237 BARBEY STREET
BROOKLYN · BIN 3430526
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GACE DPC203/17/2026
EP ENGINEERING LLC403/12/2026
MAGNUSSON ARCHITECTURE AND PLANNING103/09/2026
VIKATOS ARCHITECT PC111/14/2018
ROYAL ENGINEERING, P.C104/12/2018
Building Lifecycle
All (17)Filed (9)Objection (8)
05/14/2026
Objection resolved — Resolved
04/21/2026
Objection raised — Other
04/21/2026
Objection raised — Other
04/20/2026
Objection raised — Other
04/20/2026
Objection raised — Other
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Other
04/17/2026
Objection raised — Other
03/17/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S1
03/17/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S2
03/12/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S5
03/12/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S6
03/12/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S4
03/12/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-S7
03/09/2026
Filed — New Building
PROPOSED NEW (13) THIRTEEN STORY, 70 UNITS RESIDENTIAL BUILDING. HUB CONSULTATION CONDUCTED WITH DBC RAMI BITAR ON 3/03/2026
B01362967-I1
11/14/2018
Filed — Alteration
B00091476-I1
04/12/2018
Filed — Alteration
B00034251-I1
Nothing on file for this building.
1 project · most recent 03/17/2026
Air Conditioning Systems Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/17/2026——Air Conditioning Systems, Heating and Air Conditioning Systems, Ventilation Systems
Cooling
Trane MXZ-SM48NL 50,000 BTU · Heat Pump Outdoor ×1
PUZ-AK36NL 36,000 BTU · Heat Pump Outdoor ×1
Heat / Cool
Ice Air RSXC09-DH 7,700 BTU · Ptac ×83
Trane TURYE1203AMM0AN 135,000 BTU · Heat Pump Outdoor ×1
Ventilation
Renewaire HE-3X 1,650 CFM · Erv ×2
HE-6X 3,950 CFM · Erv ×1
1 project · most recent 03/17/2026
Sprinkler System
FiledStatusContractorScope
03/17/2026——Sprinkler System
1 project · most recent 03/17/2026
FiledStatusContractorScope
03/17/2026———
1 project · most recent 03/17/2026
Steel Concrete
FiledStatusContractorScope
03/17/2026——Steel, Concrete
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
03/09/2026Post-installed Anchors—special
03/09/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Concrete - Precast—special
03/06/2026Excavations - Sheeting, Shoring, and Bracing—special
03/06/2026Fire-Resistant Penetrations and Joints—special
03/06/2026Masonry—special
03/06/2026Mastic and Intumescent Fire-resistant Coatings—special
03/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
03/06/2026Subgrade Inspections—special
03/06/2026Wall Panels, Curtain Walls, and Veneers—special
03/06/2026Subsurface Investigations (Borings/Test Pits)—special
03/06/2026Post-installed Anchors—special
03/06/2026Sprayed fire-resistant materials—special
03/06/2026Energy Code Compliance Inspections—progress
03/06/2026Fire-Resistance Rated Construction—progress
03/06/2026Preliminary—progress
03/06/2026Vestibules—energy_progress
03/06/2026Concrete - Cast-In-Place—special
03/06/2026Air barrier continuity plan testing—energy_progress
03/05/2026Fenestration areas—energy_progress
03/05/2026Air barrier - visual inspection—energy_progress
03/05/2026Fenestration air leakage—energy_progress
03/05/2026Insulation placement and R values—energy_progress
03/05/2026Fenestration and door U-factor and product ratings—energy_progress
03/04/2026Structural Steel - High Strength Bolting—special
Latest 25 of 31.
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
09/03/2026B00034251-I1Request digital key ↗
09/02/2026B00091476-I1Request digital key ↗
08/18/2026B01362967-S1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/18/2026B01362967-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/03/2026B00034251-I1Open ↗
09/02/2026B00091476-I1Open ↗
08/18/2026B01362967-S7Open ↗
Showing 3 of 9 on file for this type