← Back
Factory, light manufacturing
25-37 51 AVENUE
QUEENS · BIN 4000764
💬 Discuss this project
1931Year Built
1Stories
F5Building Class
M3-2Zoning
3,037 sfGross Floor Area
1Units
Factory, light manufacturing · Owner of record: 25-16 AVENUE ASSOCIATES LLC · 3,037 sf lot · 1 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof2p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WERWAISS COMPANY2107/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WAI-TONG CHAN, ARCHITECT, PC604/24/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
COBOT PLUMBING AND HEATING INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RECORD 13 CONSTRUCTION COGeneral Contractor507/08/2026
PAVILLION CONTRACTING INCGeneral Contractor203/21/2026
COBOT PLUMBING AND HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WAI-TONG CHAN, ARCHITECT,3258304/24/2023
Building Lifecycle
All (47)Filed (6)Permit Issued (5)Signed Off (2)Inspection (4)Special Inspection (30)
07/24/2023
Signed off — Alteration
1ST FLR:RELOCATE EXIST WC AND SINK, REPLACE LAV, INSTALL 2 FLR SINKS, GREASE INTERCEPTOR, HAND SINK, TRENCH DRAIN, AND 3 COMP SINK; GAS PIPING FOR METER, RISER, COFFEE ROASTING MACHINE AND AFTERBURNER; REMOVE SPACE HEATER. ROF: INSTALL HVAC
Q00533668-I1
07/24/2023
Signed off — Alteration
1ST FLR,: REMOVAL WORK, INSTALL: PARTITIONS AND DOORS; R-38 BATT INSULATION BETWEEN EXIST ROOF JOISTS; ONE HOUR FIRE RATED GYPSUM BOARD CEILING AND STL BM ENCLOSURE; WALK IN BOX; HVAC SYSTEM; COFFEE ROASTING EQ; COLD BREW TANKS. ROF: DUNNAGE; EQUIPS.
Q00532937-I1
07/13/2023
Permit issued — General Construction
Q00532937-I1-ST
07/13/2023
Permit issued — Structural
Q00532937-I1-GC
07/12/2023
Permit issued — Mechanical Systems
Q00532937-I1-MS
04/26/2023
Special inspection requirement — HVAC-R and service water heating system controls
wai chan
04/26/2023
Special inspection requirement — HVAC-R and service water heating equipment
wai chan
04/26/2023
Special inspection requirement — Insulation placement and R values
wai chan
04/26/2023
Special inspection requirement — Interior lighting power
wai chan
04/26/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
wai chan
04/26/2023
Special inspection requirement — Lighting controls
wai chan
04/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
wai chan
04/26/2023
Special inspection requirement — Duct leakage testing, insulation and design
wai chan
04/26/2023
Special inspection requirement — Final
wai chan
04/26/2023
Special inspection requirement — Mechanical Systems
wai chan
04/26/2023
Special inspection requirement — Chimneys and vents
wai chan
04/26/2023
Special inspection requirement — Structural Steel - Details
wai chan
04/24/2023
Filed — Alteration
1ST FLR,: REMOVAL WORK, INSTALL: PARTITIONS AND DOORS; R-38 BATT INSULATION BETWEEN EXIST ROOF JOISTS; ONE HOUR FIRE RATED GYPSUM BOARD CEILING AND STL BM ENCLOSURE; WALK IN BOX; HVAC SYSTEM; COFFEE ROASTING EQ; COLD BREW TANKS. ROF: DUNNAGE; EQUIPS.
Q00532937-P2
04/20/2023
Special inspection requirement — Lighting controls
wai chan
04/20/2023
Special inspection requirement — Chimneys and vents
wai chan
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
wai chan
04/20/2023
Special inspection requirement — Mechanical Systems
wai chan
04/20/2023
Special inspection requirement — Structural Steel - Details
wai chan
04/20/2023
Special inspection requirement — Final
wai chan
04/20/2023
Special inspection requirement — Insulation placement and R values
wai chan
04/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
wai chan
04/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
wai chan
04/20/2023
Special inspection requirement — Interior lighting power
wai chan
04/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
wai chan
04/20/2023
Special inspection requirement — Duct leakage testing, insulation and design
wai chan
07/11/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/16/2022
Filed — Alteration
1ST FLR:RELOCATE EXIST WC AND SINK, REPLACE LAV, INSTALL 2 FLR SINKS, GREASE INTERCEPTOR, HAND SINK, TRENCH DRAIN, AND 3 COMP SINK; GAS PIPING FOR METER, RISER, COFFEE ROASTING MACHINE AND AFTERBURNER; REMOVE SPACE HEATER. ROF: INSTALL HVAC
Q00533668-P2
03/03/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/13/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/04/2021
Filed — Alteration
1ST FLR,: REMOVAL WORK, INSTALL: PARTITIONS AND DOORS; R-38 BATT INSULATION BETWEEN EXIST ROOF JOISTS; ONE HOUR FIRE RATED GYPSUM BOARD CEILING AND STL BM ENCLOSURE; WALK IN BOX; HVAC SYSTEM; COFFEE ROASTING EQ; COLD BREW TANKS. ROF: DUNNAGE; EQUIPS.
