← Back
Factory, industrial, miscellaneous
25-20 40 AVENUE
QUEENS · BIN 4004900
💬 Discuss this project
1990Year Built
2Stories
F9Building Class
M1-2/R5DZoning
5,000 sfGross Floor Area
1Units
Factory, industrial, miscellaneous · Owner of record: 25-20 LLC · 2,521 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Roof4p · 1 filing · 10 docs
Floor 23p · 2 filings · 13 docs
Floor 13p · 2 filings · 13 docs
1 job · most recent 06/14/2023
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/14/2023——Associated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Rheem RGEA14036BCT101 6 tons · Ductwork ×4
RGEA14060BCT101 5 tons · Rooftop Unit ×1
Daikin DX11SA0903 90,000 BTU · Heat Pump Outdoor ×1
Ventilation
Broan ARN80HD 140 CFM · Exhaust Fan ×4
1 job · most recent 06/14/2023
Gas
FiledStatusContractorScope
06/14/2023——Gas
1 job · most recent 06/30/2020
General Wiring
FiledStatusContractorScope
06/30/2020CompleteMAK ELECTRICAL CONTR CORPGeneral Wiring
Building Lifecycle
All (15)Filed (3)Permit Issued (1)Special Inspection (11)
06/14/2023
Filed — Alteration
REPLACE TWO AC UNITS WITH TWO 3-TON UNITS AND ONE WITH A 5-TON UNIT. REMOVE AND INSTALL NEW AIR DISTRIBUTION DUCTS. NO CHANGE IN USE WGRESS OR OCCUPANCY.
Q00884780-I1
06/14/2023
Filed — Alteration
REPLACE TWO AC UNITS WITH TWO 3-TON UNITS AND ONE WITH A 5-TON UNIT. REMOVE AND INSTALL NEW AIR DISTRIBUTION DUCTS. NO CHANGE IN USE WGRESS OR OCCUPANCY.
Q00884780-S1
06/05/2023
Special inspection requirement — HVAC-R and service water heating system controls
06/05/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/05/2023
Special inspection requirement — Shutoff dampers
06/05/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
06/05/2023
Special inspection requirement — Ventilation and air distribution system
06/05/2023
Special inspection requirement — Duct leakage testing, insulation and design
06/05/2023
Special inspection requirement — HVAC-R and service water heating equipment
06/05/2023
Special inspection requirement — Maintenance information
06/03/2023
Special inspection requirement — Mechanical Systems
06/03/2023
Special inspection requirement — Final
06/25/2020
Permit issued — Plumbing
Q00333667-I1-PL
04/03/2020
Filed — Alteration
RELOCATE 2 FIXTURE BATHROOM AND KITCHEN SINK ON SECOND FLOOR. INSTALL SHOWER ON 2ND FLOOR. INSTALL WATER SUPPLY AND WASTE PIPING RELATED TO THIS WORK.
Q00333667-I1
03/24/2020
Special inspection requirement — Maintenance information
Kevin McCray
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2520 LLC203/21/2026
25-18 40TH AVE203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/06/2019$1.2M—Private party → 25-20 LLC$250/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ADS&Y INC.206/14/2023
MCCRAY ARCHITECT P.C.104/03/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARATHON MECHANICAL LLCPlumbing107/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedMARATHON MECHANICAL LLC06/25/2020
BISMHISSUEDUNLIMITED MECHANICAL COMP09/22/2011
BISOTISSUEDARACO CONSTRUCTION05/26/2005
BISOTISSUEDARACO CONSTRUCTION03/15/2005
BISPLISSUEDARTEMIS PLUMBING & HEATING INC.12/21/1993
BIS—ISSUED25-20 40TH AVENUE ASSOCIATES02/08/1991
BIS—ISSUEDACTI RESTORATION11/21/1989
BIS—ISSUEDACTI RESTORATION09/28/1989
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/05/2023HVAC-R and service water heating system controls—energy_progress
06/05/2023Fire-Resistant Penetrations and Joints—special
06/05/2023Shutoff dampers—energy_progress
06/05/2023HVAC-R and service water piping design and insulation—energy_progress
06/05/2023Ventilation and air distribution system—energy_progress
06/05/2023Duct leakage testing, insulation and design—energy_progress
06/05/2023HVAC-R and service water heating equipment—energy_progress
06/05/2023Maintenance information—energy_progress
06/03/2023Mechanical Systems—special
06/03/2023Final—progress
03/24/2020Maintenance informationKevin McCrayenergy_progress
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch4
08/24/2026Q00884780-P2Request digital key ↗
08/24/2026Q00884780-P1Request digital key ↗
08/24/2026Q00884780-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/28/2026Q00333667-I1Request digital key ↗
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
03/23/2020421958858Open ↗
08/15/2011420468997Open ↗
▸BISWORK PERMIT APPLICATION1
09/27/2011420468997Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q00884780-S1Open ↗
08/13/2026Q00333667-I1Open ↗
08/13/2026Q00884780-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/23/2020421958858Open ↗
11/01/2011420468997Open ↗
08/15/2011420468997Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
03/23/2020421958858Open ↗
08/15/2011420468997Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/15/2011420468997Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
03/20/2020421958858Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q00333667-I1Open ↗
▸Trade Schedules & Equipment3
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/01/2011420468997Open ↗
08/15/2011420468997Open ↗
▸BISEQUIPMENT USE PERMITS1
11/01/2011420468997Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
08/15/2011420468997Open ↗
▸BISTenant Protection Plan and Notes1
03/23/2020421958858Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/13/2026Q00884780-P2Open ↗
08/13/2026Q00884780-P1Open ↗
08/13/2026Q00884780-S1Open ↗
Showing 3 of 4 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/18/2011420468997Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY1
08/15/2011420468997Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/23/2020421958858Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/01/2011420468997Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
11/01/2011420468997Open ↗
11/01/2011420468997Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/15/2011420468997Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/01/2011420468997Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
03/23/2020421958858Open ↗
11/01/2011420468997Open ↗
08/15/2011420468997Open ↗
▸Filing & Intake Forms2
▸BISEFILING COVER SHEET2
03/23/2020421958858Open ↗
08/15/2011420468997Open ↗