Building
162 COVERT STREET
BIN 3430435
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Locations of Work
Mechanical
Cellar1p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ARIAN LLC MANAGEMENT1107/08/2026
OWNERS REP107/08/2026
BUILDERS SOURCE USA104/09/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS SOURCE USA LLCGeneral Contractor807/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor207/08/2026
PIPE SOLUTIONS ADVIS INCPlumbing207/08/2026
FLINT MECHANICAL CORPFire Protection107/08/2026
P & D MECHANICAL CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616502/09/2025
Building Lifecycle
All (120)Filed (9)Permit Issued (15)Signed Off (7)Violation (1)Inspection (7)Objection (64)Special Inspection (17)
05/23/2025
Signed off — Alteration
MH WORK TYPE TO BE FILED IN CONJUNCTION WITH NB APPLICATION#340806042
B00505004-I1
05/09/2025
Signed off — Alteration
PL, SP Work type to be filed in conjunction with NB application#340806042.
B00484020-I1
03/12/2025
Signed off — Alteration
B00513305-I1
03/12/2025
Signed off — Alteration
STRUCTURAL WORK TYPE TO BE FILED IN CONJUNCTION WITH NB APPLICATION 340806042
B00513530-I1
03/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/04/2025
Permit issued — Plumbing
B00484020-I1-EW-SP
02/27/2025
Permit issued — Mechanical Systems
B00505004-I1-MS
02/27/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/27/2025
Special inspection requirement — Final
FAHAD FATEH
02/10/2025
Signed off — Alteration
B00556780-I1
02/09/2025
Filed — Alteration
MH WORK TYPE TO BE FILED IN CONJUNCTION WITH NB APPLICATION#340806042
B00505004-P1
01/10/2025
Special inspection requirement — Final
FAHAD FATEH
01/10/2025
Special inspection requirement — Mechanical Systems
FAHAD FATEH
11/06/2024
Permit issued — Plumbing
B00484020-I1-PL
04/01/2024
Permit issued — Construction Fence
B00556780-I1-FN
12/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
12/04/2023
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00741721-I1
12/04/2023
Signed off — Alteration
B00923581-I1
11/06/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
09/22/2023
Permit issued — Sprinklers
B00484020-I1-EW-SP
09/05/2023
Filed — Alteration
B00923581-I1
09/05/2023
Permit issued — Supported Scaffold
B00923581-I1-SF
08/31/2023
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00741721-P1
08/29/2023
Permit issued — Sidewalk Shed
B00741721-I1-SH
08/10/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/07/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
07/26/2023
Permit issued — Sprinklers
B00484020-I1-PL
03/23/2023
Permit issued — Foundation
B00513305-I1-FO-EA
03/23/2023
Permit issued — Construction Fence
B00556780-I1-FN
03/22/2023
Permit issued — Structural
B00513530-I1-ST
02/15/2023
Permit issued — Structural
B00513530-I1-ST
12/02/2022
Permit issued — Construction Fence
B00556780-I1-FN
05/20/2022
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND OVERHEAD PROTECTION AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE, NO CHANGESS IN USE IN EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00741721-I1
05/20/2022
Permit issued — Sidewalk Shed
B00741721-I1-SH
12/30/2021
Violation issued (ECB, closed)
Construction
12/15/2021
Permit issued — Construction Fence
B00556780-I1-FN
09/02/2021
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/26/2021
Objection raised — Admin
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Admin
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Inspections
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Structural
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Other
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Structural
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Structural
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Structural
07/26/2021
Objection resolved — Addressed
07/26/2021
Objection raised — Structural
07/26/2021
Objection resolved — Addressed
07/20/2021
Filed — Alteration
STRUCTURAL WORK TYPE TO BE FILED IN CONJUNCTION WITH NB APPLICATION 340806042
B00513530-I1
07/14/2021
Filed — Alteration
B00556780-I1
Latest 60 of 120 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBLETSAS P&H CORP03/04/2025
DOB NOWMechanical SystemsSigned-offBUILDERS SOURCE USA LLC02/27/2025
DOB NOWPlumbingSigned-offPIPE SOLUTIONS ADVIS INC11/06/2024
DOB NOWConstruction FenceSigned-offBUILDERS SOURCE USA LLC04/01/2024
DOB NOWSprinklersSigned-offP & D MECHANICAL CORP09/22/2023
DOB NOWSupported ScaffoldSigned-offMANHATTAN D ENTERPRISES09/05/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES08/29/2023
DOB NOWSprinklersSigned-offPIPE SOLUTIONS ADVIS INC07/26/2023
DOB NOWFoundationSigned-offBUILDERS SOURCE USA LLC03/23/2023
DOB NOWConstruction FenceSigned-offBUILDERS SOURCE USA LLC03/23/2023
DOB NOWStructuralSigned-offBUILDERS SOURCE USA LLC03/22/2023
DOB NOWStructuralSigned-offBUILDERS SOURCE USA LLC02/15/2023
DOB NOWConstruction FenceSigned-offBUILDERS SOURCE USA LLC12/02/2022
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES05/20/2022
DOB NOWConstruction FenceSigned-offBUILDERS SOURCE USA LLC12/15/2021
2 projects · most recent 01/29/2024
General Wiring
FiledStatusContractorScope
01/29/2024CompletePOWER DIRECT ELECTRIC INCGeneral Wiring
03/15/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
03/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/06/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/10/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/07/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 17
DateRequirementInspectorRole
02/27/2025Mechanical SystemsFAHAD FATEHspecial
02/27/2025FinalFAHAD FATEHprogress
01/10/2025FinalFAHAD FATEHprogress
01/10/2025Mechanical SystemsFAHAD FATEHspecial
09/02/2021Energy Code Compliance InspectionsFAHAD FATEHprogress
09/02/2021Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/29/2021FinalFAHAD FATEHprogress
04/29/2021Excavations - Sheeting, Shoring, and BracingFAHAD FATEHspecial
04/29/2021Concrete - Cast-In-PlaceFAHAD FATEHspecial
04/29/2021Footing and FoundationFAHAD FATEHprogress
04/29/2021Subgrade InspectionsFAHAD FATEHspecial
03/10/2021HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/10/2021HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/10/2021HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/10/2021Maintenance informationFAHAD FATEHenergy_progress
03/10/2021Sprinkler SystemsFAHAD FATEHspecial
03/10/2021MeteringFAHAD FATEHenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/01/2026B00505004-P1Request digital key ↗
09/01/2026B00513305-I1Request digital key ↗
09/01/2026B00556780-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026B00923581-I1Open ↗
08/13/2026B00513305-I1Open ↗
08/13/2026B00484020-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/29/2026B00505004-P1Open ↗
08/29/2026B00513305-I1Open ↗
08/28/2026B00505004-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/29/2026B00505004-P1Open ↗
08/29/2026B00513305-I1Open ↗
08/28/2026B00505004-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00484020-I1Open ↗
08/13/2026B00505004-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00513305-I1Open ↗