| Firm | Filings | Most Recent |
|---|---|---|
| HANSA BUILDING ENGINEERING SERVICES | 2 | 02/02/2026 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/02/2026 | — | — | Steel, Concrete, Masonry |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/02/2026 | — | — | Fence |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 12/27/2022 | Air barrier — testing | SHAHRIAR QUAYYUM | energy_progress |
| 06/06/2022 | Structural Cold-Formed Steel | — | special |
| 06/06/2022 | Structural Steel - Details | — | special |
| 06/06/2022 | Concrete - Cast-In-Place | — | special |
| 06/06/2022 | Excavations - Sheeting, Shoring, and Bracing | — | special |
| 06/06/2022 | Fire-Resistant Penetrations and Joints | — | special |
| 06/06/2022 | Masonry | — | special |
| 06/06/2022 | Subgrade Inspections | — | special |
| 06/06/2022 | Energy Code Compliance Inspections | — | progress |
| 06/06/2022 | Fire-Resistance Rated Construction | — | progress |
| 06/06/2022 | Final | — | progress |
| 06/06/2022 | Footing and Foundation | — | progress |
| 06/06/2022 | Metering | — | energy_progress |
| 06/06/2022 | Air barrier - visual inspection | — | energy_progress |
| 06/06/2022 | Insulation placement and R values | — | energy_progress |
| 06/06/2022 | Permanent certificate | — | energy_progress |
| 06/06/2022 | Fenestration air leakage | — | energy_progress |
| 06/06/2022 | Fenestration areas | — | energy_progress |
| 06/06/2022 | Protection of exposed foundation insulation | — | energy_progress |
| 06/06/2022 | Fenestration and door U-factor and product ratings | — | energy_progress |
| 06/06/2022 | HVAC-R and service water heating system controls | — | energy_progress |
| 06/06/2022 | Interior lighting power | — | energy_progress |
| 06/06/2022 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 06/06/2022 | Subsurface Investigations (Borings/Test Pits) | — | special |
| 06/06/2022 | Maintenance information | — | energy_progress |