← Back
Elevator apt, semi-fireproof without stores
31-75 29 STREET
QUEENS · BIN 4007474
💬 Discuss this project
1928Year Built
6Stories
D1Building Class
R6AZoning
39,549 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized10 Open Violations ▸FISP: SAFE
Elevator apt, semi-fireproof without stores · Owner of record: MHP REALTY LLC · 11,200 sf lot · 3.53 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
1 job · most recent 05/15/2019
FiledStatusContractorScope
05/15/2019CompleteRICHARD NEU—
1 job · most recent 05/15/2019
Scaffold
FiledStatusContractorScope
05/15/2019Permit IssuedJASCO, INCScaffold
Building Lifecycle
All (75)Filed (2)Permit Issued (3)Signed Off (1)Facade (FISP) (9)Violation (60)
12/02/2024
Violation issued (HPD, closed)
I
09/16/2024
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00165731-I1
06/12/2024
Violation issued (HPD, closed)
B
04/18/2024
Cycle 9 facade report submitted
04/15/2024
Cycle 9 facade report signed — SAFE
04/12/2024
Violation issued (HPD, closed)
A
04/05/2024
Cycle 9 facade inspection completed
11/24/2023
Violation issued (HPD, closed)
I
09/05/2023
Permit issued — Sidewalk Shed
Q00165731-I1-SH
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/27/2023
Violation issued (HPD, closed)
A
02/22/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2022
Violation issued (HPD, closed)
A
04/29/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/27/2020
Cycle 8 facade report signed — SAFE
05/11/2020
Cycle 8 facade report submitted
05/02/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/28/2020
Cycle 8 facade inspection completed
03/16/2020
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/07/2020
Cycle 8 facade report signed — UNSAFE
02/26/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/03/2020
Cycle 8 facade inspection completed
11/18/2019
Cycle 8 facade report submitted
08/27/2019
Violation issued (HPD, closed)
A
07/09/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/16/2019
Permit issued — Supported Scaffold
Q00165728-I1-SF
05/15/2019
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00165731-I1
05/15/2019
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00165728-I1
05/15/2019
Permit issued — Sidewalk Shed
Q00165731-I1-SH
05/13/2019
Violation issued (HPD, closed)
A
05/02/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/10/2019
Violation issued (ECB, closed)
Construction
04/08/2019
Violation issued (HPD, open)
A
04/08/2019
Violation issued (HPD, open)
A
04/08/2019
Violation issued (HPD, closed)
A
04/08/2019
Violation issued (HPD, closed)
B
03/11/2019
Violation issued (HPD, closed)
B
03/11/2019
Violation issued (HPD, closed)
B
03/11/2019
Violation issued (HPD, closed)
B
03/11/2019
Violation issued (HPD, closed)
B
02/17/2019
Violation issued (HPD, closed)
B
02/17/2019
Violation issued (HPD, open)
C
02/13/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/27/2019
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
A
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
A
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
A
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/18/2018
Violation issued (HPD, closed)
B
12/10/2018
Violation issued (HPD, closed)
B
12/10/2018
Violation issued (HPD, closed)
B
Latest 60 of 75 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO1007/08/2026
MHP REALTY1203/22/2026
NHP REALTY CO103/22/2026
ATIS REALTY COMPANY203/22/2026
DELUXE CONSTRUCTION103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HAIDER ENGINEERING, P.E.205/15/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HAIDER ENGINEERING, P.E.203/21/2026
HAIDER ENGINEERING P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JASCO, INCGeneral Contractor707/08/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJASCO, INC09/05/2023
DOB NOWSupported ScaffoldPermit IssuedJASCO, INC05/16/2019
DOB NOWSidewalk ShedSigned-offJASCO, INC05/15/2019
BISOTISSUEDDELUXE CONSTRUCTION06/04/2019
BISOTISSUEDDELUXE CONSTRUCTION12/14/2018
BISPLISSUEDP.S.I. MECHANICAL09/06/2017
BISOTISSUEDMHP REALTY LLC08/10/2017
BISPLISSUEDMARATHON MECHANICAL LLC07/30/2013
BISBLISSUEDMARATHON MECHANICAL LLC07/30/2013
Nothing on file for this building.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch - Sidewalk Shed1
08/28/2026Q00165731-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Supported Scaffold1
08/28/2026Q00165728-I1Request digital key ↗
▸Applications & Permits11
▸BISWORK PERMIT APPLICATION6
06/05/2019440526584Open ↗
12/12/2018440526584Open ↗
09/18/2017421483148Open ↗
Showing 3 of 6 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION4
12/12/2018440526584Open ↗
11/22/2017421483148Open ↗
11/13/2017421483148Open ↗
Showing 3 of 4 on file for this type
▸BISINTENT TO REVOKE APPROVAL/PERMIT1
11/28/2017421483148Open ↗
▸Seals & Professional Certifications13
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
12/20/2019440526584Open ↗
08/01/2017421483148Open ↗
04/17/2014440097725Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/28/2026Q00165728-I1Open ↗
08/13/2026Q00165731-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
08/01/2017421483148Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/01/2017421483148Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE2
10/09/2013440097725Open ↗
09/12/2013440097725Open ↗
▸BISSCHEDULE B - PLUMBING1
07/30/2013440097725Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
07/30/2013440097725Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/13/2017421483148Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/09/2013440097725Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/12/2018440526584Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
12/20/2019440526584Open ↗
08/01/2017421483148Open ↗
04/17/2014440097725Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
12/20/2019440526584Open ↗
04/15/2014440097725Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
12/23/2019440526584Open ↗
04/17/2014440097725Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
04/17/2014440097725Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
08/01/2017421483148Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
12/20/2019440526584Open ↗
12/12/2018440526584Open ↗
08/01/2017421483148Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms4
▸BISEFILING JOB APPLICATION COVER SHEET2
12/12/2018440526584Open ↗
07/30/2013440097725Open ↗
▸BISBOROUGH INTAKE FORM1
08/15/2017421483148Open ↗
▸BISEFILING COVER SHEET1
08/01/2017421483148Open ↗
▸Other Documents1
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
08/13/2026Q00165731-I1Open ↗