| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 07/27/2026 | — | — | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Heat Pump Outdoor ×74 MXZ-SM48NLHZ 48,000 BTU · Heat Pump Outdoor ×3 PUZ-AH24NL 28,000 BTU · Heat Pump Outdoor ×1 Ventilation Greenheck USF-8 1,350 CFM · Kitchen Exhaust ×3 AX-54-190-0415 6,000 CFM · Exhaust Fan ×2 SQ-98-VG 500 CFM · Exhaust Fan ×2 SQ-99-VG 1,050 CFM · Exhaust Fan ×2 GB-160HP 1,425 CFM · Kitchen Exhaust ×1 HE-20RT 1,800 CFM · Erv ×1 SQ-9-VG 1,000 CFM · Exhaust Fan ×1 USF-4 525 CFM · Exhaust Fan ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | — | — | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | — | — | Storm, Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 07/27/2026 | — | — | Concrete |
| Owner | Filings | Most Recent |
|---|---|---|
| ROSE SHEPHERD MANAGEMENT | 2 | 09/22/2026 |
| GOULD REALTY, LLC | 1 | 08/29/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| ALL CITY ENGINEERING P.C. | 3 | 07/27/2026 |
| WEXLER ASSOCIATES | 3 | 07/27/2026 |
| STUDIOSC ARCHITECTURE PLLC | 1 | 06/01/2026 |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/06/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 08/06/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 07/24/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 07/24/2026 | Structural Steel - Welding | — | special |
| 07/24/2026 | Structural Steel - Details | — | special |
| 07/24/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 07/24/2026 | Construction Operations Influencing Adjacent Structures | — | special |
| 06/24/2026 | Subgrade Inspections | — | special |
| 06/24/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 06/24/2026 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/12/2026 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/12/2026 | Concrete - Cast-In-Place | — | special |
| 06/12/2026 | Post-installed Anchors | — | special |
| 06/12/2026 | Subgrade Inspections | — | special |
| 06/12/2026 | Subsurface Conditions – Fill Placement & In-Place Density | — | special |
| 06/12/2026 | Final | — | progress |
| 06/12/2026 | Footing and Foundation | — | progress |
| 06/12/2026 | Concrete - Cast-In-Place | — | special |
| 06/12/2026 | Post-installed Anchors | — | special |
| 06/12/2026 | Final | — | progress |
| 06/08/2026 | Exhaust and Vent Systems in Plenums and Ducts | — | special |
| 06/08/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 06/08/2026 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | — | special |
| 06/08/2026 | Energy Code Compliance Inspections | — | progress |
| 06/08/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |