← Back
General warehouse
33-38 10 STREET
QUEENS · BIN 4003796
💬 Discuss this project
1931Year Built
1Stories
E1Building Class
R5Zoning
3,190 sfGross Floor Area
1Units
General warehouse · Owner of record: THE ISAMU NOGUCHI FOUNDATION AND GARDEN MUSEUM · 3,195 sf lot · 1 FAR built · Flood zone X500
Locations of Work
MechanicalPlumbing
Roof2p · 1 filing · 15 docs
Floor 12p · 1 filing · 15 docs
Mezzanine1p · 1 filing · 15 docs
1 job · most recent 03/29/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/29/2023——Heating and Air Conditioning Systems
Heat / Cool
Trane TRANE YSJ102A3S0H 162,000 BTU · Rooftop Unit ×2
Building Lifecycle
All (51)Filed (9)Permit Issued (1)Signed Off (1)Objection (18)Special Inspection (22)
06/09/2023
Objection resolved — Addressed
06/09/2023
Objection resolved — Addressed
06/01/2023
Objection raised — Other
06/01/2023
Objection raised — Scope
05/22/2023
Objection raised — Scope
05/22/2023
Objection raised — Scope
05/22/2023
Special inspection requirement — Energy Code Compliance Inspections
05/22/2023
Special inspection requirement — Post-installed Anchors
05/18/2023
Objection resolved — Addressed
05/18/2023
Objection resolved — Addressed
05/17/2023
Filed — Alteration
Proposed 12-0 ft curb cut including 1-5 splays located on 10th Street. Filed in conjunction with Q00841734-I1 for the studio.
Q00873580-I1
05/17/2023
Filed — Alteration
Q00873560-I1
05/05/2023
Filed — No Work
Q00866557-I1
04/17/2023
Objection resolved — Addressed
04/17/2023
Objection resolved — Addressed
04/17/2023
Objection resolved — Addressed
03/29/2023
Filed — Alteration CO
INSTALLATION OF NEW ROOFTOP AIR CONDITIONING UNITS TOSERVE THE HEATING, COOLING, & VENITLATION .INSULATION AND REPLACEMENT OF FIXTURES.
Q00841734-S1
03/28/2023
Objection raised — Other
03/28/2023
Objection raised — Energy
03/28/2023
Objection raised — Structural
03/28/2023
Objection raised — Structural
03/28/2023
Objection raised — Proved survey listing all buil
03/20/2023
Filed — Alteration CO
INSTALLATION OF NEW ROOFTOP AIR CONDITIONING UNITS TOSERVE THE HEATING, COOLING, & VENITLATION .INSULATION AND REPLACEMENT OF FIXTURES.
Q00841734-S3
03/20/2023
Filed — Alteration CO
INSTALLATION OF NEW ROOFTOP AIR CONDITIONING UNITS TOSERVE THE HEATING, COOLING, & VENITLATION .INSULATION AND REPLACEMENT OF FIXTURES.
Q00841734-S2
03/17/2023
Filed — Alteration CO
INSTALLATION OF NEW ROOFTOP AIR CONDITIONING UNITS TOSERVE THE HEATING, COOLING, & VENITLATION .INSULATION AND REPLACEMENT OF FIXTURES.
Q00841734-I1
03/17/2023
Special inspection requirement — Structural Steel - High Strength Bolting
03/17/2023
Special inspection requirement — Structural Steel - Welding
03/17/2023
Special inspection requirement — Final
03/17/2023
Special inspection requirement — Lowest Floor Elevation
03/17/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
03/17/2023
Special inspection requirement — Structural Steel - Details
03/17/2023
Special inspection requirement — Mechanical Systems
03/17/2023
Special inspection requirement — Energy Code Compliance Inspections
03/17/2023
Special inspection requirement — Final
03/09/2023
Special inspection requirement — Fenestration areas
03/09/2023
Special inspection requirement — Lighting controls
03/09/2023
Special inspection requirement — Interior lighting power
03/09/2023
Special inspection requirement — Exterior lighting power
03/09/2023
Special inspection requirement — Maintenance information
03/09/2023
Special inspection requirement — Air barrier - visual inspection
03/09/2023
Special inspection requirement — Fenestration air leakage
03/09/2023
Special inspection requirement — Metering
03/09/2023
Special inspection requirement — Masonry
03/09/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
03/09/2023
Special inspection requirement — Air barrier — testing
12/12/2022
Signed off — Alteration
FILING FOR INSTALLATION OF TEMPORARY MODULAR TENT AS PER PLANS SUBMITTED HEREWITH.
