← Back
All parking garages
11-08 30 AVENUE
QUEENS · BIN 4005549
💬 Discuss this project
1916Year Built
1Stories
G1Building Class
R6AZoning
6,800 sfGross Floor Area
1Units
19 Open Violations 18 unresolved · 1 paperwork only ▸
All parking garages · Owner of record: GRAND & MAIN REALTY CORP · 6,800 sf lot · 1 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GRAND MAIN REALTY407/08/2026
ALL AMERICAN SCHOOL BUS CORP.1303/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KV LAMBIRIS ARCHITECT410/29/2025
GREGORY V. PEROTTO, P.E.111/16/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PEROTTO GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.P. MECHANICAL CORPGeneral Contractor203/21/2026
G.P. MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KV LAMBIRIS ARCHITECT3401110/29/2025
GREGORY V. PEROTTO, P.E.947111/16/2023
Building Lifecycle
All (43)Filed (5)Permit Issued (3)Signed Off (1)Violation (20)Inspection (3)Special Inspection (11)
10/30/2025
Permit issued — Mechanical Systems
Q01124085-S1-MS
10/29/2025
Filed — Alteration
REMOVAL OF EXISTING BOILER AND INSTALLATION OF NEW GAS SPACE HEATERS, GAS PIPING AND GAS METER.
Q01124085-S1
04/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/08/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2025
Filed — Alteration
REMOVAL OF EXISTING BOILER AND INSTALLATION OF NEW GAS SPACE HEATERS, GAS PIPING AND GAS METER.
Q01124085-P2
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kyprianos Lambiris
01/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Kyprianos Lambiris
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kyprianos Lambiris
01/06/2025
Special inspection requirement — Maintenance information
Kyprianos Lambiris
01/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kyprianos Lambiris
01/02/2025
Special inspection requirement — Maintenance information
Kyprianos Lambiris
01/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Kyprianos Lambiris
01/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Kyprianos Lambiris
01/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Kyprianos Lambiris
01/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Kyprianos Lambiris
11/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/02/2024
Filed — Alteration
REMOVAL OF EXISTING BOILER AND INSTALLATION OF NEW GAS SPACE HEATERS, GAS PIPING AND GAS METER.
Q01124085-P1
10/18/2024
Permit issued — Plumbing
Q01124085-I1-PL
10/16/2024
Filed — Alteration
REMOVAL OF EXISTING BOILER AND INSTALLATION OF NEW GAS SPACE HEATERS, GAS PIPING AND GAS METER.
Q01124085-I1
10/01/2024
Violation issued (ECB, open)
Construction
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/22/2024
Signed off — Alteration
REPLACE 1-1,080 GAL. FUEL OIL TANK WITH 2 NEW 275 GAL FUEL OIL TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00957732-I1
01/11/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/16/2023
Filed — Alteration
REPLACE 1-1,080 GAL. FUEL OIL TANK WITH 2 NEW 275 GAL FUEL OIL TANKS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q00957732-I1
11/16/2023
Permit issued — Boiler Equipment
Q00957732-I1-BE
11/03/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Perotto
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/23/2017
Violation issued (ECB, closed)
Construction
10/01/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/06/2006
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/31/2005
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/16/1999
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/07/1994
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedG.P. MECHANICAL CORP10/30/2025
DOB NOWPlumbingSigned-offG.P. MECHANICAL CORP10/18/2024
DOB NOWBoiler EquipmentSigned-offQUALITY HEATING DESIGN IN11/16/2023
BISBLISSUEDMETRO FUEL OIL CORPORATION05/21/1992
1 project · most recent 10/29/2025
Gas
FiledStatusContractorScope
10/29/2025Signed-offG.P. MECHANICAL CORPGas
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/11/2024Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
01/06/2025HVAC-R and service water heating system controlsKyprianos Lambirisenergy_progress
01/06/2025Energy Code Compliance InspectionsKyprianos Lambirisprogress
01/06/2025HVAC-R and service water heating equipmentKyprianos Lambirisenergy_progress
01/06/2025Maintenance informationKyprianos Lambirisenergy_progress
01/06/2025HVAC-R and service water piping design and insulationKyprianos Lambirisenergy_progress
01/02/2025Maintenance informationKyprianos Lambirisenergy_progress
01/02/2025Energy Code Compliance InspectionsKyprianos Lambirisprogress
01/02/2025HVAC-R and service water heating system controlsKyprianos Lambirisenergy_progress
01/02/2025HVAC-R and service water heating equipmentKyprianos Lambirisenergy_progress
01/02/2025HVAC-R and service water piping design and insulationKyprianos Lambirisenergy_progress
11/03/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Perottospecial
▾Documents — 26 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026Q00957732-I1Request digital key ↗
08/21/2026Q01124085-I1Request digital key ↗
08/21/2026Q01124085-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications16
▸DOB NOWProgress Inspector Seal & Signature10
08/27/2026Q01124085-P2Open ↗
08/27/2026Q01124085-P2Open ↗
08/27/2026Q01124085-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026Q01124085-I1Open ↗
08/13/2026Q01124085-P2Open ↗
08/13/2026Q01124085-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/23/2026Q00957732-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026Q01124085-I1Open ↗
08/13/2026Q01124085-P2Open ↗
08/13/2026Q01124085-S1Open ↗
Showing 3 of 5 on file for this type