← Back
Office only, 2-6 stories
41-24 38 STREET
QUEENS · BIN 4003125
💬 Discuss this project
1962Year Built
2Stories
O2Building Class
M1-4Zoning
16,950 sfGross Floor Area
1Units
7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: APEKS GROUP LLC · 11,000 sf lot · 1.54 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 15 docs
Floor 11p · 1 filing · 15 docs
2 jobs · most recent 09/28/2020
General Wiring
FiledStatusContractorScope
09/28/2020CompleteWILLDAN ELECTRICAL OF NY—
09/28/2020CompleteWILLDAN ELECTRICAL OF NYGeneral Wiring
Building Lifecycle
All (57)Filed (3)Permit Issued (3)Signed Off (3)Violation (27)Inspection (2)Objection (12)Special Inspection (7)
03/09/2026
Signed off — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-I1
03/06/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/24/2025
Signed off — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-S3
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/12/2025
Signed off — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-S2
10/20/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
10/16/2025
Permit issued — Structural
Q01248489-S3-ST
10/03/2025
Permit issued — Curb Cut
Q01248489-I1-CC
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/26/2025
Objection resolved — Addressed
09/25/2025
Objection raised — Structural
09/25/2025
Objection raised — Structural
09/25/2025
Objection raised — Structural
09/19/2025
Permit issued — General Construction
Q01248489-S2-GC
09/15/2025
Objection resolved — Addressed
09/11/2025
Filed — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-S3
09/11/2025
Filed — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-S2
09/11/2025
Special inspection requirement — Structural Steel - Details
Joshua Lowrance
09/11/2025
Special inspection requirement — Masonry
Joshua Lowrance
09/11/2025
Special inspection requirement — Structural Cold-Formed Steel
Joshua Lowrance
09/11/2025
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
09/11/2025
Special inspection requirement — Structural Steel - Welding
Joshua Lowrance
09/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Joshua Lowrance
09/11/2025
Special inspection requirement — Final
EUGENE BIFULCO
08/17/2025
Objection resolved — Addressed
08/17/2025
Objection resolved — Addressed
07/31/2025
Violation issued (ECB, open)
Boilers
07/15/2025
Objection raised — Scope
07/15/2025
Objection raised — Scope
07/15/2025
Objection raised — Scope
06/28/2025
Filed — Alteration
HEREBY FILING STRUCTURAL DRAWINGS FOR NEW DOOR ON EXPOSURE #1 AT EXISITNG OFFICE BUILDING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Q01248489-I1
10/24/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/01/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/19/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/31/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
APEKS GROUP LLC103/22/2026
VTI REALTY INC.203/22/2026
THE VILNITS GROUP LLC203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2024$5.5M—— → —$324/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JL SPECIAL INSPECTIONS109/11/2025
RAS PE CONSULTING ENGINEERS109/11/2025
THE VILNITS GROUP206/28/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THE VILNITS GROUP LLC403/21/2026
JL Special Inspections103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROYAL CONCRETE AND MASON*General Contractor303/21/2026
DK CONSTRUCTION ONE, CORPGeneral Contractor204/09/2026
WILLDAN ELECTRICAL OF NYElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544109/11/2025
JL SPECIAL INSPECTIONS LL9500209/11/2025
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offDK CONSTRUCTION ONE, CORP10/16/2025
DOB NOWCurb CutSigned-offROYAL CONCRETE AND MASON*10/03/2025
DOB NOWGeneral ConstructionSigned-offDK CONSTRUCTION ONE, CORP09/19/2025
BISOTISSUEDCOW BAY SPRINKLER CORP06/28/2007
BISSPISSUEDDEPENDABLE SPRINKLER CORP07/26/1999
BISPLISSUEDADVANCED PLBG LLC03/15/1999
BIS—ISSUEDCOW BAY CONTRACTING03/02/1999
BISOTISSUEDARIANA CONTRACITNG INC.03/24/1994
BISPLISSUEDARIANA CONTRACTING INC03/24/1994
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
03/06/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
10/20/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
09/11/2025Structural Steel - DetailsJoshua Lowrancespecial
09/11/2025MasonryJoshua Lowrancespecial
09/11/2025Structural Cold-Formed SteelJoshua Lowrancespecial
09/11/2025Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
09/11/2025Structural Steel - WeldingJoshua Lowrancespecial
09/11/2025Structural Stability – Alterations of existing buildingsJoshua Lowrancespecial
09/11/2025FinalEUGENE BIFULCOprogress
▾Documents — 17 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/29/2026Q01248106-I1Request digital key ↗
08/19/2026Q01248489-S3Request digital key ↗
08/19/2026Q01248489-S2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWSpecial Inspector Seal & Signature6
08/28/2026Q01248489-S3Open ↗
08/28/2026Q01248489-S3Open ↗
08/28/2026Q01248489-S3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q01248106-I1Open ↗
08/13/2026Q01248489-S3Open ↗
08/13/2026Q01248489-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026Q01248489-S3Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q01248489-S3Open ↗
08/13/2026Q01248489-S2Open ↗