Q08034700-I1
11/10/2022
Permit issued — General Construction
Q08034700-I1-GC
11/06/2022
Objection raised — Other
11/06/2022
Objection resolved — Addressed
11/04/2022
Filed — Alteration
FILING FOR INSTALLATION OF TEMPORARY MODULAR TENT AS PER PLANS SUBMITTED HEREWITH.
Q08034700-I1
11/04/2022
Filed — No Work
Q08032042-I1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
THE ISAMU NOGUCHI FOUNDATION1903/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LANGAN ENGINEERING205/17/2023
MARVEL ARCHITECTS605/05/2023
ANTONIO LEO ARCHITECT111/04/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1603/21/2026
GREEN LIGHT EXPEDITING LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
STAMFORD TENT & EQUIP COGeneral Contractor203/21/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSTAMFORD TENT & EQUIP CO11/10/2022
BISPLISSUEDRAYTONE PLUMBING04/20/2001
BISSPISSUEDHEADS UP FIRE SPRINKLER10/15/1999
▾Special Inspection Requirements (DOB NOW) — 22
DateRequirementInspectorRole
05/22/2023Energy Code Compliance Inspections—progress
05/22/2023Post-installed Anchors—special
03/17/2023Structural Steel - High Strength Bolting—special
03/17/2023Structural Steel - Welding—special
03/17/2023Final—progress
03/17/2023Lowest Floor Elevation—progress
03/17/2023Structural Stability – Alterations of existing buildings—special
03/17/2023Structural Steel - Details—special
03/17/2023Mechanical Systems—special
03/17/2023Energy Code Compliance Inspections—progress
03/17/2023Final—progress
03/09/2023Fenestration areas—energy_progress
03/09/2023Lighting controls—energy_progress
03/09/2023Interior lighting power—energy_progress
03/09/2023Exterior lighting power—energy_progress
03/09/2023Maintenance information—energy_progress
03/09/2023Air barrier - visual inspection—energy_progress
03/09/2023Fenestration air leakage—energy_progress
03/09/2023Metering—energy_progress
03/09/2023Masonry—special
03/09/2023Fenestration and door U-factor and product ratings—energy_progress
03/09/2023Air barrier — testing —energy_progress
▾Documents — 40 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch7
08/25/2026Q08034700-I1Request digital key ↗
08/25/2026Q00841734-S1Request digital key ↗
08/25/2026Q00841734-S3Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Temporary Place of Assembly2
08/24/2026Q00866557-I1Request digital key ↗
08/14/2026Q08032042-I1Request digital key ↗
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/25/2026Q08034700-I1Open ↗
08/25/2026Q08032042-I1Open ↗
08/25/2026Q00841734-S3Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes1
05/07/2020421763309Open ↗
▸DOB NOWStreet Tree Checklist1
08/14/2026Q00841734-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/07/2020421763309Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/07/2020421763309Open ↗
▸Approvals, Objections & Sign-offs10
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter9
08/25/2026Q00841734-S1Open ↗
08/25/2026Q00841734-S3Open ↗
08/25/2026Q00841734-S2Open ↗
Showing 3 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/04/2020421763309Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
05/07/2020421763309Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
05/04/2020421763309Open ↗
▸BISEFILING COVER SHEET1
05/04/2020421763309Open ↗
▸Other Documents5
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
06/09/2020421763309Open ↗
06/09/2020421763309Open ↗
▸BISSupporting Document: Fee Exempt1
06/09/2020421763309Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026Q00841734-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00841734-I1Open ↗