← Back
BROOKLYN
37 OAK STREET
BROOKLYN · BIN 3430465
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations 1 unresolved · 1 paperwork only ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof7p · 1 filing · 20 docs
Bulkhead2p · 1 filing · 20 docs
Floor 136p · 1 filing · 20 docs
Floor 121p · 1 filing · 20 docs
Floor 11
Floor 10
Floor 93p · 1 filing · 20 docs
Floor 86p · 1 filing · 20 docs
Floor 75p · 1 filing · 20 docs
Floor 66p · 1 filing · 20 docs
Floor 53p · 1 filing · 20 docs
Floor 4
Floor 31p · 1 filing · 20 docs
Floor 27p · 1 filing · 20 docs
Floor 16p · 1 filing · 20 docs
1 job · most recent 08/06/2026
Heating and Air Conditioning Systems Others
FiledStatusContractorScopeMake / Model / Capacity
08/06/2026——Heating and Air Conditioning Systems, Others
Heat / Cool
1 job · most recent 08/06/2026
Sprinkler System
FiledStatusContractorScope
08/06/2026——Sprinkler System
1 job · most recent 08/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/06/2026——Gas, Storm, Water/Sanitary
1 job · most recent 08/06/2026
Steel Concrete Masonry
FiledStatusContractorScope
08/06/2026——Steel, Concrete, Masonry
Building Lifecycle
All (73)Filed (10)Violation (8)Objection (25)Special Inspection (30)
09/15/2026
Objection raised — Other
08/06/2026
Filed — New Building
Structural work as per plans.
B01312761-S9
07/14/2026
Objection resolved — Open
07/06/2026
Objection resolved — Resolved
06/29/2026
Objection resolved — Resolved
06/16/2026
Objection resolved — Open
06/10/2026
Objection resolved — Resolved
06/10/2026
Special inspection requirement — Vestibules
06/10/2026
Special inspection requirement — Air barrier — testing
05/15/2026
Objection raised — Other
05/14/2026
Special inspection requirement — Heating Systems
05/14/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
05/14/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
05/14/2026
Special inspection requirement — Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components
05/14/2026
Special inspection requirement — Energy Code Compliance Inspections
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2026
Objection raised — Other
05/04/2026
Objection resolved — Resolved
05/04/2026
Special inspection requirement — Shutoff dampers
04/28/2026
Filed — New Building
Structural work as per plans.
B01312761-S8
04/27/2026
Objection resolved — Resolved
04/21/2026
Objection resolved — Addressed
04/17/2026
Objection raised — Other
04/07/2026
Objection resolved — Addressed
04/06/2026
Special inspection requirement — Standpipe Systems
03/20/2026
Filed — New Building
Structural work as per plans.
B01312761-S7
03/16/2026
Objection raised — Other
03/16/2026
Objection raised — Other
03/09/2026
Filed — New Building
Structural work as per plans.
B01312761-S6
03/04/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Jan Cermak
03/04/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
Jan Cermak
02/24/2026
Special inspection requirement — Maintenance information
02/24/2026
Special inspection requirement — Insulation placement and R values
02/24/2026
Special inspection requirement — Metering
02/24/2026
Special inspection requirement — Air barrier - visual inspection
02/24/2026
Special inspection requirement — Fenestration areas
02/24/2026
Special inspection requirement — Duct leakage testing, insulation and design
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/24/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/24/2026
Special inspection requirement — Fenestration air leakage
02/24/2026
Special inspection requirement — Maintenance information
02/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
02/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/24/2026
Special inspection requirement — Interior lighting power
02/24/2026
Special inspection requirement — Electrical motors and elevators
02/24/2026
Special inspection requirement — Lighting controls
02/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
02/19/2026
Objection resolved — Resolved
01/14/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/14/2026
Objection raised — Other
01/07/2026
Objection resolved — Resolved
01/06/2026
Objection raised — Other
12/24/2025
Filed — New Building
Structural work as per plans.
B01312761-S4
12/24/2025
Filed — New Building
Structural work as per plans.
B01312761-S5
12/24/2025
Filed — New Building
Structural work as per plans.
B01312761-S3
12/14/2025
Objection resolved — Addressed
12/10/2025
Objection raised — Other
Latest 60 of 73 events.
▾Design Consultants (Architect / Engineer of Record)
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MUESER RUTLEDGE CONSULTIN977103/09/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 61
DateRequirementInspectorRole
06/10/2026Air barrier — testing —energy_progress
06/10/2026Vestibules—energy_progress
05/14/2026Emergency and Standby Power Systems (Generator)—special
05/14/2026Energy Code Compliance Inspections—progress
05/14/2026Seismic Resistance of Plumbing, Mechanical, Fuel Gas, and Electrical Components—special
05/14/2026Heating Systems—special
05/14/2026Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)—special
05/14/2026Fire-Resistant Penetrations and Joints—special
05/04/2026Shutoff dampers—energy_progress
04/06/2026Standpipe Systems—special
03/04/2026Subsurface Conditions – Fill Placement & In-Place DensityJan Cermakspecial
03/04/2026Excavations - Sheeting, Shoring, and BracingJan Cermakspecial
02/24/2026Air barrier - visual inspection—energy_progress
02/24/2026Insulation placement and R values—energy_progress
02/24/2026Lighting controls—energy_progress
02/24/2026Electrical motors and elevators—energy_progress
02/24/2026HVAC-R and service water heating system controls—energy_progress
02/24/2026Metering—energy_progress
02/24/2026Interior lighting power—energy_progress
02/24/2026HVAC-R and service water heating equipment—energy_progress
02/24/2026Duct leakage testing, insulation and design—energy_progress
02/24/2026Maintenance information—energy_progress
02/24/2026Maintenance information—energy_progress
02/24/2026HVAC-R and service water heating equipment—energy_progress
02/24/2026HVAC-R and service water heating system controls—energy_progress
Latest 25 of 61.
▾Documents — 42 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/19/2026B01312761-S7Request digital key ↗
08/17/2026B01312761-I1Request digital key ↗
08/17/2026B01312761-S7Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸DOB NOWDEP Stormwater Construction Permit2
08/14/2026B01312761-S1Open ↗
08/14/2026B01312761-S6Open ↗
▸DOB NOWDEP Stormwater Maintenance Permit/Notice of Termination1
08/14/2026B01312761-S6Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/17/2026B01312761-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/17/2026B01312761-I1Open ↗
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/17/2026B01312761-S3Open ↗
08/17/2026B01312761-S2Open ↗
08/17/2026B01312761-S1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026B01312761-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026B01312761-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01312761-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/17/2026B01312761-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWOER: Notice to Proceed7
08/17/2026B01312761-I1Open ↗
08/17/2026B01312761-S7Open ↗
08/15/2026B01312761-S4Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026B01312761-I1Open ↗
▸DOB NOWSOIL REPORT1
08/17/2026B01312761-I1Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026B01312761-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/17/2026B01312761-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/17/2026B01312761-I1Open ↗