← Back
Unlicensed parking lot
131 HARRISON AVENUE
BROOKLYN · BIN 3846379
💬 Discuss this project
0Year Built
—Stories
G7Building Class
R6AZoning
0 sfGross Floor Area
0Units
Unlicensed parking lot · Owner of record: 131 HARRISON LLC · 2,255 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralGeneral
Roof2p · 1 filing · 8 docs
Floor 31p · 1 filing · 8 docs
Floor 21p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar3p · 1 filing · 8 docs
1 job · most recent 03/11/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/11/2026——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Trane MXZ-SM48NL 48,000 BTU · Heat Pump Outdoor ×3
MXZ-SM60NL 60,000 BTU · Vrf Outdoor ×3
Heating
Trane MXZ-SM48NL 50,000 BTU · Heat Pump Outdoor ×3
MXZ-SM60NL 66,000 BTU · Vrf Outdoor ×3
Ventilation
Greenheck G-120-VG 125 CFM · Exhaust Fan ×2
1 job · most recent 03/11/2026
Sprinkler System
FiledStatusContractorScope
03/11/2026——Sprinkler System
1 job · most recent 03/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/11/2026——Storm, Water/Sanitary
1 job · most recent 12/19/2025
FiledStatusContractorScope
12/19/2025Permit IssuedSPARK ELECTRICAL SVCS LLC3 meters, 3 new_meters
1 job · most recent 03/11/2026
Steel Concrete Masonry
FiledStatusContractorScope
03/11/2026——Steel, Concrete, Masonry
1 job · most recent 03/11/2026
Fence
FiledStatusContractorScope
03/11/2026——Fence
Building Lifecycle
All (96)Filed (9)Objection (57)Special Inspection (30)
09/18/2026
Objection resolved — Resolved
09/18/2026
Objection resolved — Resolved
09/16/2026
Objection raised — Other
09/16/2026
Objection raised — Admin
07/31/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/30/2026
Objection resolved — Addressed
07/27/2026
Objection resolved — Resolved
07/21/2026
Objection raised — Other
07/21/2026
Objection raised — Other
07/21/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/17/2026
Objection raised — Other
07/01/2026
Filed — New Building
PROPOSED THREE (3) STORY AND CELLAR MIXED-USE NEW BUILDING WITH DWELLING UNIT, COMMERCIAL & COMMUNITY FACILITY PROPOSED.
B01411028-I1
06/03/2026
Special inspection requirement — Lighting in dwelling units
06/03/2026
Special inspection requirement — Air barrier - visual inspection
06/03/2026
Special inspection requirement — Exterior lighting power
06/03/2026
Special inspection requirement — Lighting controls
06/03/2026
Special inspection requirement — Fenestration areas
06/03/2026
Special inspection requirement — Protection of exposed foundation insulation
06/03/2026
Special inspection requirement — Metering
06/03/2026
Special inspection requirement — Interior lighting power
06/03/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
06/03/2026
Special inspection requirement — Maintenance information
06/03/2026
Special inspection requirement — Fire-Resistance Rated Construction
06/03/2026
Special inspection requirement — Energy Code Compliance Inspections
06/03/2026
Special inspection requirement — Subgrade Inspections
06/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/03/2026
Special inspection requirement — Fenestration air leakage
06/03/2026
Special inspection requirement — Insulation placement and R values
04/24/2026
Objection raised — Other
04/22/2026
Objection raised — Admin
04/22/2026
Objection raised — Admin
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Objection resolved — Addressed
04/13/2026
Special inspection requirement — Post-installed Anchors
03/30/2026
Objection raised — Structural
03/30/2026
Objection raised — Other
03/30/2026
Objection raised — Inspections
03/30/2026
Objection raised — Scope
03/30/2026
Objection raised — Zoning
03/30/2026
Objection raised — Fire_Protection
03/30/2026
Objection raised — Admin
03/30/2026
Objection raised — Other
03/30/2026
Objection raised — Other
03/30/2026
Objection raised — Other
03/30/2026
Objection raised — Energy
03/30/2026
Objection raised — Scope
03/30/2026
Objection raised — Inspections
03/30/2026
Objection raised — Inspections
03/30/2026
Objection raised — Scope
Latest 60 of 96 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
131 HARRISON1603/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMR OUDA107/01/2026
SOLHJOU ENGINEERING PLLC303/11/2026
KNF SERVICES CORP103/05/2026
R & O ENGINEERING302/16/2026
YOEL ROZENBERG112/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BAC Developers Group803/21/2026
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
06/03/2026Lighting in dwelling units—energy_progress
06/03/2026Air barrier - visual inspection—energy_progress
06/03/2026Exterior lighting power—energy_progress
06/03/2026Lighting controls—energy_progress
06/03/2026Fenestration areas—energy_progress
06/03/2026Protection of exposed foundation insulation—energy_progress
06/03/2026Metering—energy_progress
06/03/2026Interior lighting power—energy_progress
06/03/2026Fenestration and door U-factor and product ratings—energy_progress
06/03/2026Maintenance information—energy_progress
06/03/2026Fire-Resistance Rated Construction—progress
06/03/2026Energy Code Compliance Inspections—progress
06/03/2026Subgrade Inspections—special
06/03/2026Fire-Resistant Penetrations and Joints—special
06/03/2026Fenestration air leakage—energy_progress
06/03/2026Insulation placement and R values—energy_progress
04/13/2026Post-installed Anchors—special
03/11/2026Fire-Resistant Penetrations and Joints—special
03/10/2026HVAC-R and service water heating system controls—energy_progress
03/10/2026Fire-Resistant Penetrations and Joints—special
03/10/2026Energy Code Compliance Inspections—progress
03/10/2026HVAC-R and service water heating equipment—energy_progress
03/10/2026HVAC-R and service water heating system controls—energy_progress
03/10/2026HVAC-R and service water piping design and insulation—energy_progress
03/10/2026Duct leakage testing, insulation and design—energy_progress
Latest 25 of 53.
▾Documents — 33 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026B01327124-S4Request digital key ↗
08/16/2026B01411028-I1Request digital key ↗
08/15/2026B01327124-S6Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/15/2026B01327124-I1Open ↗
08/14/2026B01411028-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/15/2026B01327124-I1Open ↗
08/14/2026B01411028-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026B01327124-S5Open ↗
08/19/2026B01327124-I1Open ↗
08/19/2026B01327124-S1Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/15/2026B01327124-I1Open ↗
08/14/2026B01411028-I1Open ↗
▸Inspections & Test Reports4
▸DOB NOWTR4 Test Report and Plot Diagram2
08/15/2026B01327124-S2Open ↗
08/15/2026B01327124-S1Open ↗
▸DOB NOWSOIL REPORT2
08/15/2026B01327124-S2Open ↗
08/15/2026B01327124-S1Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/15/2026B01327124-I1Open ↗
08/14/2026B01411028-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/15/2026B01327124-I1Open ↗
08/14/2026B01411028-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/15/2026B01327124-I1Open ↗