← Back
All parking garages
45-40 COURT SQUARE
QUEENS · BIN 4000699
💬 Discuss this project
1989Year Built
4Stories
G1Building Class
M1-5/R7-3Zoning
193,400 sfGross Floor Area
1Units
LL97 Covered6 Open Violations 4 unresolved · 2 paperwork only ▸
All parking garages · Owner of record: NYC DEPARTMENT OF TRANSPORTATION · 54,656 sf lot · 3.54 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 18 docs
Floor 4Under Construction2p · 1 filing · 20 docs
Floor 3Under Construction3p · 1 filing · 20 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC DEPARTMENT OF TRANSPORTATION1208/29/2026
NYCDOT703/22/2026
NYC DOT 8103/22/2026
DOT-NYC DEPARTMENT OF HIG303/22/2026
D.O.T. 8203/22/2026
DOT-NEW YORK CITY DEPARTM103/22/2026
DEPT OF TRANSPORATION 841403/22/2026
DEPT OF REAL ESTATE103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HOMAYOON SAGHAFI ARCHITECT407/06/2026
PACIFICO ENGINEERING PC306/18/2026
StructureCare305/19/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HIGH POINT ENGINEERING303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HIGH CONCRETE GROUP LLCGeneral Contractor707/08/2026
SUNRISE ELECTRICAL SRVGeneral Contractor207/14/2026
ART2LIVE INTERIOR ARCHGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TSS ENGINEERS4492207/06/2026
PACIFICO ENGINEERING PC3157506/18/2026
HIGH POINT ENGINEERING1151105/19/2025
Building Lifecycle
All (89)Filed (10)Permit Issued (7)Signed Off (3)Violation (54)Objection (4)Special Inspection (11)
07/13/2026
Permit issued — Solar
Q01320319-I1-SL
07/13/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
bassam (sam) rimawi
07/13/2026
Special inspection requirement — Final
bassam (sam) rimawi
07/06/2026
Filed — Alteration
Q01386023-P2
07/03/2026
Filed — Alteration
Q01386023-P1
06/26/2026
Special inspection requirement — Structural Steel - High Strength Bolting
Ralph Pacifico
06/26/2026
Special inspection requirement — Structural Cold-Formed Steel
Ralph Pacifico
06/26/2026
Special inspection requirement — Final
Ralph Pacifico
06/26/2026
Special inspection requirement — Structural Steel - Details
Ralph Pacifico
06/26/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Ralph Pacifico
06/18/2026
Filed — Alteration
Installation of steel carport on existing parking garage for solar energy system. No change of use, egress, or occupancy.
Q01320319-P1
06/11/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
bassam (sam) rimawi
06/11/2026
Special inspection requirement — Final
bassam (sam) rimawi
05/18/2026
Permit issued — Structural
Q01386023-S1-ST
05/14/2026
Permit issued — General Construction
Q01386023-I1-GC
05/06/2026
Filed — Alteration
Q01386023-S1
04/27/2026
Filed — Alteration
Q01386023-I1
03/18/2026
Permit issued — Structural
Q01320319-S1-ST
03/12/2026
Objection resolved — Addressed
03/10/2026
Objection raised — Admin
03/06/2026
Objection resolved — Resolved
03/05/2026
Filed — Alteration
Installation of steel carport on existing parking garage for solar energy system. No change of use, egress, or occupancy.
Q01320319-S1
02/11/2026
Violation issued (ECB, open)
Unknown
01/23/2026
Objection raised — Admin
01/13/2026
Filed — Alteration
Installation of steel carport on existing parking garage for solar energy system. No change of use, egress, or occupancy.
Q01320319-I1
07/07/2025
Signed off — Alteration
Phase III - Structural repair of existing column E3 at level 4 of the parking garage structure. No change in use, egress or occupancy.
Q01226013-I1
06/10/2025
Permit issued — Structural
Q01226013-I1-GC-CX
05/19/2025
Filed — Alteration
Phase III - Structural repair of existing column E3 at level 4 of the parking garage structure. No change in use, egress or occupancy.
Q01226013-I1
02/07/2025
Signed off — Alteration
Phase II - Removal and replacement in kind of existing expansion joints at the roof level along stair towers A&E. No change in use, egress or occupancy.
Q01100690-I1
02/06/2025
Signed off — Alteration
Phase II - Removal and replacement in kind of existing expansion joints at the roof level along stair towers A&E. No change in use, egress or occupancy.
