← Back
BROOKLYN
12030 FLATLANDS AVENUE
BROOKLYN · BIN 3430493
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
StructuralMechanicalPlumbingGeneral
Roof4p · 1 filing · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 141p · 1 filing · 20 docs
Floor 132p · 1 filing · 20 docs
Floor 122p · 1 filing · 20 docs
Floor 113p · 1 filing · 20 docs
Floor 103p · 1 filing · 20 docs
Floor 91p · 1 filing · 20 docs
Floor 81p · 1 filing · 20 docs
Floor 71p · 1 filing · 20 docs
Floor 61p · 1 filing · 20 docs
Floor 51p · 1 filing · 20 docs
Floor 41p · 1 filing · 20 docs
Floor 31p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 12p · 1 filing · 20 docs
Cellar3p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
IUV BUILDING 6 LIHTC OWNER509/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DAGHER ENGINEERING PLLC308/24/2026
MRCE208/14/2026
BOHLER ENGINEERING NY PLLC.206/16/2026
DESIMONE CONSULTING ENGINEERS206/15/2026
SLCE ARCHITECTS106/10/2026
Building Lifecycle
All (10)Filed (10)
08/24/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S6
08/14/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S7
06/16/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-Z1
06/16/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-Z2
06/15/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S2
06/15/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S3
06/15/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S1
06/12/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S4
06/12/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-S5
06/10/2026
Filed — New Building
install temporary dry standpipe alarm system during construction as per plans filed
B01412655-I1
Nothing on file for this building.
1 job · most recent 08/24/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026——Air Conditioning Systems
1 job · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026——Sprinkler System
1 job · most recent 08/24/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/24/2026——Gas, Storm, Water/Sanitary
1 job · most recent 08/24/2026
Concrete
FiledStatusContractorScope
08/24/2026——Concrete
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
08/27/2026Subsurface Investigations (Borings/Test Pits)Tony Canalespecial
06/16/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
06/15/2026Excavations - Sheeting, Shoring, and Bracing—special
06/10/2026Subgrade Inspections—special
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
06/10/2026Maintenance information—energy_progress
06/10/2026Electrical motors and elevators—energy_progress
06/10/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026Fire-Resistant Penetrations and Joints—special
06/10/2026High-Pressure Steam Piping (Welding)—special
06/10/2026Energy Code Compliance Inspections—progress
06/10/2026HVAC-R and service water heating equipment—energy_progress
06/10/2026HVAC-R and service water heating system controls—energy_progress
06/10/2026HVAC-R and service water piping design and insulation—energy_progress
06/10/2026Duct leakage testing, insulation and design—energy_progress
06/10/2026Maintenance information—energy_progress
06/10/2026Shutoff dampers—energy_progress
06/10/2026Concrete - Cast-In-Place—special
06/10/2026Concrete - Cast-In-Place—special
06/10/2026Concrete - Precast—special
06/10/2026Concrete – Prestressed—special
06/10/2026Masonry—special
06/10/2026Post-installed Anchors—special
06/10/2026Structural Steel - Details—special
06/10/2026Structural Steel - High Strength Bolting—special
Latest 25 of 50.
▾Documents — 27 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/16/2026B01412655-S7Request digital key ↗
08/15/2026B01412655-S2Request digital key ↗
08/15/2026B01412655-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026B01412655-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/15/2026B01412655-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/16/2026B01412655-S4Open ↗
08/16/2026B01412655-S7Open ↗
08/16/2026B01412655-S5Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01412655-I1Open ↗
08/14/2026B01412655-Z1Open ↗
▸Other Documents5
▸DOB NOWSite Survey: Initial2
08/15/2026B01412655-I1Open ↗
08/14/2026B01412655-Z1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/15/2026B01412655-I1Open ↗
08/14/2026B01412655-Z1Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026B01412655-I1Open ↗