← Back
Over six families without stores
32-35 30 STREET
QUEENS · BIN 4007449
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R5Zoning
58,000 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized2 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: ASTORIA 35 INC · 21,000 sf lot · 2.76 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ASTORIA 35503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW YORK ENGINEERING ASSOC., P.C.212/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NEW YORK ENGINEERING203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARISTON CHIMNEY LLCGeneral Contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW YORK ENGINEERING ASSO851212/13/2024
Building Lifecycle
All (24)Filed (2)Permit Issued (2)Signed Off (2)Violation (7)Inspection (1)Special Inspection (10)
11/17/2025
Signed off — Alteration
REPLACE BOILER AND BURNER.
Q01126782-I1
11/17/2025
Signed off — Alteration
REPLACE BOILER AND BURNER.
Q01126782-S2
06/09/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
04/30/2025
Permit issued — General Construction
Q01126782-S2-GC
12/23/2024
Permit issued — Boiler Equipment
Q01126782-I1-BE
12/13/2024
Filed — Alteration
REPLACE BOILER AND BURNER.
Q01126782-I1
12/13/2024
Filed — Alteration
REPLACE BOILER AND BURNER.
Q01126782-S2
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/31/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
10/28/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
10/28/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
10/25/2024
Special inspection requirement — Chimneys and vents
LOUIS ARENA
10/25/2024
Special inspection requirement — Final
LOUIS ARENA
10/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
10/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
10/14/2024
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
LOUIS ARENA
10/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/14/2021
Violation issued (HPD, closed)
A
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/28/1991
Violation issued (HPD, closed)
C
08/26/1989
Violation issued (HPD, closed)
C
08/26/1989
Violation issued (HPD, closed)
C
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offARISTON CHIMNEY LLC04/30/2025
DOB NOWBoiler EquipmentSigned-offG. BAUER, INC12/23/2024
BISEQISSUEDPILKU CONSTRUCTION SERVIC04/21/2015
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
06/09/2025Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
10/31/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/31/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
10/28/2024Maintenance informationLOUIS ARENAenergy_progress
10/28/2024Heating SystemsLOUIS ARENAspecial
10/25/2024Chimneys and ventsLOUIS ARENAspecial
10/25/2024FinalLOUIS ARENAprogress
10/14/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/14/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
10/14/2024Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
10/14/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026Q01126782-S2Request digital key ↗
08/21/2026Q01126782-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
04/20/2015440213528Open ↗
▸BISWORK PERMIT APPLICATION1
04/20/2015440213528Open ↗
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/21/2026Q01126782-S2Open ↗
08/21/2026Q01126782-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/31/2026Q01126782-I1Open ↗
08/29/2026Q01126782-S2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026Q01126782-I1Open ↗
08/29/2026Q01126782-S2Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/20/2015440213528Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/20/2015440213528Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/20/2015440213528Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/09/2015440213528Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/21/2026Q01126782-I1Open ↗
08/21/2026Q01126782-S2Open ↗
▸Energy Compliance2
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/20/2015440213528Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026Q01126782-I1Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
04/20/2015440213528Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
11/09/2015440213528Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
04/20/2015440213528Open ↗