2025 | Energy Code Compliance Inspections | — | progress |
| 08/13/2025 | Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components | — | special |
| 08/13/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 08/13/2025 | Post-installed Anchors | — | special |
| 08/13/2025 | Non Potable Water Systems | — | special |
| 08/13/2025 | High-Pressure Fuel-Gas Piping (Welding) | — | special |
| 08/13/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 08/12/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 08/12/2025 | Post-installed Anchors | — | special |
| 08/06/2025 | Protection of exposed foundation insulation | — | energy_progress |
| 08/06/2025 | Masonry | — | special |
| 08/06/2025 | Sprayed fire-resistant materials | — | special |
| 08/06/2025 | Alternative Materials - OTCR Buildings Bulletin Number | — | special |
| 08/06/2025 | Air barrier — testing | — | energy_progress |
| 08/06/2025 | Vestibules | — | energy_progress |
| 08/06/2025 | Subgrade Inspections | — | special |
| 08/06/2025 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |