No floor-level scope or drawing coverage on file for this building.
3 jobs · most recent 07/27/2026
Steel Concrete Masonry
FiledStatusContractorScope
07/27/2026——Steel, Concrete, Masonry
07/23/2026——1 scope_items
07/23/2026——Steel, Concrete, Masonry
1 job · most recent 07/23/2026
FiledStatusContractorScope
07/23/2026——8 panels, 3,916 kw
Building Lifecycle
All (4)Filed (4)
07/27/2026
Filed — Alteration
General Construction and Structural modifications as per plans filed herewith. No change in use, egress, or occupancy.
B01435795-I1
07/23/2026
Filed — Alteration
Solar installation as per plans filed herewith. No change in use, egress, or occupancy.
B01389207-I1
07/23/2026
Filed — Alteration CO
General construction and structural modifications as per plans filed herewith. Change in use and occupancy as per Schedule of Occupancy.
B01389197-I1
07/23/2026
Filed — Alteration
BESS installation as per plans filed herewith. No change in use, egress, or occupancy. Filed in conjunction with Alt-CO application B01389197-I1.
B01389201-I1
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering Consultants, G407/27/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
07/24/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/24/2026Masonry—special
07/24/2026Structural Steel - Details—special
07/24/2026Concrete - Cast-In-Place—special
07/24/2026Subgrade Inspections—special
07/23/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/23/2026Post-installed anchors in masonry—special
07/23/2026Masonry—special
07/23/2026Structural Steel - Details—special
07/23/2026Energy Code Compliance Inspections—progress
07/23/2026Air barrier - visual inspection—energy_progress
07/23/2026Exterior lighting power—energy_progress
07/23/2026Lighting controls—energy_progress
07/23/2026Concrete - Cast-In-Place—special
07/23/2026Post-installed Anchors—special
07/23/2026Seismic Isolation Systems—special
07/23/2026Structural Steel - High Strength Bolting—special
07/23/2026Subgrade Inspections—special
07/23/2026Final—progress
07/23/2026Post-installed Anchors—special
04/17/2026Final—progress
04/17/2026Final—progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/16/2026B01389197-I1Request digital key ↗
08/16/2026B01435795-I1Request digital key ↗
08/14/2026B01389207-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/16/2026B01389201-I1Open ↗
08/16/2026B01389207-I1Open ↗
08/16/2026B01389197-I1Open ↗
Showing 3 of 4 on file for this type