← Back
Single or multiple dwelling with stores or offices
21-06 30 AVENUE
QUEENS · BIN 4006315
💬 Discuss this project
1940Year Built
3Stories
S9Building Class
R7AZoning
3,146 sfGross Floor Area
4Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · 1,600 sf lot · 1.97 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalPlumbing
Roof6p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
Cellar12p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
IVAN SHCHERBAKOV612/05/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BANJI ARCHITECT PC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AIS RENOVATIONS CORPGeneral Contractor204/09/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG ENGINEERING PLLC8899612/05/2025
Building Lifecycle
All (15)Filed (6)Permit Issued (3)Signed Off (2)Violation (4)
03/03/2026
Signed off — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-I1
03/03/2026
Signed off — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-S2
12/05/2025
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-P4
12/05/2025
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-P3
05/02/2025
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-P1
05/02/2025
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-P2
04/29/2025
Permit issued — General Construction
Q01113542-I1-GC
03/17/2025
Permit issued — Plumbing
Q01113542-S2-PL
02/10/2025
Permit issued — General Construction
Q01113542-I1-GC
11/13/2024
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-I1
11/13/2024
Filed — Alteration
ALTERATION AND INTERIOR RENOVATION OF EXISTING 3 STORY AND CELLAR MIXED-USE BUILDING.ROOF REPAIR WORK. NO CHANGES TO USE, EGRESS, BULK OR FAR.
Q01113542-S2
05/15/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2007
Violation issued (ECB, open)
Construction
11/16/1999
Violation issued (ECB, closed)
HPD
04/12/1999
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP04/29/2025
DOB NOWPlumbingSigned-offTHOMAS F. CASH & SONS INC03/17/2025
DOB NOWGeneral ConstructionSigned-offAIS RENOVATIONS CORP02/10/2025
BISOTISSUEDFASA CONTRACTING INC09/21/2007
BISEQISSUEDOUTDOOR INSTALLATIONS LLC01/26/2007
1 project · most recent 09/22/2025
General Wiring
FiledStatusContractorScope
09/22/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/17/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
12/17/2025HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
12/17/2025HVAC-R and service water heating system controlsARIEL GOLSHANenergy_progress
12/17/2025Maintenance informationARIEL GOLSHANenergy_progress
12/17/2025HVAC-R and service water piping design and insulationARIEL GOLSHANenergy_progress
12/17/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/17/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/16/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
12/16/2025FinalARIEL GOLSHANprogress
12/16/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
12/16/2025Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
12/16/2025Lighting controlsARIEL GOLSHANenergy_progress
12/16/2025Fenestration air leakageARIEL GOLSHANenergy_progress
11/11/2025Fenestration air leakageARIEL GOLSHANenergy_progress
11/11/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
11/11/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
11/11/2025FinalARIEL GOLSHANprogress
11/11/2025Fire-Resistance Rated ConstructionARIEL GOLSHANprogress
11/11/2025Lighting controlsARIEL GOLSHANenergy_progress
09/29/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
09/29/2025Energy Code Compliance InspectionsARIEL GOLSHANprogress
09/29/2025HVAC-R and service water heating system controlsARIEL GOLSHANenergy_progress
09/29/2025HVAC-R and service water piping design and insulationARIEL GOLSHANenergy_progress
09/29/2025Maintenance informationARIEL GOLSHANenergy_progress
09/29/2025HVAC-R and service water heating equipmentARIEL GOLSHANenergy_progress
03/27/2025Fire-Resistant Penetrations and JointsARIEL GOLSHANspecial
Latest 25 of 36.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026Q01113542-P1Request digital key ↗
08/20/2026Q01113542-S2Request digital key ↗
08/20/2026Q01113542-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications24
▸DOB NOWProgress Inspector Seal & Signature12
09/27/2026Q01113542-P1Open ↗
09/27/2026Q01113542-P1Open ↗
08/29/2026Q01113542-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/13/2026Q01113542-S2Open ↗
08/13/2026Q01113542-P2Open ↗
08/13/2026Q01113542-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/27/2026Q01113542-P1Open ↗
08/29/2026Q01113542-I1Open ↗
08/25/2026Q01113542-P3Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/13/2026Q01113542-P1Open ↗
08/13/2026Q01113542-I1Open ↗
08/13/2026Q01113542-S2Open ↗
Showing 3 of 6 on file for this type