Q01100690-S1
10/17/2024
Permit issued — Structural
Q01100690-S1-ST
10/04/2024
Filed — Alteration
Phase II - Removal and replacement in kind of existing expansion joints at the roof level along stair towers A&E. No change in use, egress or occupancy.
Q01100690-S1
10/03/2024
Permit issued — General Construction
Q01100690-I1-GC-CX
09/26/2024
Filed — Alteration
Phase II - Removal and replacement in kind of existing expansion joints at the roof level along stair towers A&E. No change in use, egress or occupancy.
Q01100690-I1
09/26/2024
Special inspection requirement — Final
SIMON ELMORE
09/03/2024
Violation issued (ECB, open)
Construction
08/22/2024
Special inspection requirement — Final
Steven Jeter
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/26/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/16/2017
Violation issued (ECB, closed)
Elevators
11/16/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/02/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/14/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/21/2016
Violation issued (ECB, closed)
Elevators
07/21/2016
Violation issued (ECB, closed)
Elevators
06/24/2016
Violation issued (ECB, closed)
Elevators
06/24/2016
Violation issued (ECB, closed)
Elevators
01/05/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/05/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/06/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/06/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
08/15/2014
Violation issued (ECB, closed)
Elevators
08/15/2014
Violation issued (ECB, closed)
Elevators
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/18/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/24/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 89 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRISE ELECTRICAL SRV07/13/2026
DOB NOWStructuralPermit IssuedTOPLINE NYC CONTRACTING05/18/2026
DOB NOWGeneral ConstructionPermit IssuedART2LIVE INTERIOR ARCH05/14/2026
DOB NOWStructuralPermit IssuedSUNRISE ELECTRICAL SRV03/18/2026
DOB NOWStructuralSigned-offHIGH CONCRETE GROUP LLC06/10/2025
DOB NOWStructuralSigned-offHIGH CONCRETE GROUP LLC10/17/2024
DOB NOWGeneral ConstructionSigned-offHIGH CONCRETE GROUP LLC10/03/2024
BIS—ISSUEDABBOTT INSTALLATIONS12/13/1990
4 projects · most recent 05/04/2026
General Wiring
FiledStatusContractorScope
05/04/2026Permit IssuedSUNRISE ELEC'L SERVICESGeneral Wiring
02/24/2026Permit IssuedSUNRISE ELEC'L SERVICES—
09/07/2021Permit IssuedCANDELA SYSTEMS CORP DBAGeneral Wiring
04/12/2019Permit IssuedE-J ELEC. INSTALLATION COGeneral Wiring
1 project · most recent 06/18/2026
Steel
FiledStatusContractorScope
06/18/2026Permit IssuedSUNRISE ELECTRICAL SRVSteel
1 project · most recent 06/18/2026
FiledStatusContractorScope
06/18/2026Permit IssuedSUNRISE ELECTRICAL SRV2,704 panels, 1,568,320 kw
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
07/13/2026Structural Stability – Alterations of existing buildingsbassam (sam) rimawispecial
07/13/2026Finalbassam (sam) rimawiprogress
06/26/2026Structural Steel - High Strength BoltingRalph Pacificospecial
06/26/2026Structural Cold-Formed SteelRalph Pacificospecial
06/26/2026FinalRalph Pacificoprogress
06/26/2026Structural Steel - DetailsRalph Pacificospecial
06/26/2026Structural Stability – Alterations of existing buildingsRalph Pacificospecial
06/11/2026Structural Stability – Alterations of existing buildingsbassam (sam) rimawispecial
06/11/2026Finalbassam (sam) rimawiprogress
09/26/2024FinalSIMON ELMOREprogress
08/22/2024FinalSteven Jeterprogress
▾Documents — 48 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/21/2026Q01100690-S1Request digital key ↗
08/21/2026Q01100690-I1Request digital key ↗
08/20/2026Q01226013-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits8
▸DOB NOWLPC Approval/Permit8
08/17/2026Q01320319-P1Open ↗
08/16/2026Q01386023-I1Open ↗
08/16/2026Q01386023-P1Open ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/21/2026Q01100690-I1Open ↗
08/21/2026Q01100690-S1Open ↗
08/20/2026Q01226013-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026Q01100690-I1Open ↗
09/01/2026Q01100690-S1Open ↗
08/26/2026Q01320319-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/26/2026Q01320319-S1Open ↗
08/26/2026Q01320319-S1Open ↗
08/26/2026Q01320319-S1Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter10
08/17/2026Q01320319-P1Open ↗
08/16/2026Q01386023-P1Open ↗
08/16/2026Q01386023-P2Open ↗
Showing 3 of 10 on file for this type