Q00532937-P1
10/04/2021
Filed — Alteration
1ST FLR:RELOCATE EXIST WC AND SINK, REPLACE LAV, INSTALL 2 FLR SINKS, GREASE INTERCEPTOR, HAND SINK, TRENCH DRAIN, AND 3 COMP SINK; GAS PIPING FOR METER, RISER, COFFEE ROASTING MACHINE AND AFTERBURNER; REMOVE SPACE HEATER. ROF: INSTALL HVAC
Q00533668-P1
10/02/2021
Special inspection requirement — Chimneys and vents
wai chan
10/02/2021
Special inspection requirement — Lighting controls
wai chan
10/02/2021
Special inspection requirement — Interior lighting power
wai chan
10/02/2021
Special inspection requirement — Insulation placement and R values
wai chan
10/02/2021
Special inspection requirement — HVAC-R and service water heating equipment
wai chan
10/02/2021
Special inspection requirement — HVAC-R and service water heating system controls
wai chan
08/05/2021
Permit issued — Plumbing
Q00533668-I1-PL
07/16/2021
Permit issued — General Construction
Q00532937-I1-GC
06/23/2021
Filed — Alteration
1ST FLR:RELOCATE EXIST WC AND SINK, REPLACE LAV, INSTALL 2 FLR SINKS, GREASE INTERCEPTOR, HAND SINK, TRENCH DRAIN, AND 3 COMP SINK; GAS PIPING FOR METER, RISER, COFFEE ROASTING MACHINE AND AFTERBURNER; REMOVE SPACE HEATER. ROF: INSTALL HVAC
Q00533668-I1
06/16/2021
Filed — Alteration
1ST FLR,: REMOVAL WORK, INSTALL: PARTITIONS AND DOORS; R-38 BATT INSULATION BETWEEN EXIST ROOF JOISTS; ONE HOUR FIRE RATED GYPSUM BOARD CEILING AND STL BM ENCLOSURE; WALK IN BOX; HVAC SYSTEM; COFFEE ROASTING EQ; COLD BREW TANKS. ROF: DUNNAGE; EQUIPS.
Q00532937-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offRECORD 13 CONSTRUCTION CO07/13/2023
DOB NOWStructuralSigned-offRECORD 13 CONSTRUCTION CO07/13/2023
DOB NOWMechanical SystemsSigned-offRECORD 13 CONSTRUCTION CO07/12/2023
DOB NOWPlumbingSigned-offCOBOT PLUMBING AND HEATIN08/05/2021
DOB NOWGeneral ConstructionSigned-offPAVILLION CONTRACTING INC07/16/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
07/11/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
04/26/2023HVAC-R and service water heating system controlswai chanenergy_progress
04/26/2023HVAC-R and service water heating equipmentwai chanenergy_progress
04/26/2023Insulation placement and R valueswai chanenergy_progress
04/26/2023Interior lighting powerwai chanenergy_progress
04/26/2023HVAC-R and service water piping design and insulationwai chanenergy_progress
04/26/2023Lighting controlswai chanenergy_progress
04/26/2023Fire-Resistant Penetrations and Jointswai chanspecial
04/26/2023Duct leakage testing, insulation and designwai chanenergy_progress
04/26/2023Finalwai chanprogress
04/26/2023Mechanical Systemswai chanspecial
04/26/2023Chimneys and ventswai chanspecial
04/26/2023Structural Steel - Detailswai chanspecial
04/20/2023Lighting controlswai chanenergy_progress
04/20/2023Chimneys and ventswai chanspecial
04/20/2023Fire-Resistant Penetrations and Jointswai chanspecial
04/20/2023Mechanical Systemswai chanspecial
04/20/2023Structural Steel - Detailswai chanspecial
04/20/2023Finalwai chanprogress
04/20/2023Insulation placement and R valueswai chanenergy_progress
04/20/2023HVAC-R and service water heating system controlswai chanenergy_progress
04/20/2023HVAC-R and service water heating equipmentwai chanenergy_progress
04/20/2023Interior lighting powerwai chanenergy_progress
04/20/2023HVAC-R and service water piping design and insulationwai chanenergy_progress
04/20/2023Duct leakage testing, insulation and designwai chanenergy_progress
10/02/2021Chimneys and ventswai chanspecial
Latest 25 of 36.
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/27/2026Q00532937-I1Request digital key ↗
08/27/2026Q00532937-P1Request digital key ↗
08/27/2026Q00532937-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature24
09/02/2026Q00532937-P1Open ↗
09/02/2026Q00532937-P1Open ↗
09/02/2026Q00532937-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026Q00532937-P1Open ↗
09/02/2026Q00532937-P1Open ↗
09/02/2026Q00532937-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q00533668-P2Open ↗
08/13/2026Q00533668-P1Open ↗
08/13/2026Q00532937-P2Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026Q00533668-P1Open ↗
08/13/2026Q00532937-P2Open ↗
08/13/2026Q00532937-P1Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1