| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/12/2026 | — | — | Heating and Air Conditioning Systems, Heating Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/12/2026 | — | — | Concrete, Masonry |
| Owner | Filings | Most Recent |
|---|---|---|
| STOCKVIEW HOLDINGS | 6 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| TITAN ENGINEERS PC | 4 | 05/12/2026 |
| VASILIOS ARTEMIOU PE | 2 | 03/10/2026 |
| NY BUILDING ASSOCIATES INC | 1 | 07/30/2025 |
| Representative | Filings | Most Recent |
|---|---|---|
| ADVANCED BUILDERS SERVICES | 10 | 03/21/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/21/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 04/14/2026 | Final | — | progress |
| 04/14/2026 | Footing and Foundation | — | progress |
| 02/17/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 02/17/2026 | Structural Cold-Formed Steel | — | special |
| 02/17/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 02/17/2026 | Masonry | — | special |
| 02/17/2026 | Post-installed Anchors | — | special |
| 02/17/2026 | Structural Steel - Details | — | special |
| 02/17/2026 | Structural Steel - High Strength Bolting | — | special |
| 02/17/2026 | Structural Steel - Welding | — | special |
| 02/17/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 09/11/2025 | HVAC-R and service water heating equipment | — | energy_progress |
| 09/11/2025 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 09/11/2025 | Maintenance information | — | energy_progress |
| 09/11/2025 | Energy Code Compliance Inspections | — | progress |
| 09/11/2025 | HVAC-R and service water heating system controls | — | energy_progress |
| 08/20/2025 | Post-installed Anchors | — | special |
| 08/20/2025 | Fire-Resistant Penetrations and Joints | — | special |
| 07/30/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 07/30/2025 | Structural Stability – Alterations of existing buildings | — | special |
| 05/22/2025 | Sprinkler Systems | — | special |
| 05/22/2025 | Final | — | progress |