DOB06/09/2026EMERGENCY WORK ORDER.THE BLDG SFFRD FIRE DMG ON/AROUND 6/8/26.FIRE DMGS ARE LOCALZD ON FRNT HALF OF THE BLDG W/SEVERELY FIRE DMGD 2NDFL COLUMNS&ROOF JOISTS.WNDW&ROOF OPENINGS ARE SEALED.FIRE DBR.OWNR TO RTAIN NYSPE&DEMO ENDRSD GC&ABSESTOS GC TO IMMED 1.NYSPE TO SBMT MEANS& METHDSFOR TEMP SHORNG,SELECTIVE DEMO
DOB06/09/2026FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FIRE DMG ON/AROUND 6/8/26.FIRE DMGS ARE LOCALZD ON FRNT HALF OF THE BLDG W/ SEVERELY FIRE DMGS 2NDFL COLUMNS&ROOF JOISTS.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB.2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 7/20/26
DOB06/08/2026STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT 2ND FLOOR, CHARRING OF WOOD JOIST, CEILING OPEN IN SEVERAL ROOMS, SKYLIGHTS MISSING GLASS AND MULTIPLE WINDOW OUT DUE TO FIRE.
ECB06/09/2026AT EXPOSURE 2, ERECTED STORAGE SHED IN ALLEYWAY. STRUCTURE NOW OBSTRUCTS EXIT PASSAGEWAY TO STREET., REMOVE OBSTRUCTIONHearing held — result not yet published$2K proposed
ECB06/09/2026AT EXPOSURE 2, ERECTED SHED WITH STEEL BEAM AND FRAME. NO PERMITS ISSUED FOR THIS WORK., OBTAIN PERMITHearing held — result not yet published$2K proposed
ECB06/09/2026AT EXPOSURE 2, IN SIDE YARD, OBSERVED 2 TANKS OF GASEOUS ELEMENTS. OXYGEN FEEDS THE COMBUSTION PROCESS., MAINTAIN STORAGE IN COMPLIANCE WITH FIRE CODEHearing held — result not yet published$2K proposed