| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/09/2026 | — | — | Air Conditioning Systems, Ventilation Systems | Cooling Mitsubishi Electric PEFY-M48NMAU-A, PKFY-M06NLMU-A, PEFY-M27NMAU-A 129,000 BTU · Vrf Indoor ×4 MSZ-GX12NL, MSZ-GX06NL, MSZ-GX09NL 23,000 BTU · Fan Coil Indoor ×3 PEAD-AA12NL 12,000 BTU · Vrf Indoor ×1 PEAD-AA36NL 33,000 BTU · Fan Coil Indoor ×1 PKA-AK24NL 24,000 BTU · Fan Coil Indoor ×1 PKA-ALN2L 12,200 BTU · Fan Coil Indoor ×1 PUZ-AK18NL 18,000 BTU · Fan Coil Indoor ×1 Ventilation Greenheck ×6 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | — | — | Gas, Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/09/2026 | — | — | Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| IUV BUILDING 5 LIHTC OWNER | 5 | 09/14/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| DAGHER ENGINEERING PLLC | 4 | 09/09/2026 |
| MRCE | 2 | 08/14/2026 |
| BOHLER ENGINEERING NY PLLC. | 2 | 06/16/2026 |
| DESIMONE CONSULTING ENGINEERS | 2 | 06/15/2026 |
| SLCE ARCHITECTS | 1 | 06/10/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/01/2026 | Exterior lighting power | — | energy_progress |
| 09/01/2026 | Interior lighting power | — | energy_progress |
| 09/01/2026 | Electrical motors and elevators | — | energy_progress |
| 09/01/2026 | Lighting in dwelling units | — | energy_progress |
| 09/01/2026 | Lighting controls | — | energy_progress |
| 09/01/2026 | Metering | — | energy_progress |
| 08/27/2026 | Subsurface Investigations (Borings/Test Pits) | Srinivas Yenamandra | special |
| 06/16/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/15/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/10/2026 | Concrete - Cast-In-Place | — | special |
| 06/10/2026 | Concrete - Precast | — | special |
| 06/10/2026 | Concrete – Prestressed | — | special |
| 06/10/2026 | Masonry | — | special |
| 06/10/2026 | Post-installed Anchors | — | special |
| 06/10/2026 | Structural Steel - Details | — | special |
| 06/10/2026 | Structural Steel - High Strength Bolting | — | special |
| 06/10/2026 | Structural Steel - Welding | — | special |
| 06/10/2026 | Concrete - Cast-In-Place | — | special |
| 06/10/2026 | Energy Code Compliance Inspections | — | progress |
| 06/10/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/10/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 06/10/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/10/2026 | Maintenance information | — | energy_progress |
| 06/10/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/10/2026 | High-Pressure Steam Piping (Welding) | — | special |