BROOKLYN
69 KINGSLAND AVENUE
BROOKLYN · BIN 3820221
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureMechanical
Roof20p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Cellar25p · 1 filing · 20 docs
Sub-Basement6p · 1 filing · 20 docs
1 job · most recent 08/28/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/28/2025Permit IssuedKALE CONSTRUCTION INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot Tosot TWH36QF25B4DI 33,600 BTU · Ahu ×12
Tosot TWH36QF25B4DO 36,254 BTU · Condensing Unit ×12
Mitsubishi Electric Mitsubishi MSZ-GL24NA 2 tons · Ahu ×4
Mitsubishi MXZ-SM48NAM2 4 tons · Condensing Unit ×2
Ventilation
Dayton Dayton 56JN95 5,312 CFM · Exhaust Fan ×6
Econ-Air Econ Air EA2-D.250.20D 4,250 CFM · Makeup Air ×6
Accurex Accurex XCUBE-220-20 5,312 CFM · Exhaust Fan ×1
XDGX-P116-H12-MF 4,250 CFM · Makeup Air ×1
1 job · most recent 08/28/2025
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/28/2025Signed-offXH&RC PLBG AND HTG INCGas, Plumbing-Sprinkler, Water/Sanitary
1 job · most recent 04/18/2026
General Wiring
FiledStatusContractorScope
04/18/2026CompleteNY FOREVER ELECTRIC LLCGeneral Wiring
Building Lifecycle
All (82)Filed (9)Permit Issued (4)Inspection (5)Objection (34)Special Inspection (30)
09/16/2025
Special inspection requirement — HVAC-R and service water heating equipment
Raimundo Ramos
09/16/2025
Special inspection requirement — HVAC-R and service water heating system controls
Raimundo Ramos
09/16/2025
Special inspection requirement — Energy Code Compliance Inspections
Raimundo Ramos
09/16/2025
Special inspection requirement — Maintenance information
Raimundo Ramos
09/16/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Raimundo Ramos
09/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
09/09/2025
Objection resolved — Addressed
09/09/2025
Objection resolved — Addressed
09/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Raimundo Ramos
09/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Raimundo Ramos
09/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Raimundo Ramos
09/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
09/05/2025
Special inspection requirement — Final
Raimundo Ramos
09/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Raimundo Ramos
09/05/2025
Special inspection requirement — Maintenance information
Raimundo Ramos
09/05/2025
Special inspection requirement — Shutoff dampers
Raimundo Ramos
09/05/2025
Special inspection requirement — Mechanical Systems
Raimundo Ramos
08/29/2025
Objection raised — Scope
08/29/2025
Objection raised — Scope
08/28/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P6
08/24/2025
Special inspection requirement — Shutoff dampers
Michael Tobias
08/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Tobias
08/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Tobias
08/24/2025
Special inspection requirement — Final
Michael Tobias
08/24/2025
Special inspection requirement — Maintenance information
Michael Tobias
08/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Tobias
08/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Cortney Walleston
08/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Tobias
08/24/2025
Special inspection requirement — Mechanical Systems
Michael Tobias
08/22/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P5
08/13/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/04/2025
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
07/14/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P4
07/14/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P3
07/09/2025
Special inspection requirement — Final
Michael Tobias
07/09/2025
Special inspection requirement — Mechanical Systems
Michael Tobias
07/09/2025
Special inspection requirement — Energy Code Compliance Inspections
Michael Tobias
07/09/2025
Special inspection requirement — Shutoff dampers
Michael Tobias
07/09/2025
Special inspection requirement — Maintenance information
Michael Tobias
07/09/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Tobias
06/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2025
Objection raised — Scope
05/05/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
05/02/2025
Objection resolved — Addressed
04/30/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P2
04/30/2025
Objection raised — Cost
04/30/2025
Objection raised — Scope
04/25/2025
Objection raised — Scope
04/23/2025
