← Back
Unlicensed parking lot
88 HAVEMEYER STREET
BROOKLYN · BIN 3852513
💬 Discuss this project
0Year Built
—Stories
G7Building Class
M1-2/R6AZoning
0 sfGross Floor Area
0Units
1 Open Violation 0 unresolved · 1 paperwork only ▸FDNY Report ↗
Unlicensed parking lot · Owner of record: HAVEM LLC · 1,113 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Roof5p · 1 filing · 20 docs
Bulkhead4p · 1 filing · 20 docs
Floor 67p · 1 filing · 20 docs
Floor 55p · 1 filing · 20 docs
Floor 43p · 1 filing · 20 docs
Floor 33p · 1 filing · 20 docs
Floor 26p · 1 filing · 20 docs
Floor 18p · 2 filings · 20 docs
Cellar5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HAVEM LLC409/13/2026
MARRIA LLC MATTA LLC METTIS904/21/2026
OWNER OF 88 HAVEMEYER ST103/22/2026
OWNER OF HAVEMEYER STREET103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BMB BUILDING CONSULTING803/21/2026
Building Lifecycle
All (112)Filed (9)Violation (2)Objection (71)Special Inspection (30)
08/21/2026
Objection resolved — Resolved
08/03/2026
Filed — New Building
PROPOSE SUBSEQUENT SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB GC JOB #B01334385-I1 FOR 6-STORY WITH CELLAR RESIDENTIAL BUILDING
B01334385-P1
07/31/2026
Objection raised — Other
07/23/2026
Special inspection requirement — Maintenance information
07/22/2026
Objection resolved — Addressed
07/21/2026
Objection resolved — Resolved
07/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
07/17/2026
Special inspection requirement — Post-installed Anchors
07/16/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/24/2026
Objection resolved — Addressed
06/24/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
06/24/2026
Special inspection requirement — Structural Steel - Welding
06/24/2026
Special inspection requirement — Subgrade Inspections
06/24/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
06/24/2026
Special inspection requirement — Concrete - Cast-In-Place
06/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/24/2026
Special inspection requirement — Post-installed Anchors
06/24/2026
Special inspection requirement — Structural Steel - Details
06/23/2026
Objection resolved — Addressed
06/23/2026
Objection resolved — Addressed
06/18/2026
Objection resolved — Addressed
06/17/2026
Objection raised — Cost
06/09/2026
Objection raised — Other
06/01/2026
Filed — Alteration
PROPOSED EXTERIOR DEMO WORK TO RESOLVE ECB VIOLATION# 34394364R, REMOVAL ASPHALT PARK PAD, STEEL POST, METAL CHAIN LINK FENCE AND GATE. NO CHANGE IN USE, EGRESS AND OCCUPANCY.
B01403848-I1
05/27/2026
Objection resolved — Addressed
05/19/2026
Objection resolved — Addressed
05/18/2026
Objection resolved — Addressed
05/18/2026
Special inspection requirement — Final
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Objection resolved — Addressed
05/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
05/07/2026
Objection raised — Other
04/22/2026
Objection raised — Inspections
04/22/2026
Objection raised — Structural
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Scope
04/22/2026
Objection raised — Scope
04/22/2026
Objection resolved — Resolved
04/22/2026
Objection raised — Admin
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Structural
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Admin
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Admin
04/22/2026
Objection raised — Other
04/22/2026
Objection raised — Structural
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Admin
04/22/2026
Objection raised — Structural
04/22/2026
Objection resolved — Addressed
04/22/2026
Objection raised — Structural
04/17/2026
Objection raised — Other
04/17/2026
Objection resolved — Addressed
04/13/2026
Filed — New Building
PROPOSE SUBSEQUENT SUPPORT OF EXCAVATION WORK FILED IN CONJUNCTION WITH NB GC JOB #B01334385-I1 FOR 6-STORY WITH CELLAR RESIDENTIAL BUILDING
B01334385-S6
Latest 60 of 112 events.
Nothing on file for this building.
1 project · most recent 08/03/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/03/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Lg ZRUN024GSS0 27,000 BTU · Vrf Outdoor ×4
ZRUM036GSS0 42,000 BTU · Vrf Outdoor ×2
Ventilation
Ice Air VXC-112-PH-7A-1-A2 2,200 CFM · Heat Pump Outdoor ×1
1 project · most recent 08/03/2026
Sprinkler System
FiledStatusContractorScope
08/03/2026——Sprinkler System
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026———
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026——4 scope_items
1 project · most recent 08/03/2026
Fence
FiledStatusContractorScope
08/03/2026——Fence
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
07/23/2026Maintenance information—energy_progress
07/17/2026Fire-Resistance Rated Construction—progress
07/17/2026Post-installed Anchors—special
06/24/2026Subsurface Investigations (Borings/Test Pits)—special
06/24/2026Structural Steel - Welding—special
06/24/2026Subgrade Inspections—special
06/24/2026Subsurface Conditions – Fill Placement & In-Place Density—special
06/24/2026Concrete - Cast-In-Place—special
06/24/2026Excavations - Sheeting, Shoring, and Bracing—special
06/24/2026Post-installed Anchors—special
06/24/2026Structural Steel - Details—special
05/18/2026Final—progress
05/14/2026Fire-Resistant Penetrations and Joints—special
03/27/2026Concrete - Cast-In-Place—special
03/26/2026Lighting controls—energy_progress
03/26/2026Wall Panels, Curtain Walls, and Veneers—special
03/26/2026Air barrier continuity plan testing—energy_progress
03/16/2026Footing and Foundation—progress
03/16/2026Final—progress
12/22/2025HVAC-R and service water piping design and insulation—energy_progress
12/22/2025HVAC-R and service water heating equipment—energy_progress
12/22/2025Fire-Resistant Penetrations and Joints—special
12/22/2025HVAC-R and service water heating system controls—energy_progress
12/19/2025Maintenance information—energy_progress
12/19/2025HVAC-R and service water heating equipment—energy_progress
Latest 25 of 48.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/17/2026B01334385-P1Request digital key ↗
08/17/2026B01334385-S5Request digital key ↗
08/17/2026B01334385-S4Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZoning Exhibit form (1-5)2
08/17/2026B01334385-I1Open ↗
08/13/2026B01334385-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01334385-I1Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026B01334385-I1Open ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/17/2026B01334385-P1Open ↗
08/17/2026B01334385-S5Open ↗
08/17/2026B01334385-S4Open ↗
Showing 3 of 9 on file for this type
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/17/2026B01334385-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01334385-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01334385-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/17/2026B01334385-S6Open ↗
08/17/2026B01334385-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/17/2026B01334385-S6Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification1
08/17/2026B01334385-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026B01334385-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026B01334385-I1Open ↗