← Back
Unlicensed parking lot
153 9 STREET
BROOKLYN · BIN 3800751
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M1-4/R6BZoning
0 sfGross Floor Area
0Units
0 Open ViolationsFDNY Report ↗
Unlicensed parking lot · Owner of record: THE ANGELINA GATTO TRUST · 5,000 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Floor 1Under Construction31p · 1 filing · 20 docs
1 job · most recent 06/22/2026
Air Conditioning Systems Heating Systems Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/22/2026Permit IssuedROGERS DEVELOPERS GRP LLCAir Conditioning Systems, Heating Systems, Others, Ventilation Systems
Cooling
Daikin RXTA24AAVJU 23,000 BTU · Vrf Outdoor ×16
RXTA36AAVJU 34,200 BTU · Vrf Outdoor ×16
Heating
Daikin RXTA24AAVJU 25,800 BTU · Vrf Outdoor ×16
RXTA36AAVJU 37,000 BTU · Vrf Outdoor ×16
Ventilation
Greenheck G-097-VG 200 CFM · Exhaust Fan ×10
Renewaire HE10RT 540 CFM · Erv ×1
Other
Empire TV06G 147 CFM · Exhaust Fan ×1
1 job · most recent 06/22/2026
Sprinkler System
FiledStatusContractorScope
06/22/2026——Sprinkler System
1 job · most recent 06/22/2026
Storm Water/Sanitary
FiledStatusContractorScope
06/22/2026——Storm, Water/Sanitary
3 jobs · most recent 12/08/2025
General Wiring
FiledStatusContractorScope
12/08/2025Permit IssuedHIVOLTS ELECTRICAL INCGeneral Wiring
12/03/2025Permit IssuedPOWER DIRECT ELECTRIC INCGeneral Wiring
12/03/2025Permit IssuedPOWER DIRECT ELECTRIC INC1 meters, 1 new_meters
1 job · most recent 06/22/2026
Concrete
FiledStatusContractorScope
06/22/2026Permit IssuedROGERS DEVELOPERS GRP LLCConcrete
1 job · most recent 06/22/2026
Fence
FiledStatusContractorScope
06/22/2026Permit IssuedROGERS DEVELOPERS GRP LLCFence
Building Lifecycle
All (112)Filed (9)Permit Issued (2)Objection (71)Special Inspection (30)
09/15/2026
Permit issued — Support of Excavation
B01203713-S1-SE
07/28/2026
Permit issued — Construction Fence
B01203713-S7-FN
07/09/2026
Objection resolved — Resolved
06/29/2026
Objection raised — Other
06/22/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S1
06/22/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Subgrade Inspections
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Structural Steel - Welding
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Underpinning and alternate methods of support of buildings and adjacent property
SHAHRIAR QUAYYUM
06/22/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Bin Li
06/22/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
SHAHRIAR QUAYYUM
06/16/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S8
05/27/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S7
05/27/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Other
05/19/2026
Objection raised — Other
05/19/2026
Objection resolved — Addressed
05/06/2026
Objection raised — Other
05/06/2026
Objection raised — Other
05/06/2026
Objection raised — Other
05/06/2026
Objection raised — Other
05/06/2026
Objection raised — Other
05/06/2026
Objection raised — Other
04/28/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S2
04/28/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S3
04/20/2026
Filed — New Building
SUBSEQUENT SPRINKLER APPLICATION FILED HEREWITH.
B01203713-S6
04/16/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
04/16/2026
Special inspection requirement — Deep Foundation Elements
04/16/2026
Special inspection requirement — Subgrade Inspections
04/16/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
04/16/2026
Special inspection requirement — Concrete - Cast-In-Place
04/15/2026
Objection resolved — Addressed
04/15/2026
Objection resolved — Open
04/15/2026
Special inspection requirement — Post-installed Anchors
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
04/14/2026
Objection resolved — Addressed
Latest 60 of 112 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRAVON CAPITAL1109/16/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ELEVATED ENGINEERING NYC306/22/2026
FLEMING LEE SHUE, INC106/16/2026
NA205/27/2026
A&D ENGINEERING, PLLC304/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPEDITING 4 U303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROGERS DEVELOPERS GRP LLCGeneral Contractor209/16/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616106/22/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupport of ExcavationPermit IssuedROGERS DEVELOPERS GRP LLC09/15/2026
DOB NOWConstruction FencePermit IssuedROGERS DEVELOPERS GRP LLC07/28/2026
▾Special Inspection Requirements (DOB NOW) — 55
DateRequirementInspectorRole
06/22/2026Construction Operations Influencing Adjacent StructuresSHAHRIAR QUAYYUMspecial
06/22/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
06/22/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
06/22/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
06/22/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
06/22/2026Underpinning and alternate methods of support of buildings and adjacent propertySHAHRIAR QUAYYUMspecial
06/22/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
06/22/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
04/16/2026Subsurface Investigations (Borings/Test Pits)—special
04/16/2026Deep Foundation Elements—special
04/16/2026Subgrade Inspections—special
04/16/2026Construction Operations Influencing Adjacent Structures—special
04/16/2026Concrete - Cast-In-Place—special
04/15/2026Post-installed Anchors—special
04/15/2026Fire-Resistant Penetrations and Joints—special
03/02/2026HVAC-R and service water heating equipment—energy_progress
03/02/2026Final—progress
03/02/2026Energy Code Compliance Inspections—progress
03/02/2026Fire-Resistance Rated Construction—progress
03/02/2026Duct leakage testing, insulation and design—energy_progress
03/02/2026HVAC-R and service water heating system controls—energy_progress
03/02/2026Maintenance information—energy_progress
03/02/2026HVAC-R and service water piping design and insulation—energy_progress
03/02/2026Shutoff dampers—energy_progress
03/02/2026HVAC-R and service water heating equipment—energy_progress
Latest 25 of 55.
▾Documents — 28 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/16/2026B01203713-S2Contact architect ↗
08/16/2026B01203713-I1Contact architect ↗
08/16/2026B01203713-S8Contact architect ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01203713-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01203713-I1Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/16/2026B01203713-S7Open ↗
08/16/2026B01203713-S6Open ↗
08/16/2026B01203713-S5Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B01203713-S1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/16/2026B01203713-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/16/2026B01203713-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWOER: Notice to Proceed1
08/16/2026B01203713-S1Open ↗
▸Inspections & Test Reports1
▸DOB NOWSOIL REPORT1
08/16/2026B01203713-S1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/16/2026B01203713-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/16/2026B01203713-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01203713-I1Open ↗