Filed — Alteration
REPLACED MECHANICAL SYSTEM TO FOR THE PROPOSED ALTERATION AND ARCHITECTURAL LAYOUT.INSTALATION OF COMMERCIAL COOKING KITCHEN AND VENTILATION SYSTEM (FIRST FLOOR)
B01132869-P1
04/17/2025
Permit issued — General Construction
B01132869-I1-GC
04/17/2025
Permit issued — Mechanical Systems
B01132869-S2-MS
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/27/2025
Permit issued — Plumbing
B01132869-S1-PL
01/21/2025
Permit issued — General Construction
B01132869-I1-GC
01/06/2025
Objection resolved — Addressed
01/03/2025
Objection resolved — Addressed
12/20/2024
Objection resolved — Addressed
Latest 60 of 82 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2THE8S1407/08/2026
AMMAZZA DELI LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VILLA PEX CONSULTING ENGINEERING708/28/2025
CORTNEY WALLESTON ARCHITECT, PC204/23/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SION CONSULTING ENGINEERING1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor204/08/2026
NY FOREVER ELECTRIC LLCElectrical103/22/2026
MON-RAD INCGeneral Contractor107/08/2026
XH&RC PLBG AND HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CORTNEY WALLESTON ARCHITE3881908/28/2025
NEW YORK ENGINEERS, P.C.3868308/28/2025
MB INSPECTIONS, CORP.8703104/30/2025
DOWNTOWN ENGINEERS9711111/26/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedKALE CONSTRUCTION INC04/17/2025
DOB NOWMechanical SystemsPermit IssuedKALE CONSTRUCTION INC04/17/2025
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/27/2025
DOB NOWGeneral ConstructionPermit IssuedMON-RAD INC01/21/2025
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/13/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/04/2025Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
06/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/09/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
09/16/2025Fire-Resistant Penetrations and JointsCortney Wallestonspecial
09/16/2025HVAC-R and service water piping design and insulationRaimundo Ramosenergy_progress
09/16/2025HVAC-R and service water heating equipmentRaimundo Ramosenergy_progress
09/16/2025HVAC-R and service water heating system controlsRaimundo Ramosenergy_progress
09/16/2025Maintenance informationRaimundo Ramosenergy_progress
09/16/2025Energy Code Compliance InspectionsRaimundo Ramosprogress
09/05/2025FinalRaimundo Ramosprogress
09/05/2025Shutoff dampersRaimundo Ramosenergy_progress
09/05/2025Maintenance informationRaimundo Ramosenergy_progress
09/05/2025HVAC-R and service water piping design and insulationRaimundo Ramosenergy_progress
09/05/2025HVAC-R and service water heating equipmentRaimundo Ramosenergy_progress
09/05/2025HVAC-R and service water heating system controlsRaimundo Ramosenergy_progress
09/05/2025Energy Code Compliance InspectionsRaimundo Ramosprogress
09/05/2025Fire-Resistant Penetrations and JointsCortney Wallestonspecial
09/05/2025Mechanical SystemsRaimundo Ramosspecial
08/24/2025Fire-Resistant Penetrations and JointsCortney Wallestonspecial
08/24/2025HVAC-R and service water heating system controlsMichael Tobiasenergy_progress
08/24/2025HVAC-R and service water heating equipmentMichael Tobiasenergy_progress
08/24/2025Shutoff dampersMichael Tobiasenergy_progress
08/24/2025HVAC-R and service water piping design and insulationMichael Tobiasenergy_progress
08/24/2025Maintenance informationMichael Tobiasenergy_progress
08/24/2025FinalMichael Tobiasprogress
08/24/2025Energy Code Compliance InspectionsMichael Tobiasprogress
08/24/2025Mechanical SystemsMichael Tobiasspecial
07/09/2025Maintenance informationMichael Tobiasenergy_progress
Latest 25 of 71.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/21/2026B01132869-S1Request digital key ↗
08/21/2026B01132869-S2Request digital key ↗
08/21/2026B01132869-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026B01132869-P4Open ↗
09/02/2026B01132869-P4Open ↗
09/02/2026B01132869-P4Open ↗
Showing 3 of 36 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026B01132869-P4Open ↗
09/02/2026B01132869-P4Open ↗
09/02/2026B01132869-P3Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/21/2026B01132869-I1Open ↗
08/21/2026B01132869-S1Open ↗
08/21/2026B01132869-S2Open ↗
Showing 3 of 9 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/21/2026B01132869-P6Open ↗
08/21/2026B01132869-S1Open ↗
08/21/2026B01132869-S2Open ↗
Showing 3 of 9 on file for this type